I
<br />I
<br />GONTAOT
<br />STEVE SCHAPEL
<br />R P47Proloot Engineer
<br />... . ........ ............ . v ............ . .......... ......
<br />Pm)ed Upedence,
<br />......... . ...... —.1 ...... . ...... ....._..........................4.,........
<br />aohor$treat Rehabilitation I City of Costs me4o
<br />Mr Soh6pel was responsiblelbr prOPAI`00611 Of Plan% specifications and estimates for
<br />the Baker1treet Rehabilitation from Bados Street to Near StreaL The project consisted
<br />of aPPr0x1MsLOy 1400 LFOf p evoMent rehabilitation, reconstruction of do
<br />Mateo curb
<br />and gutter, sidewalk and oldvOyby, construction of ADA compilonj curti.ta
<br />mps, and a 11
<br />appurtenant work,
<br />Central Avenue street Reoci-ristruetion I City of Chino
<br />Mr.Schepol Wee$ responsible for preparation of pians;, speolficadoits and estimates
<br />for 1806 IF Of pavement reconstruction, improvemsiitsincludedtotall pavement
<br />reconstruction, radestgn. ofedethig ftst sections as needed to Improve drain end
<br />drainage
<br />d6ve4blity, and repair of damaged aeolians, of the asphalt:
<br />Alley Pavement Rehabilitation P
<br />rojects I City of Costs mesa
<br />Mr. $Ohapell was responsible for overseeing the preparation of plans, specifications
<br />and pstfiftates'forthatDtal reconstruction or pavement rathabliltitionof 11sIIey$.Work
<br />Included call 't"UrC, structural secdon, design; field surveying; replacement of alley
<br />entrance, damaged curb and gutters, pross gutters and spandrels, sidewalks, driveway
<br />and approaches, turFefid irrigation; wheel chair ramp (WCR) designs meeting ADA
<br />requirements; planting and trimming trees, determining rightof-Way; and providing
<br />traffic; control and striping plans.
<br />Temescal Canyon Road Rehabilitation I County of Riverside
<br />Mr. Schapal Was responsible for preparation of plans, Specifications and estimates
<br />for 2,000 LP of pavement rehabilitation. Improvements Included grind and asphalt
<br />overlay, redesign Of existing orbss GOollons as needed to Improve drainage and
<br />drivobillt
<br />y. repair of damaged sections of the asphalt, and reconstruoti6n of concrete
<br />Improvements (sidewalk, curb and gutter).
<br />Industrial Way Water Quality and Storm Drain Improvements I City of
<br />costa Mesa
<br />Mr. Schapel was responsible for the preparation of 014nej specifications, and estimates
<br />forthe design of the Industrial Way Water Quality and Storm Drain Improvements with
<br />the objective to eliminate the flooding and current water quollty problems caused
<br />by the deficiencies within the existing stone drain system, The projoot.conslats of
<br />Installing an underground detentlon/Inflitratlon facility within an open grass field
<br />located south of the Anaheim Avenue and 19th Street Intersection. The project
<br />NIV15 Included a hydraulic analysis of the entire storm drain system,
<br />25E-468
<br />Mr.Schapothas more than 25 yqw"f civil "llinewingexporlanas In Southern
<br />122 y0911
<br />California, He Is On exPerlanoOd Manager who has been responsible for the successful
<br />completion of environmardally and politically sensitive design improvement projects. Ris
<br />tnginebringaoursas
<br />experience Includessonting as the project manager and project entinear responsible for
<br />PrePefing.lotolact studies and recommendations, plans andspeciffoations, and support
<br />during construction,
<br />Pm)ed Upedence,
<br />......... . ...... —.1 ...... . ...... ....._..........................4.,........
<br />aohor$treat Rehabilitation I City of Costs me4o
<br />Mr Soh6pel was responsiblelbr prOPAI`00611 Of Plan% specifications and estimates for
<br />the Baker1treet Rehabilitation from Bados Street to Near StreaL The project consisted
<br />of aPPr0x1MsLOy 1400 LFOf p evoMent rehabilitation, reconstruction of do
<br />Mateo curb
<br />and gutter, sidewalk and oldvOyby, construction of ADA compilonj curti.ta
<br />mps, and a 11
<br />appurtenant work,
<br />Central Avenue street Reoci-ristruetion I City of Chino
<br />Mr.Schepol Wee$ responsible for preparation of pians;, speolficadoits and estimates
<br />for 1806 IF Of pavement reconstruction, improvemsiitsincludedtotall pavement
<br />reconstruction, radestgn. ofedethig ftst sections as needed to Improve drain end
<br />drainage
<br />d6ve4blity, and repair of damaged aeolians, of the asphalt:
<br />Alley Pavement Rehabilitation P
<br />rojects I City of Costs mesa
<br />Mr. $Ohapell was responsible for overseeing the preparation of plans, specifications
<br />and pstfiftates'forthatDtal reconstruction or pavement rathabliltitionof 11sIIey$.Work
<br />Included call 't"UrC, structural secdon, design; field surveying; replacement of alley
<br />entrance, damaged curb and gutters, pross gutters and spandrels, sidewalks, driveway
<br />and approaches, turFefid irrigation; wheel chair ramp (WCR) designs meeting ADA
<br />requirements; planting and trimming trees, determining rightof-Way; and providing
<br />traffic; control and striping plans.
<br />Temescal Canyon Road Rehabilitation I County of Riverside
<br />Mr. Schapal Was responsible for preparation of plans, Specifications and estimates
<br />for 2,000 LP of pavement rehabilitation. Improvements Included grind and asphalt
<br />overlay, redesign Of existing orbss GOollons as needed to Improve drainage and
<br />drivobillt
<br />y. repair of damaged sections of the asphalt, and reconstruoti6n of concrete
<br />Improvements (sidewalk, curb and gutter).
<br />Industrial Way Water Quality and Storm Drain Improvements I City of
<br />costa Mesa
<br />Mr. Schapel was responsible for the preparation of 014nej specifications, and estimates
<br />forthe design of the Industrial Way Water Quality and Storm Drain Improvements with
<br />the objective to eliminate the flooding and current water quollty problems caused
<br />by the deficiencies within the existing stone drain system, The projoot.conslats of
<br />Installing an underground detentlon/Inflitratlon facility within an open grass field
<br />located south of the Anaheim Avenue and 19th Street Intersection. The project
<br />NIV15 Included a hydraulic analysis of the entire storm drain system,
<br />25E-468
<br />
|