My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO <br />DAVID N.IKNAFS, PE <br />daYld.nIknaIs@nv5,00m <br />949.585.0477 <br />Project Managet <br />................ ....... . a.,:....................... . . .......... . .... ........ <br />9XPERIENCV <br />Mr. R11008 1196 mere 80 years of civil engineering experience in the public <br />30 years <br />end private sectors %voildni on various capital Improvement projects and has <br />EDUCATION. <br />OX601%fio. OXPOddnce Working as a project manager end terror engineer, He has <br />M.S. Civil`Engineering <br />Managed numerous public worlm and i1belopmect pqacto including roadways, <br />bridges, drainage, sewer, Water, underground iAllitles, building.focilities and related <br />B.6. CIA.Enginso <br />...... Ong <br />Introstrocturo ImProvaintntprojocts, <br />LICENSES <br />He is in charge Of providing overall project direction to the project technical team <br />Civil Engiri <br />,. <br />No.42697 <br />and providing resource allocation; preparing and edclintsWrigbudgets preparing <br />and mon(boringprollect schddqIoa* Thornaging ProUlOh of piallininary.design <br />and final design; preparing varlTus detailed technical reports; providirieversight <br />Amorld6riNblIGINarks <br />and performing 00INY006W), Mbnagingand morilterIng-construntion aeflyfillds; <br />Msodlatldri (AOW�) <br />ostablishin& o0or0laoting and maintaining working rolationshiPs with owners, <br />American Society at civil <br />davdiogovs, ohd.dther agencies. <br />Engineers (ASCE). <br />ProjealExperlence <br />Developmentlnstktuts <br />.......... —.-A ... �.-, .,...........W... ...... . .. . ............... . ..... ............. <br />"H"Streat Widening project <br />CITY OF SAN OERNARDINO. I SAN BERNARDINO; CA <br />Project Manager. W 141knore Is responsible for providing professional design <br />engineering services hishi.dIng plans, specifications, cost estimates and related bid <br />documents for the widanIng.cif W Street from Kendall Drive to 40th Street, The <br />P. rojeot will Increase H Street from two lanes to four lanes and upgrade the Wati hg <br />traffic signals, at 40th Street and Kendall Drive. The plans will InclUde roadway, <br />drainage, sewer, signing and striping, street lighting; modification to traffic signals, and <br />demolition plans. Wire wPrdl"at1rig:wltb 0141ty companies, Identifying existing right- <br />of-way, conduoting.pavamont investigation and preparing:a report; and preparing all <br />required environmental studies and documents for clearance under CEQA, The street <br />Improvements will include ADA-compliant curb ramps. <br />Pacific Coast Highway Arterial Improvements <br />CITY OF REDONDO 9FAdj I REDONDO BEACH, CA <br />Projeot Manager. Mr. Nlknafs is managing a comprehensive traffic analysis and <br />the preparation of preliminary da$gn recommendations to reduce congestion <br />and Increase safety on Pacific Coast Highway. our team Is preparing final plans <br />speclopstiplis and cost estimates for the intersection widening for a right-tu rrrcnly, lane <br />on southbound Pacific Coast Highway and Torrance Boulevard, We will also provide <br />design and support services during bidding and construction phases. <br />Jamboree Road and Intersection Widening <br />-CITY OF IRVINE I IRVINE, CA <br />Pn)JOct Manager/Contract Manager, Mr. Niknafs Is responsible for providing program <br />and contract management services forthewidening of Jamboree Road from Main <br />Stlfttto.Borroma Parkway. The ProjectwIll widen Jamboree Road from four to five <br />N1 <br />V15 <br />through lanes In each direction. Intersection Improvement$ at Jamboree/Main and <br />Jamborea/Barrancs are currently In the design and right ofway phases and will be <br />constructed along with the widening. Mr. Nlknafs Is also responsible for coordination and <br />monitoring required for all phases of work, <br />25E-462 <br />
The URL can be used to link to this page
Your browser does not support the video tag.