Laserfiche WebLink
A. Aqua Freed CO2 injection: Effective at removing mineral incrustation, biological fouling, and physical plugging. <br />geological penetration, It is 100% green, and environmentally sound with no adverse chemical waste stream. <br />Provides extensive f <br />B. Chomicai andAc!d Cleaning: Used in Conjunction with pumpfagand surging it is effective at dissolving minerals and impacting biological <br />activity and physical plugging of sands, The chemical solution Is tailored specifically for the plugging problem. R offers limited geological <br />formation penetration and produces a waste stream of spent chemicals that must be neutralized. and disposed of properly. <br />OPTION 0: GENERAL ENGINEERING (OTHER THAN WATER RESOURCES) <br />• Conceptual street widening and rehabilitation including parkway improvements <br />• New bike lane <br />• Intersections are complete <br />PRELIMINARY ANALYSIS: <br />1. Exclusions <br />» Traffic signals and median design <br />Traffic Report <br />» Right -of -Way Services <br />2. Assumptions <br />» Water, sewer, and dry utilities will be protected in place » Manholes and valves will be adjusted to grade <br />Storm drain will require retrofit to new curb and gutter alignment » Street lights and illumination design required <br />» <br />Most meet water quality requirements u Sound wail required <br />HU(1T-03IL[ARS <br />25E-276 <br />City of Santa Ana Civil Engineering Services: RFP 17-083 6 <br />x <br />More specifically for this proposal the City Is seeking submittal ofqualifications for two options. Design and construction support services for, <br />OPTION A: WATER RESOURCES <br />• Rehabilitation of a 30 year old water well <br />,b <br />• 1500 LF of domestic water design (12" PUC) <br />• 600 LF of sewer design (W' Material TBD) with arterial street <br />PRELIMINARY ANALYSIS: <br />1. Sewer Materiel: Many factors should be considered when determining the best material for sewer construction. These include: <br />D Corrosion » Weight <br />CI', <br />» Abrasion » Imperviousness <br />t <br />» Strength » Cost' <br />n Durability » Nydrau0c Efficiency <br />Of the many materials available each offers a sot of unique advantages and disadvantages. For a 15" pipe, the material most <br />� f <br />commonly used In local cities under an arterial roadway would be vitrified clay pipe (VCP). It performs well in typical urban loading <br />conditions and maintenance departments are well prepared to work with it. Our experience would have us assume VCP will be high on <br />>i <br />the list of options, <br />2, The City has determined that tire existing water well performance dropped by 35%, This percent is above the 25% rule of thumb that <br />�p <br />would Indicate It's time for rehabilitation. The RFP mentions that the water well Is a sand producers but does not Indicate if the sand <br />production has increased. It is our assumption that the City has concluded that the sand production rate is within an acceptable range <br />and that the information is meant to determine that the aquifer type is "Sandstone." The most prevalent water well problems for this <br />type of aquifer would be: <br />• FISSURE PLUGGING - CASING FAILURE - SAND PRODUCTION - CORROSION <br />The anticipated maintenance frequency for a sandstone aquifer would average 8 years. if the well has dropped 35% over 15 years this <br />Vit' <br />is within the anticipated limits and sand production has not Increased, casing failure is unlikely. It is also our assumption that surface <br />equipment has been evaluated and that the well was constructed with corrosion In mind. This leaves plugging as the likely cause for <br />loss of production! We anticipate that Iudherevaluation will lead to the following rehabilitation methods: <br />r <br />A. Aqua Freed CO2 injection: Effective at removing mineral incrustation, biological fouling, and physical plugging. <br />geological penetration, It is 100% green, and environmentally sound with no adverse chemical waste stream. <br />Provides extensive f <br />B. Chomicai andAc!d Cleaning: Used in Conjunction with pumpfagand surging it is effective at dissolving minerals and impacting biological <br />activity and physical plugging of sands, The chemical solution Is tailored specifically for the plugging problem. R offers limited geological <br />formation penetration and produces a waste stream of spent chemicals that must be neutralized. and disposed of properly. <br />OPTION 0: GENERAL ENGINEERING (OTHER THAN WATER RESOURCES) <br />• Conceptual street widening and rehabilitation including parkway improvements <br />• New bike lane <br />• Intersections are complete <br />PRELIMINARY ANALYSIS: <br />1. Exclusions <br />» Traffic signals and median design <br />Traffic Report <br />» Right -of -Way Services <br />2. Assumptions <br />» Water, sewer, and dry utilities will be protected in place » Manholes and valves will be adjusted to grade <br />Storm drain will require retrofit to new curb and gutter alignment » Street lights and illumination design required <br />» <br />Most meet water quality requirements u Sound wail required <br />HU(1T-03IL[ARS <br />25E-276 <br />City of Santa Ana Civil Engineering Services: RFP 17-083 6 <br />