My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nardy Khan - Deputy Director <br />County of Orange Public Works <br />300 N. flower Street <br />Santa Ana, CA 92702 <br />714.920.7454 <br />nardy.khan0o pmacgov.com <br />O R A N G E 0 0 0 6 Y Y <br />)PubllcW orks <br />HZ prepared PSH and right-of-way documents for the County's 3.7 -mile -long, $75 Million to rate Avenue gap closure and widening project. <br />Liza Munoz, PE - Senior Office Engineer <br />Inland Empire Utilities Agency <br />6075 Kimball Avenue <br />Chino, CA 91708 <br />909.993.1522 <br />Imunoz@ieua.org <br />HZ designed a roadway widening along EI Prado Road and Mountain Avenue for the City of Chino. <br />lntattd Emprre UNlirfes Agency <br />A MUNICIPAL WATM DISTRICT <br />IA`Ati CH:' -3 �Nl CXSM NY2 W:.�iA PLL P.^M1d i(+E¢il M.W 44143 MtlM� mW. Y'�Ltl LLeW.:_ x.� 3. U"•K' Nv'c. W hu_"L i W.�v tl!4 <br />Lupe Camacho - City Project Engineer <br />City of Chino Public Works <br />13220 Central Avenue <br />Chino, CA 91710 <br />909.334,3406 <br />leamacho@cityofchino.org <br />HZ prepared the preliminary and final drainage analysis and improvement plans for the extension of a 72 -inch storm wain main along Ross <br />Avenue, Walnut Avenue, and Magnolia Avenue from Riverside Drive to the 60 Freeway. <br />City of Santa Ana Civil Engineering Services: RFP 17-033 15 <br />25E-285 <br />
The URL can be used to link to this page
Your browser does not support the video tag.