Laserfiche WebLink
Harbor Boulevard Strut, Median and Landscape Improvements <br />CITY OF COSTA MESA I COSTA MESA, CA <br />Project Manager, Mr. Niknafa managed the preparation of pians, Gpeol.Boations,'bOd cost satimeteefor the. design of <br />Improvements on Harbor Boulevard; includingsti'Iset and Inadian l0ndetlsp1ng improvoments. The City weamwarded Federai <br />Hlghway Safety improvement Program funds totnstall Madlans.6 landscaping, and associated improvamsnis to improve <br />pedestrian and traffic safety, A traffic gnalysis was conducted to establish median oponings.and turn pocket lane length, a, <br />Our team doordinated with stakeholders Including the residents end business owners, and public outreach community <br />me6tlh94 were scheduled so the conceptual plans could be presented to the community, <br />East 19th Street Design Improvements <br />CITY OF COSTA MESA I COSTA'MESA, CA <br />Project Manager. Mr. Niknafs was ropi insible fo'r the design Of this roadwayy, median and parkway landscaping <br />imprrovements prglW The.prirjoot inquded khoremoval of reconstruction of pavement;and raconsiructipn.af qurb,,gutter, <br />crass gutter, sidewalk, Wheelchair ramp and driveway. His responsibilities Included managing the p're'paration of. the pians; <br />speoftationsand cost estimates; andassisting.the City with the preparation of PES and E-76 certification, as well es with <br />the submittal and processing through Caltrans, <br />Wilmington Avenue Pedestrian and Blpycl.e improvements <br />CITY OF COMPTON I COMPTON, CA <br />Project Manager. Mr. Niknafa was responsible for providing tyrd eioitai doslgn engineering services Including piens, <br />specliioatloris, cost estimates anti related Old documents for the. Wilmington Avenue Safe Streets Fedestrlaro/aky* <br />ImprovOment Prgject, The prajeet included pavement rehabilitation on Wilmington Avenue from EI Sogvindta Bculdiard to <br />Roaecrans Auerrue. Scope of work consisted of various pedestdan.and biOO$.irriprWameritip; Wo instailation.bf wider and <br />colored crosswalks; countdown pedestrian signals; enhahoetl padostran Ilgnting; the Installation of Class 11 biketaneswith <br />wayfinding signage and Glass I bike paths', and the installation of four solar -powered speed feedback signs for $peed contrci <br />and attainment <br />FY 2017.18 Annual Street Rehabilitation <br />CITY OF VILLA PARK VILLA PARK, CA <br />Project Manager. Mr, Niknsfs is responsible for provldingpians, specifications, and estimates for the annual rehabilitation <br />project. The improvements may include the removal and replacement of deteriorated $actions of thesfreets by repaving <br />or slurry seat the streets; construction of curb and gutter or AC burm at certain locations of these streets; and the <br />replacement of curb and gutters as needed to provide adequate drainage; <br />Colonial Avenue.Alley Pavement Project <br />CITY OF CULVER CITY I CULVER CITY, CA <br />Project Manager. Mr. Niknafa Is responsible for prWidingprofessional design services for the Colonial Avenue Alleyway, As <br />part of the Community'Development Block Grant(CDBG) program,theColonial Avenue Alleyway Paving project includes the <br />paving of approximately 800 LP by 20 feet wide of the alleyway. The scope of work also involves field revlew, topographic <br />survey, design plans, bid schedule and technical specifications, quantity and cost estimates. <br />Expo Line Bus Stop Enhancement Project <br />CRY OFSANTA MONICA I SANTA MONICA, CA <br />Project Manager.:Ourteam was selected to provide.engineerng design services for the Expo Line Bus Stop Enhancement <br />Project in Santa Monica, Phase 11 of the Expo Line extends the line to Santa Monica. As a result, Big Blue Bus is <br />impiomenting a comprehensive redesign of Its transit system to connect: passengers with the Expo Line stations in <br />attempt to create N more efficlant commute for passengers, These Initiatives also Include the Inclusion of signage, bus <br />berths and overall pedestrian Improvements. Our team Is providing preliminary, sohamatic and final design to Include <br />construction documents detailing bus pads, ADA -compliant wheelchair pads, sidewalk extensions and the location of Our, <br />stops. The work consisted of coordination with various agencies and utility organizations. <br />25E-463 <br />