My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CsG Pnoko9Al. TO SAW Ate: .,-.. -,. <br />MILE ONE Pnomcz---•---.-- <br />Scope of Services & Schedule <br />COMPLETE STREET <br />CSG has completed complete street engineering design for several agencies. These projects provide <br />accommodations for pedestrians, bicyclists, vehicles, and pubNetransportation in a safe and efficient <br />manner. The selection of appropriate surface materials must cater to the primary usar(s). Identifying <br />optimized dimerisions.based on right of way restrletions,"b0get,.and multi -usability can dictate the deslgn`s <br />grading, edge treatments, vertical clearances, and clearing and grubbing requirements, For ApA compliance <br />the design will meet all requinaments for longitudinal and cross slopes, width and helght ejeamnces,and the <br />use of detectable warning surfaces at vehicularcrossings. our approach to drainage design Includes analysis <br />of the drainage patt0n aird modifying the grading as needed, Implernentatlori bf catctl basins and buried <br />pipb networks to contact to existingstorm drain systems. cso comprehensive desiign includes all nec±essaty <br />signage; striping, lighting, and/or landscaping. providing usable and safe paths and/or trails for communities <br />Is an Important part of Mots services. <br />Street improvements <br />4$G staffinciudes complete streets and active transportation prroject <br />designers.wlth extensive experience on class 1, 43 and even the new <br />class 4 bicycle facilities. Soule key project components include: <br />Right of way <br />+ <br />Funding (federal vs. foot) <br />• Materials <br />• Shared use facilities <br />• Traffic Signal Integration <br />• Signage and channelizatlon <br />• SelesmVIem (buffer) from fthicles:(both high speed vehicles, <br />and parked vehicles can presenf hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DEIGN OVERVIEW AND APPROACH <br />CSG has a thorough understanding of the various steps that are Involved In delivering a successful bikeway <br />and streatscope project, as outlined in the table below: <br />CSG will work wig) city staff to deliver a successful, construction -ready project, Project <br />management and design development efforts will Include the following: <br />1. General Project • Fieldinvestigatlon <br />Management and • Finalize design concept <br />Design • Project Meetings <br />Development • Preparation of reports and recommendations <br />• Preparation of plans, spociifcations, and estimates (pS&F,) <br />• Manage project schedule and budget <br />• Bidding/construction support <br />2. Pavement Our staff Is experienced In a varlety of street rehabilitation strategies, and will roviewthe <br />following options for applicability on the Mile One project: <br />25E-331 <br />
The URL can be used to link to this page
Your browser does not support the video tag.