Laserfiche WebLink
Amir <br />Abdul W t%" G <br />EIT TANTS <br />Associate Engineer N4010A' <br />UCBNSES and <br />Mr. ylbdolfahl has over three years of engineering design and construction Inspection <br />@ERTiFICATES <br />experience. His design background includes s variety of public works projects involving <br />Enginur in Training <br />pavement rehabilitation, grading, drainage system improvements, estimates, and <br />$tire cf California <br />'Standard Detali Revisions. He IsknowledgeoNe in AutoCAD Civil 30. <br />RELEVANT EXPERIENCE <br />EDUCATION <br />badela' dfyaxe, fPoq Et>timarinp <br />2016.17 Street Project Cit of Stockton, CA <br />g j � Y <br />W jos feta Uaiaasq <br />Mr, Abdotlahi served as a design angineer for the preparation of PS&E document for the <br />t $asjasa, CI <br />pavement rehabilitation project. This pavement rehabilitation project includes hot mix <br />asphalt mill. and fill replacemerlts, pavement base failure. repairs (dfgouts), microsurfactng, <br />PRoFgsslokAL <br />PaV.ernantpatchmodcrackseaiing,upgradeADA-compllantcurbramp;adjustmentto <br />AFFILIATIONS <br />existing utility facilities end mount€ntt topreposodfinfsh€:dofarde, replacement of <br />Antrim fedeq of. 11 Eiyiaeto (ASCE) <br />existing traffic signal detector loops, trimming of tree roots and canopies, and Installation <br />Toastaustta lnraMatianal <br />of pavement markings and striping. <br />rice pre idar, Education <br />Various streets & Roads Improvement Project t City of Milabra€, CA <br />MG Abdulshi served as aDesign EnginearforI;Wpavemontprojectwhich involved a major <br />Cityarterlaf Millbrae Avenue, and a residential Street, Magnolia.Avonua.The project also <br />Included pavement daring sampietesting .surveying, pavement recommendations report, <br />traffic handling plans, ADA curb ramp upgrades, traffic signal repair and traffic detours. <br />Measure ) and. t & Annual Pavement Rehabilitation2p15 )City af0rIada, CA <br />As Project. Engineer,Mr. Abdoilahl was responsible for the field assessments, utility <br />company coordintlon, development of PS&E documents, endas&Isted In the preparation <br />of addendums and bid support, The Measure a & t project rehabtfitated local/yesidential <br />roads with a PC[ value less than 25. -The scope included identifying various depth of full <br />depth rehabliltat on to rehabilitate 23 local roads and two collector roads within the Clty <br />of Orinda. <br />Millbrae Various Streets and Road Preservation City of Millbrae, CA <br />Mr. Abdolla.hl assisted In preparing the PS&E design along with the Caltrans Field Review, <br />Environmental Clearance, Encroachment Permit, Right of way Certification, and Caltrans <br />E76 documents. The City had an One Day Area Grant (r38AG) funded project that required <br />road pavement to be rehabilitated along segments of Millbrae Avenue (From EI Camino <br />Real to Old Bayshore Highway) and Magnolia Avenue (Taylor Blvd to to Cruz Avenue), <br />Ell MontvRoad Preservation Project I Town of Los Altos Mills, CA <br />As Project Engineer, Mr. Abdollahi conducted a s6rles of field assessments regarding <br />pavement reconstruction limits, road and striped lane dimensions, concrete <br />improvements, and ADA compliance needs an project that spanned 1.5 miles. Amor also <br />assisted with the Federal Grant Administration process and coordinated with the Caltrans <br />Local Assistance department forthe entire span of the project. Developing the Field <br />Review, Preliminary Environmental Study (PES), E-76 Authorization for Construction, and <br />EncroachmentPormit forms, Amir was also able to perform quantity takeoffs for all <br />streets to assist in the development of the engineer's estimate. <br />Dairy Knolls Stair and Pathway Improvements Town of Tiburon, CA <br />in this stair and pathway Improvement project; Mr. Abdollahl conducted a topographic <br />survey to develop the plans and estimate for a pathway with a staircase that connected <br />an after school daycare to an elementary school. During this process, Mr. Abdoilahl was <br />asked to design up to three different approaches with a recommended choice for the <br />staircase and pathway. <br />25E-361 <br />