Laserfiche WebLink
CSG P90POSALYO SANTA TINA <br />MILE ONE PaolEcr <br />Avenue. Design work included the installation of class iii bikeways with shared -lane markings, or "aharrowe <br />and appropriate stgnpge; bicycle loop detectors and pull boxes, camera systems at intersections on existing <br />signal mast arms with newcondults, and pedestrian push buttons post, and foundation. Additional scope of <br />work Included upgrades existing non�ADA compHiMtrgmps to ADA compliance, concrete Improvements; <br />Including sidewalk, curb and gutter, and valley gutter replacement, drainage Inlet modifications, monument <br />adjustment, and electrical pull boxes adjustments to,finisRed grade. <br />STREET RECONSTRUCTION AT VARIOUS LOCATIONS I CITY OF SAN MATEO, CA <br />The City of San Mateo selected CSG as their design consultants for street reconstruction at various locations. <br />The scope of work included mobilization; traffic controt; sign relocations; concrete lmprovements, include <br />Installation of ADA curb ramps, sidewalks, -curb & gutter and driveways, Concrete road pavement removals <br />and replacements, asphalt concrete grinding; asphalt concrete deep lift dlgoutrepairs; roadway reflective <br />crackingmitleatton via crack sealing, suligrade enhancementvotextile; het rnIx asphalt paving; utility <br />adjustments to grade; catch basin, RCC and HOPE storm drain pipe Installation; tree removal; pavement <br />stritaft markings, and markers; and either related work, Work also included the preparation of Gattrans. <br />encroachment permit. <br />VARIOUS STREETS AND ROADS PAVEMENT PROJECT (CITY OF MILLBRAE, CA <br />OSIS was selected by the City to perforro the:desjgn of pavement, <br />rehabiiftatfonfor a major City arterial, Mllibrae.Avenbe, and a <br />residential street,, Magnolia Avenue. The project. includecipavement <br />coring sample testing, surveying, pavement recommended ms <br />report, traffic handling pians. ADA curb ramp upgrades, traffic signal <br />repair and traffic detours. Stakeholder Coordination was required <br />with Caltrans Local Assistance forcompiiance with Federal funding <br />guidelines (an E-76 was obtained for this project), as wall as Caltrans <br />Encroachment Permit Department for coordination with Caltrans <br />design review staff regarding Caltrans owned facilities, <br />2016-17 STREET RESURFACING PROJECT I CITY OF STOCKTON, CA <br />Miner Avenue„krch Airportftoad, Pershing Avenue and March Lane are arterials and collectors which exhibit <br />alligator cracking, block cracking, longitudinal/transverse cracking, patching and utility cuts, rutting,. <br />depressions, spelling and some prpgressed to base failures. In order to recelve a Federal Regional Surface <br />Transportation Program Fund forFiscal Year 2016.17, Clty selected CSG to perform preliminary and final <br />design of pavementrehatrliitation, and prepare a pS&E bid package in an aggressive design schedule. The <br />scope of the project Included performing Initial visual assessment of pavementconditlons, conducting <br />pavement section Investigations including coring and deflection testing; selecting and recommending the <br />most appropriate pavement treatments with consideration of casts, construction duration and potential <br />Impacts to the pubtic, performing life cycle cost analysts for each selected pavement treatment alternative, <br />developing a pavement recommendation report with preferred treatments identified for each roadway, <br />locating existing survey monuments and right-of-way, assisting the City to file corner records after alterations <br />to the survey monuments, requesting utility maps from Stockton's Municipal Utility District, Cal Water <br />Services Company, PG&E, AT&T and Comcast and coordinating with these utility companies for adjustments <br />to their facilities, and preparing layout, traffic handling.and detour plans, construction cost estimate and <br />specifications, The types of recommended pavement rehabilitation treatments Included hat mix asphalt mill <br />and fill replacements, pavement base failure repairs (dlgouts), microsurfacing, pavement patch and leveling, <br />and crack sealing. <br />25E-327 <br />