Laserfiche WebLink
Nardy Khan - Deputy Director <br />County of Orange Public Works <br />300 N. Flower Street <br />Santo Ana, CA 92702 <br />714.920.7454 <br />nardy.khanQocpw.ocgov.com <br />O <br />11 <br />PublicWorks <br />HZ prepared PS&E and -right-of-way documents for the County's 3.7 -mile -long, $75 Million La Pata Avenue gap closure and widening project. <br />Liza Munoz, PE - Senior Office Engineer <br />Inland Empire Utilties Agency <br />6075 Kimball Avenue <br />CA 91708 Inland Em Ire UtilitiesFlgenty <br />Chino, <br />909.993.1522 hMIANICIPAI NATER DISTRICT <br />Imunoz@ieua.org <br />AZ designed a roadway widening along EI Prado Road and Mountain Avenue for the City of Chino. <br />.ate 1�1 u. ,1.K . .. 1u �. m� �.� , ., ,,.n 11r, 1, ,1.,,,,, <br />Lupe Camacho - City Project Engineer <br />City of Chino Public Works <br />13220 Central Avenue <br />Chino, CA 91710 <br />909.384.3406 <br />loamacho@cityofchino.org <br />HZ prepared the preliminary and final drainage analysis and improvement plans for the extension of a 72 -Inch storm drain mein along Ross <br />Avenue, Walnut Avenue, and Magnolia Avenue from Riverside Drive to the 60 Freeway. <br />City of Santa Ana Civil Engineering Services: RFP 17-083 15 <br />25E-239 <br />