2016 Street Reconstruction at Various Locations I Cl ty of San Mateo, CA.
<br />Me, Seto served as the design Engineer for street improvements atvarlous locations
<br />throughout San Mateo. The project Involved concrete road pavement removals and
<br />replacements of various streets, Installation of ADA curb ramps, sidewalks, curb & gutter,
<br />and driveways, Also Included were utility adjustments to grade, installation of catch
<br />basins, RCP and HDPE storm drain pipe Installation, pavement striping, markings, and
<br />markers; and other related work. He also managed the preparation of Caltrans.
<br />encroachment permit.
<br />Mary Avenue Bike Lane I City of Sunnyvale, CA
<br />Mr. Seto served as CS6's design engineer for this project: The scope involved Installing a
<br />class 11 bike lane ran both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles),
<br />Civil scope of work includes concrete improvements, asphalt concrete digout repairs,
<br />Crock sealing, slurry seal, utility adjustments and other related work.
<br />MeestaroJandL&AnnualpavementRehabilltation2015jCity of Orinda, CA
<br />This Measure I & L project rehabilitated Local%residential roads with a PCI value less than
<br />25. The scope Included Identifying variousd'epths of full depth rehabilitation to
<br />rehabilitate 23 local roadsand two collector roads. As Project Engineer, Mr. Seto was
<br />responsible for the field assessments, utility company coordination, and devel6pment of
<br />PS&E documents. He also assisted in the preparation of addendums and bud support.
<br />25E-360
<br />CSGDavid Setas
<br />PE OONSULTANTS
<br />Senior Engineer
<br />LiCENSO and
<br />Mr. Seto Is a Senior Engineer with over 12 years of experience In the transportation field.
<br />CERTIFICATIONS
<br />Me, Seto has been a project engineer for multiple trensportgtion projects and was
<br />IyolasioW Engineer
<br />responsible for the preparation of plans, specifications, and estimates for traffic signals,
<br />Sbie.sf (lama
<br />j DEME
<br />lighting, traffic operation system, ramp metering, streetscepe improvements, roadway
<br />intersection, grade separations, and stage construction projects. He is knowledgeable of
<br />EDUCATION
<br />.and has prepared designs to Caltrans, Counties, and Cities standards, He Is proficient In
<br />4(wtor dSdeA (W Rag"Ort
<br />the use of MicroStation and AutoCod Civil 3D.
<br />UniveaitynfisAbmlaDO
<br />RELEVANT EXPERIENCE
<br />ma
<br />Beach and Reservation Road Roundabouts j Oty of Marina,. CA
<br />pROPESSI6NAL
<br />Mr. Seto was the Project Engineer for this roundabout project for the City of Marl". The
<br />AFFILiAmisis
<br />project created two roundabouts, stone.ef the city's main antrances adjacent to e
<br />kWo Poblic Wok Amclalas (APWA)
<br />freeway Interchange. The project helped create a gateway entry statement to one of the
<br />ioasfeattn interssatfassl
<br />City`s main commercial corridors. The scope aisoincluded decorative lighting, bicycle and
<br />5cevotal
<br />pedestriah safety improvements, and landscaping improvements to create an attractive
<br />Club: 4a4%Ii
<br />entry to the city,
<br />PairpaksBike%veVzndStreetscepeICity of Sunnyvale, CA
<br />Mr. Seto served as the Project Engineerfor this projeetrThe scope iirvoived the
<br />fnstallotion of Class III green bicycle markinp..and bicycle detector markings along with
<br />various intersectlon improvements. Workinctudeii the detailed grading design ©fteverai
<br />curb returns to meet ADA requirements, restriping of various intersections and
<br />replacement of concrete sidewalk, curb and.gutte'r.
<br />2017PavemehtRehabiiftatioaiProject(City of Sunnyvale, CA
<br />Mr. Seto served as the Project Engineer foe this annual streetpavem'ent rehabilitation
<br />project. The scope Involved the rehabilitation of 2 streets In the City of Sunnyvale. Work
<br />included the design ofgrindand HMA overlay,.digouts, utility:adjustmgnts, curb ramps,
<br />concrete sidewalk, curb, gutter and driveway replacement, and striping pians.
<br />2016 Street Reconstruction at Various Locations I Cl ty of San Mateo, CA.
<br />Me, Seto served as the design Engineer for street improvements atvarlous locations
<br />throughout San Mateo. The project Involved concrete road pavement removals and
<br />replacements of various streets, Installation of ADA curb ramps, sidewalks, curb & gutter,
<br />and driveways, Also Included were utility adjustments to grade, installation of catch
<br />basins, RCP and HDPE storm drain pipe Installation, pavement striping, markings, and
<br />markers; and other related work. He also managed the preparation of Caltrans.
<br />encroachment permit.
<br />Mary Avenue Bike Lane I City of Sunnyvale, CA
<br />Mr. Seto served as CS6's design engineer for this project: The scope involved Installing a
<br />class 11 bike lane ran both sides of Mary Ave from Fremont Ave to Maude Avenue (3 miles),
<br />Civil scope of work includes concrete improvements, asphalt concrete digout repairs,
<br />Crock sealing, slurry seal, utility adjustments and other related work.
<br />MeestaroJandL&AnnualpavementRehabilltation2015jCity of Orinda, CA
<br />This Measure I & L project rehabilitated Local%residential roads with a PCI value less than
<br />25. The scope Included Identifying variousd'epths of full depth rehabilitation to
<br />rehabilitate 23 local roadsand two collector roads. As Project Engineer, Mr. Seto was
<br />responsible for the field assessments, utility company coordination, and devel6pment of
<br />PS&E documents. He also assisted in the preparation of addendums and bud support.