Laserfiche WebLink
Michael <br />./^1t <br />Fisher CSG <br />PE,QSQ/P <br />Principal Engineer ocaSusranrre <br />Nfta/ <br />LICENSES and <br />Mr. Fisher is a civil engineerwith over 25 years of experience in civil/roadwaydoslgn, <br />CERTIFICATIONS <br />drainage design, traffic engineerifl& specification writing, engineering report writing and <br />rrofcssional (W 61111"Or <br />project management He has managed tearhs of engineers, working to deliver ever a <br />Start dC044a <br />dozen projects ranging in size from $20,000 to $22,000,600 with project status ranging <br />j 6S665o <br />from project initiation/faasibillty/stydy phase to approval/ehvironmentat phase to final <br />Qualified MRAaveloperlPralitipnor <br />design[ and construction. Mr6 fisher has extensive experience workingon roadway design, <br />jisS63 <br />Including Inter§action and m0dian projects. His design wofklnclodes horizontal and <br />vertical geometriclayout,utilitycoordination,trafficsignaldesign,.signingandstriping <br />EDUCATION <br />design and drainage design. His projects have.. incorporated current LID design practices <br />6adilor of Woo, civil t110099. <br />including bleisltration, Infiltration, and detention basins. <br />San Jose Stats Jost, CA <br />lSan jest, tF <br />RELEVANT EXPERIENCE <br />PROFESSIONAL <br />SunnyvolePovementRehabilitation2017ICity of Sunnyvale, CA <br />AFFILIATIONS <br />Mr, Fisher served as the project Manager forthis annual street pavement rehabilitation <br />svpo gay 7rgnspnnaiioa offios,udidatlo <br />projwe The scope involved the rehabilitation of 2 streets in the City of Sunnyvele. Work <br />lspq, Past Prtsidtht <br />included the design of grindand HMA overlay, digou% utility adjustments, curb ramps, <br />Taastmaners Inlemational <br />concrete sidewalk, curb, gutter and driveway replacement,;aod striping plans, <br />M. <br />fair Oaks Bikeweyand StreatscapeI City of 5unhyvaie, CA <br />Mr. Fisher served as the Project Manager for the design of Class 2 Bicycle Lanes on Fair <br />Oaks Avenue. between Old San Frandsec Rand to Evelyn Road, â–ºFifer Avenue to Artiues. <br />Avenue, and Wolfe Road to Ahwanee Avenue, Key project -elements Included <br />reconfiguring the roadway, roadway resurfacing, addition oY greed bike lanes, <br />modiffcatIbM to the existing concrete median islands, modification otparking, and <br />installation of related signage, Mr. Fisher led public outreach meetings to keep the <br />residents Informed of the project. <br />First Street and City Ailey Resurfacing Project I City of 'Los Altos, CA <br />Mr. Fisher served as the Project Manager for these two resurfacing projects, which <br />Involve robabllitation of 20 city alleyways as well as frlrst Street between West Edith <br />Avenue and State Street, He oversaw preparation of the project pS&E package, Basis of <br />Design Report, and coordinated with utility owners for adjustments of their facilities. <br />JuniperoSerra atKing Boulevard Intersection Improvements ICity of South San <br />Francisco, CA <br />Mr. Fisher served as the Project Manager for this bicycle and pedestrian friendly traffic <br />signal upgrade project. The project goat was to Improve mobility for all modes, and brings <br />the Intersection up to current standards for bicyclists, pedestrians, and ADA access. <br />Project included preliminary design, community outreach, agency coordination including <br />Caltrans.. The project scope included redesign of the existing medians and right -turn <br />Islands to Improve intersaction geometry and provide ADA compliance, replacement of <br />the existing traffic signals located in the median with mast arm signals to Improve <br />visibility, addition of a speed feedback sign on southbound Juntpero Serra, and extension <br />of existing bike lanes along Juniparo Serra Boulevard through the King Drive Intersection <br />to Improve bicycle safety. <br />W. Edith and University crosswalk improvements I City of Los Altos, CA <br />Mr, Fisher served as the project Manager for the design of traffic calming elements to <br />allow for safe visible crossing of Edith Avenue. The design also included the installation of <br />crosswalk signs and in -ground warning lights, <br />25E-356 <br />