Suh-Task 17 Dry DHNks — Undergrounding existing powerilnes Is possible if SCE accepts proposed switch locations. As described In the! <br />approach coordination with SCE would occur in two phases. Our current scope is limited to street design. HZ will coordinate with third party; <br />purveyors to find feasible alignments for dry utility. The proposed alignment would be incorporated into a conflict exhibit for evaluation.- The- - <br />coordination is limited to the street improvement design period. ' <br />84-Taskl.86padficatlens—HZ will utilize City of Santa Ana standard bid specifications and/or the latest edition of the Standard Specifications <br />for Public Works Construction and edit them to fit the project requirements. ) <br />Sub-TaskMEstimatas of Probable Cost— HZ will prepare estimates of probable cost for the proposed Improvements. <br />Sub-task).10014P/ons-HZwill prepare utility plans this Includes on option for potholes to investigate existing utility size and depth. Further <br />Investigation will be necessary where record information is unreliable and thought to cause a conflict with proposed improvements. Existing <br />manholes will be dipped where possible to verify inverts and pipe size. Notices will be sent to impacted utility companies and every effort will be 0 <br />made to resolve conflicts prior to 60% submittal. <br />SulrTaskf.l l Dlsposidon Plans— Removals are limited to Infrastructure within project limits <br />Suh•Taskl.l2tYaierWollRohabfl/tatfanPlan <br />Suh-TaskJ.19 8ffsftelmpraysmentplans-Precluded �"� <br />Option A: Typical Street improvement set will include: Option O: Typical Street Improvement set will include: <br />1. Title Sheet 1. Title Sheet 9. Signing & Striping Details ' <br />2. Index Sheet 2. Index Sheet 10. Sound Wall Plan - (3 shoots) <br />3, Disposition Plan 3, Disposition Plan 11. Sound Walt Details <br />4. Street Plans (If Required) A, Street Improvement Plans (5 12. Streetlight Pian (3 sheets <br />5. Utility improvement Plans (2 sheets) shoots) double stacked) <br />6, Water Well Rehabilitation Plan 5. Details & Typical Cross 13, Streetlight Details t i <br />7. Details and typical Cross Sections Sections 14. Landscape & irrigation Plan (3 <br />6. Storm Drain Improvements—(2 shoots-doubla stacked) J <br />shoots) 15, Landscape & Irrigation Details <br />7, Drainage Details ( j <br />8. Signing & Striping Pians (3 <br />sheets -double stacked) <br />TASK K: ConstruotianAdministrationServices (Optional) _ 0 <br />Sab-Task K.1 Old SoppedIIZ will be available to attend the pro -bid meeting. Our team will review contractor's RFis if requested by the City <br />during the bidding phase. <br />Sub -Task X2 Construction Support— HZ will participate in construction meetings H necessary. HZ will review submittals and shop drawings <br />required to support the construction contract. Reviews will be completed within 10 working days of receipt. Contractor change orders will be -� <br />I completed within two working days of receipt, HZ will be available as requested bythe City to resolve discrepancies in contract documents, HZ <br />will furnish necessary revisions to documents due to errors and/or omission at no cost, <br />$0 --ask A".8 Record Drawings — The contractor shall provide as•bulif redlines, HZ will revise approved plans per contractor comments to <br />produce record drawings. v <br />Sult-Task NdProJod Closo-Deet- HZ will assist in the development of the project punch list as related to the construction package prepared by <br />our team, <br />C/ <br />f � <br />i- UITEZOUM City of Santa Ana Civil Engineering Services: RFP 17-088 18 <br />25E-288 <br />