My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C5G PaOPOSAETOSAKMANA <br />M0.EGNEPaOIECr <br />COMPLETE STREET <br />CSCE has completed complete street engineering design for several agentlea. These projects provide <br />accommodations for pedestrians, bicyclists, vehicles, and public transportation In asafe and efficient <br />manner. The selection of appropriate surface materials must cater to the primery usar(s), Identifying <br />optimized dimensions based on right of way restrictions, budget, and multi -usability can dictate the design's <br />grading, edge treatments, vertical clearances, and clearing and grubbing requirements, For ADAcompfiance <br />the design will meet all ratfulroments for longitudinal and cross slopes, width and height clearances, and the <br />use of detectable warning surfaces at vehicular crossings, Our spprbach to drainage design lndludes analysis <br />of the drainage paiternand modifying the grading as needed, ImpieMentation of catch basins and buried <br />pipe networks to connect to existing storm drain systems:. CSIS comprehensive design lneiudot oil necessary <br />aigrlage, striping, lighting, andlorlandscaping. Providing usable and safe paths and/or.trails for communities <br />is an Important part of CSG's services, <br />Street Improvements <br />CSS staff includes Complete streets and active. transportation prroject <br />designers with. extensive oxperianee on class t, 2, � and even the new <br />class a bl€pcte facilftdes. Some hey project components Include: <br />• Right of way <br />• Fimding(federalvs.local) <br />• Materials. <br />• Shared use fa€illtles <br />• Traffic Signal Integration <br />• Signage and channelization <br />• separation (buffer) from vehicles (Both high speed vehicle's, <br />and parked vehicles can present hazards) <br />• Crossing locations with vehicles <br />GENERAL PROJECT DESIGN OVERVIEW AND APPROACH <br />CSG has a'thorough understanding of the various steps that are Involved in delivering a successful bikeway <br />and streetscape project, as outlined In the table below: <br />CSG will work with City staff to deliver a successful, construction -ready project. Project <br />management and design development efforts will include the following: <br />1. General Project a Field Investigation <br />Management and • finalize design concept <br />Design ® Project Meetings <br />Development 0 Preparation of reports and recommendations <br />Preparation of pians, specifications, and estimates (PS&F) <br />• Manage project schedule and budget <br />• Bidding/construction support <br />21 Pavement Our staff is experienced In a variety of street rehabilitation strategies, and will review the <br />following options for applicability on theMile One project: <br />25E-332 <br />
The URL can be used to link to this page
Your browser does not support the video tag.