Laserfiche WebLink
documentation and resource agency permitting, They are experienced, In taking a project from conception to final <br />btllld•out,.and provide environmental compliance service's in support of design and construction ongineertng, Our <br />team's environmental services Include: CgOAINEPA documentation, groundwater protection, environmental audits, <br />environmental compliance, natural resource investigations, stormwater management, and more, <br />Storm Drain Design and Drainage Analysis, Klmley Horn's drainage engineering servioes-include the design.of <br />canals, doterdlon basins, culvert crossings, water control structures, diversion structures, pump stations, and more, <br />Our engineers have been called upon by numerous public agencies and major agricultural, Industrial, and residential <br />developers to conduct preliminary studies and drainage consultation, prepare stormwater management plans, perforin <br />watershed and ftoodplain analysis, prepare stern draln master plans, and coordinata permit applications on their behalf, <br />Structural Analysis. Ktmley-Horn's structural engineering: team provides structural design and analysis for arrange of <br />majorretaining structures, parking structures,; roadway bridges, pedestrlanbddges, to minor footings and foundations for <br />traffic Signals, roadways)gns, end.storm draln structures, Our structural engineers have axtonsive oxperiance working <br />with public agenoles.ono are familiar with routine plan check processes for multiple agencies. <br />Construction and Bid Support; Our loam Is equippad with the latest construction management Systems and <br />applications ovaliatile In the industry. These tools are scalable and customizable to fit the City's project needs and budget, <br />and to Integrate with the City's' existing standards, From simple, time -tested forms and procedures, to advanced <br />constrwatfon management and web»based systems, our team will deliver small and large projects on-time and <br />under budget while keeping the City up to date on a "real-time" (iasis. in addition to our design team's experience <br />with design relevant topics, our construction phase personnel can attend pre -construction conferences and regular project <br />meetings, provide review and approval of submittals, as well as other activities. nocessary to achieve well,ceordinated <br />construction projects of proposed Improvements. <br />Approach to Yotrr Qn-Call <br />Through our five decades of experience working with on -coil clients, we have learned valuable lessons that have helped <br />us create a unique approach to meeting out clients'.needs, We understand the urgency associated with federally funded, <br />time sensitive, or public safety projects, and we are equipped to allocate sufficient resources to meet deadlines and the <br />City's capital improvement program schedule. Our approach to your on-call tasks entails the following; <br />Project Managoment—Single Point of Contact: We have widespread expertise, and experience In all facets of <br />municipal projects. Klmley-Horn's project manager, Darren Adrian, P.S., will serve as the primary point of contact, and <br />will manage the team through the length of the contract. He hag over 27 years of municipal engineering experience and <br />managed Several projects with various cities in California. His experience includes design, planning, anti construction of <br />major roadways, transportation facilities, streetscape Improvements, and utilities and Is knowledgeable of federal, state, <br />county, and municipal regulations. Darren will oversee and revtow the engineering activities Including engineering design, <br />studies, Investigations, peer review, surveying, suboonsultont review, and other related actfvitfes. He will be available to <br />City staff for a timely response to service requesta, including questions about budgets, invoices, and schedules. <br />Before a project starts, Darren will conduct a project scoping meeting with all respective team members to brainstorm <br />the project issues, Our team will conduct a project initiation meeting with the appropriate team members to coordinate <br />the project plan Including milestones, doliverables, and current project events, project coordination meetings will be <br />scheduled based on theproject duration to make sure the project remains on track. <br />City of Santa Ana I rR0077=17 <br />25E-24 <br />Kimley*Horn <br />