Laserfiche WebLink
2016 Street Reconstruction at Various Locations I Cl ty of San Mateo, CA. <br />Me, Seto served as the design Engineer for street improvements atvarlous locations <br />throughout San Mateo. The project Involved concrete road pavement removals and <br />replacements of various streets, Installation of ADA curb ramps, sidewalks, curb & gutter, <br />and driveways, Also Included were utility adjustments to grade, installation of catch <br />basins, RCP and HDPE storm drain pipe Installation, pavement striping, markings, and <br />markers; and other related work. He also managed the preparation of Caltrans. <br />encroachment permit. <br />Mary Avenue Bike Lane I City of Sunnyvale, CA <br />Mr. Seto served as CS6's design engineer for this project: The scope involved Installing a <br />class 11 bike lane ran both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles), <br />Civil scope of work includes concrete improvements, asphalt concrete digout repairs, <br />Crock sealing, slurry seal, utility adjustments and other related work. <br />MeestaroJandL&AnnualpavementRehabilltation2015jCity of Orinda, CA <br />This Measure I & L project rehabilitated Local%residential roads with a PCI value less than <br />25. The scope Included Identifying variousd'epths of full depth rehabilitation to <br />rehabilitate 23 local roadsand two collector roads. As Project Engineer, Mr. Seto was <br />responsible for the field assessments, utility company coordination, and devel6pment of <br />PS&E documents. He also assisted in the preparation of addendums and bud support. <br />25E-360 <br />CSGDavid Setas <br />PE OONSULTANTS <br />Senior Engineer <br />LiCENSO and <br />Mr. Seto Is a Senior Engineer with over 12 years of experience In the transportation field. <br />CERTIFICATIONS <br />Me, Seto has been a project engineer for multiple trensportgtion projects and was <br />IyolasioW Engineer <br />responsible for the preparation of plans, specifications, and estimates for traffic signals, <br />Sbie.sf (lama <br />j DEME <br />lighting, traffic operation system, ramp metering, streetscepe improvements, roadway <br />intersection, grade separations, and stage construction projects. He is knowledgeable of <br />EDUCATION <br />.and has prepared designs to Caltrans, Counties, and Cities standards, He Is proficient In <br />4(wtor dSdeA (W Rag"Ort <br />the use of MicroStation and AutoCod Civil 3D. <br />UniveaitynfisAbmlaDO <br />RELEVANT EXPERIENCE <br />ma <br />Beach and Reservation Road Roundabouts j Oty of Marina,. CA <br />pROPESSI6NAL <br />Mr. Seto was the Project Engineer for this roundabout project for the City of Marl". The <br />AFFILiAmisis <br />project created two roundabouts, stone.ef the city's main antrances adjacent to e <br />kWo Poblic Wok Amclalas (APWA) <br />freeway Interchange. The project helped create a gateway entry statement to one of the <br />ioasfeattn interssatfassl <br />City`s main commercial corridors. The scope aisoincluded decorative lighting, bicycle and <br />5cevotal <br />pedestriah safety improvements, and landscaping improvements to create an attractive <br />Club: 4a4%Ii <br />entry to the city, <br />PairpaksBike%veVzndStreetscepeICity of Sunnyvale, CA <br />Mr. Seto served as the Project Engineerfor this projeetrThe scope iirvoived the <br />fnstallotion of Class III green bicycle markinp..and bicycle detector markings along with <br />various intersectlon improvements. Workinctudeii the detailed grading design ©fteverai <br />curb returns to meet ADA requirements, restriping of various intersections and <br />replacement of concrete sidewalk, curb and.gutte'r. <br />2017PavemehtRehabiiftatioaiProject(City of Sunnyvale, CA <br />Mr. Seto served as the Project Engineer foe this annual streetpavem'ent rehabilitation <br />project. The scope Involved the rehabilitation of 2 streets In the City of Sunnyvale. Work <br />included the design ofgrindand HMA overlay,.digouts, utility:adjustmgnts, curb ramps, <br />concrete sidewalk, curb, gutter and driveway replacement, and striping pians. <br />2016 Street Reconstruction at Various Locations I Cl ty of San Mateo, CA. <br />Me, Seto served as the design Engineer for street improvements atvarlous locations <br />throughout San Mateo. The project Involved concrete road pavement removals and <br />replacements of various streets, Installation of ADA curb ramps, sidewalks, curb & gutter, <br />and driveways, Also Included were utility adjustments to grade, installation of catch <br />basins, RCP and HDPE storm drain pipe Installation, pavement striping, markings, and <br />markers; and other related work. He also managed the preparation of Caltrans. <br />encroachment permit. <br />Mary Avenue Bike Lane I City of Sunnyvale, CA <br />Mr. Seto served as CS6's design engineer for this project: The scope involved Installing a <br />class 11 bike lane ran both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles), <br />Civil scope of work includes concrete improvements, asphalt concrete digout repairs, <br />Crock sealing, slurry seal, utility adjustments and other related work. <br />MeestaroJandL&AnnualpavementRehabilltation2015jCity of Orinda, CA <br />This Measure I & L project rehabilitated Local%residential roads with a PCI value less than <br />25. The scope Included Identifying variousd'epths of full depth rehabilitation to <br />rehabilitate 23 local roadsand two collector roads. As Project Engineer, Mr. Seto was <br />responsible for the field assessments, utility company coordination, and devel6pment of <br />PS&E documents. He also assisted in the preparation of addendums and bud support. <br />25E-360 <br />