My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 0: Qeotochateai Studies/Reports/During — Review existing geotachnical report and prepare a comprehensive gootechnical investigation <br />including adequate borings for proper design of proposed work. Obtain required permits to conduct gootechotcai Investigations and perform <br />applicable lab test to provide Information necessary for a comprehensive. design, A draft copy of the gooteohnical report will be provided for review <br />and comment. Traffic control in accordance with W.AJ.D.H, Manual. <br />Snb-leskPavement fva/aatfon-Excluded but maybe rgquiied.forOption B <br />" Sub-TaskesAPbasel-Deferred: Acquisition Sorvi*Task <br />. <br />Sub-TasUth PhasB 1.- Deferred: Acquisition SCruiueSTask <br />I TASK E:TrafBcStudylRoport Excluded <br />TASK F:Environmental.fCEDA)-Exclushmsfor.bathOptions, <br />: <br />TASK D: Rlgflt^olVayAcquisition and Tempormry.Rorlstruotioa Easements (TCEs)-Right-of WayaegWsifion Isexcluded, HZ will Incorporatethe <br />preferred preciso alignment Into the V18 CADD Files. Plans will be evaluatedandTCE's would be provided, if necessary. <br />TASK H:Oraluage- Huitt-Zotlarsproposestoimpleatontthe recommendations from the draffelfywidpFLO<2Dmodel that accounts for backwater <br />affects on the storm drain Infrastructure, Sizing otthp infrastructure will be based on both hydrology and hydraulic computations to ba prepared <br />" as pari of the drainage report. A prelimioary*almage toport will be created along with the SO% submittal. Afloat drainage ropaiA will he provided <br />i with the final submittal, <br />" <br />TAS K l: Water Quality Management Plan (WQMP) <br />Sub -Task Gf — The design will account for the 50% rule In 00 009 MS4 Permit, which requires treatrnent,for 50%.of added or replaood <br />imparvlous areas: it will fmplamont green street principles to the maximum extent practicable, lf.the underlying soil does noVinfiHrste we <br />I anticipate using the parkway to provide blo-fdtration. HZ will prepare a PrelimtharyWQMP at the 30% stage that identify potential locations for <br />LiD BMPs and their Interactions with the onsite storm drain network. AZ will develop the Preliminary WQMP Into a Final WQMP consistent with <br />the Dounty's Technical guidance ldanual to accompany#lie final snbmliial. This -will include an ong noer's-osOmote of probable costs inclusive <br />of material, freight, and maintenance for the selected BMPs. <br />80-TaskUAW— Deferred: Construction Bid Task <br />TASK ): Plans, Specifications, and Estimates IPS&E): HZ will adhere to city.criteria, policies, procedure, and. standards. PS&E includes three <br />milestone deliverables -30%, 60%, and Final. Each milostonewillcommence after HZ has received review comments from the previous milestone <br />submittal. HZ will meet with the City after comments have been reviewed to resolve questions, All plan sheets will be prepared at.20 scale unless <br />otherwise approved and noted. <br />i SuA-Taskl.l Street improvements HZ will match the preeiso alignment of the constructed street. Plans will include record information <br />regarding utilities, obstructions, and appurtenant data, <br />sub -Task 12 Tropic Daslgn <br />Street Signals- Excluded <br />thaanolizatkrn Plan & Details — Plans will be completed to meet California.MOTCD standard, slgnage will be evaluated and updated for proposed <br />lone configuration. <br />Temporary Traffic Control Plans — Deferred: Construction Bid Task <br />Sub-Toskl sStmm Drain Design- Drainage improvement plans will be prepared at the different milestones. Backbone storm drain profiles will <br />bo pmvided along with the 30°% submittal. Profiles for lateral storm drains and storm drain detail sheets will be provided at the 60% and ties[ <br />submittels, <br />Sgh•Task.C4Wall Dosign— Design of masonry wall beight as specified by sound report or City but not to exceed 12'ieet <br />Sound Report.— Provided by Clay <br />$0-WA14Streattightlair& EllectriicalVas/ga—Typloallyexisting streetlights are owned by SCE, if the proposed improvements relocate more <br />than three street lights the proposed lights will be owned by the City ofSanta Ana, Street lighting design standards Will be coordinated with the <br />City of Santa Ana prior to commencing tiro design. the design will be per City of Santa Ana lighting standards and consideration will be given <br />to salvaging the existing light fixtures. <br />Sub-Task/.6Candscap/ngantl/rrigatfon Dos/ga--Conceptual landscape and irrigation pians will be prepared in conformance with City of Santa <br />Ana standards. Ourlandscape designers will work closely with our engineers to plan, design, and coordinate gateway features, public art, traffic, <br />and pedestrian lighting, signage, and site amenities, Our teem will coordinate with the City to responsibly design landscape and Irrigation <br />systems. Planting and Irrigation will be mindful of water conservation standards. <br />1 tl.tl t t MLM City of Santa Ana Civil Engineering Services: RFP 17-083 17 <br />25E-287 <br />
The URL can be used to link to this page
Your browser does not support the video tag.