Laserfiche WebLink
CONTACTINFO <br />KYLE HILTON, EIT <br />kyle:h6v5.00m <br />i 9949.686,04778949.686,0477giileer <br />PmJect En <br />EXPEi2iENGE <br />Mr. Hilton has more than xkt yews of experience In publiaworks improvements, <br />e years <br />including planning and Opsign of.starile, arterial streets, right-of»wtly engineering, and <br />EDUCATION <br />storm drain design. His: professional experianoe also Includes CAD drafting, bridge <br />B.S. Civil.& Environmental <br />rating, Water Nalit , Management Plans (WQMP), Envitohmerttal impact Reports (BIR), <br />Enginebring <br />end Storm Water Pollution Prevention Plans (SWPPP), He site has also served various <br />LICENSES/CERTIFICATES <br />-miss for staff augmentatlonesslgntilents, <br />clalEragtaearinTraining <br />Project Experience <br />.......... ...................................... ,,,,. a». r ........ .F .... M.................... <br />Rancho Palos Verdes Area V Now Striping and Signing- » <br />CITY OF.RANWQ PALOS VERGE$ I RANCHO PALOS VERDEa, CA <br />Design. Engineer. Mt: Hilton was responsible..forstrlping slid signing plans for a large <br />neighborhood community. Theprojeot.Cons sted Of adding hew signs and striping oil. <br />the.streetsofaneighbofi odhbmmgnitl< <br />Bristbi Street Widening from 3rd Street to olvioCenter <br />CO -OF SANTA ANA ( SANT,A ANA, CA <br />Design Engineer: Mr FtiitOri Wzts Cas{ Qnsible forth®:design otthaatreetWdsning <br />pians, 16n0pape plans and Irrigation plans for this project: The Projeatoonsistad <br />:of <br />adding an additional lahe in each direction. Also; a median was.00nstructed with <br />a <br />decomposed granite walkway and a dry Westin ;bed was constructed In place of e <br />gutter. <br />Grand Street Widening from Ist to 4th Street <br />C11 Y'OF SANTA ANA I swrA ANA, CA <br />Design Engineer. Mr. Hilton Was responsible for the design of the street widening <br />Plana, landscape plans, and Irrigation plans,for thls project. The pmjectconsisted of <br />adding an additional lane in each direction, Also, a median was constructed with a dry <br />strearn lied In the middle to allow for runoff to percolate Into the soil. <br />Memorial Park Walkway, Basketball Courts, and Volleyball Courts <br />Renovation <br />CITYOFSANTAANA I5ANTAANA,CA <br />Design Engineer. Mr, Hilton was responsible for the design of the walkway, basketball <br />courts, and volleyball courts reconstruction plans for this project. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Design Engineer. Our team was selected to provide engineering design services and <br />Mr, Hilton is responsible for providing the final design of the bus stops white satisfying <br />the needs of multiple government agencies, Phase II of the. Expo Line is expected to <br />be completed in late 201.5:and will extend the fine to Santa Monica, As a result, Rig <br />Blue Bus Is implementing a comprehensive redesign of its transit system to connect <br />Passengers with the Expo Line stations In attempt to create a more efficient commute <br />for passengers; these initiatives also include the If ioluslon ofalgnage, bus berths <br />and overall pedestrian Improvements. Specifically, our team Is providing preliminary, <br />schematic and final design, to Include construction documents detailing bus pads, <br />NIV15 ADA-oompilant wheelchair pads, sidewalk extensions and the location of bus stop <br />25E-469 <br />