Laserfiche WebLink
I <br />I <br />GONTAOT <br />STEVE SCHAPEL <br />R P47Proloot Engineer <br />... . ........ ............ . v ............ . .......... ...... <br />Pm)ed Upedence, <br />......... . ...... —.1 ...... . ...... ....._..........................4.,........ <br />aohor$treat Rehabilitation I City of Costs me4o <br />Mr Soh6pel was responsiblelbr prOPAI`00611 Of Plan% specifications and estimates for <br />the Baker1treet Rehabilitation from Bados Street to Near StreaL The project consisted <br />of aPPr0x1MsLOy 1400 LFOf p evoMent rehabilitation, reconstruction of do <br />Mateo curb <br />and gutter, sidewalk and oldvOyby, construction of ADA compilonj curti.ta <br />mps, and a 11 <br />appurtenant work, <br />Central Avenue street Reoci-ristruetion I City of Chino <br />Mr.Schepol Wee$ responsible for preparation of pians;, speolficadoits and estimates <br />for 1806 IF Of pavement reconstruction, improvemsiitsincludedtotall pavement <br />reconstruction, radestgn. ofedethig ftst sections as needed to Improve drain end <br />drainage <br />d6ve4blity, and repair of damaged aeolians, of the asphalt: <br />Alley Pavement Rehabilitation P <br />rojects I City of Costs mesa <br />Mr. $Ohapell was responsible for overseeing the preparation of plans, specifications <br />and pstfiftates'forthatDtal reconstruction or pavement rathabliltitionof 11sIIey$.Work <br />Included call 't"UrC, structural secdon, design; field surveying; replacement of alley <br />entrance, damaged curb and gutters, pross gutters and spandrels, sidewalks, driveway <br />and approaches, turFefid irrigation; wheel chair ramp (WCR) designs meeting ADA <br />requirements; planting and trimming trees, determining rightof-Way; and providing <br />traffic; control and striping plans. <br />Temescal Canyon Road Rehabilitation I County of Riverside <br />Mr. Schapal Was responsible for preparation of plans, Specifications and estimates <br />for 2,000 LP of pavement rehabilitation. Improvements Included grind and asphalt <br />overlay, redesign Of existing orbss GOollons as needed to Improve drainage and <br />drivobillt <br />y. repair of damaged sections of the asphalt, and reconstruoti6n of concrete <br />Improvements (sidewalk, curb and gutter). <br />Industrial Way Water Quality and Storm Drain Improvements I City of <br />costa Mesa <br />Mr. Schapel was responsible for the preparation of 014nej specifications, and estimates <br />forthe design of the Industrial Way Water Quality and Storm Drain Improvements with <br />the objective to eliminate the flooding and current water quollty problems caused <br />by the deficiencies within the existing stone drain system, The projoot.conslats of <br />Installing an underground detentlon/Inflitratlon facility within an open grass field <br />located south of the Anaheim Avenue and 19th Street Intersection. The project <br />NIV15 Included a hydraulic analysis of the entire storm drain system, <br />25E-468 <br />Mr.Schapothas more than 25 yqw"f civil "llinewingexporlanas In Southern <br />122 y0911 <br />California, He Is On exPerlanoOd Manager who has been responsible for the successful <br />completion of environmardally and politically sensitive design improvement projects. Ris <br />tnginebringaoursas <br />experience Includessonting as the project manager and project entinear responsible for <br />PrePefing.lotolact studies and recommendations, plans andspeciffoations, and support <br />during construction, <br />Pm)ed Upedence, <br />......... . ...... —.1 ...... . ...... ....._..........................4.,........ <br />aohor$treat Rehabilitation I City of Costs me4o <br />Mr Soh6pel was responsiblelbr prOPAI`00611 Of Plan% specifications and estimates for <br />the Baker1treet Rehabilitation from Bados Street to Near StreaL The project consisted <br />of aPPr0x1MsLOy 1400 LFOf p evoMent rehabilitation, reconstruction of do <br />Mateo curb <br />and gutter, sidewalk and oldvOyby, construction of ADA compilonj curti.ta <br />mps, and a 11 <br />appurtenant work, <br />Central Avenue street Reoci-ristruetion I City of Chino <br />Mr.Schepol Wee$ responsible for preparation of pians;, speolficadoits and estimates <br />for 1806 IF Of pavement reconstruction, improvemsiitsincludedtotall pavement <br />reconstruction, radestgn. ofedethig ftst sections as needed to Improve drain end <br />drainage <br />d6ve4blity, and repair of damaged aeolians, of the asphalt: <br />Alley Pavement Rehabilitation P <br />rojects I City of Costs mesa <br />Mr. $Ohapell was responsible for overseeing the preparation of plans, specifications <br />and pstfiftates'forthatDtal reconstruction or pavement rathabliltitionof 11sIIey$.Work <br />Included call 't"UrC, structural secdon, design; field surveying; replacement of alley <br />entrance, damaged curb and gutters, pross gutters and spandrels, sidewalks, driveway <br />and approaches, turFefid irrigation; wheel chair ramp (WCR) designs meeting ADA <br />requirements; planting and trimming trees, determining rightof-Way; and providing <br />traffic; control and striping plans. <br />Temescal Canyon Road Rehabilitation I County of Riverside <br />Mr. Schapal Was responsible for preparation of plans, Specifications and estimates <br />for 2,000 LP of pavement rehabilitation. Improvements Included grind and asphalt <br />overlay, redesign Of existing orbss GOollons as needed to Improve drainage and <br />drivobillt <br />y. repair of damaged sections of the asphalt, and reconstruoti6n of concrete <br />Improvements (sidewalk, curb and gutter). <br />Industrial Way Water Quality and Storm Drain Improvements I City of <br />costa Mesa <br />Mr. Schapel was responsible for the preparation of 014nej specifications, and estimates <br />forthe design of the Industrial Way Water Quality and Storm Drain Improvements with <br />the objective to eliminate the flooding and current water quollty problems caused <br />by the deficiencies within the existing stone drain system, The projoot.conslats of <br />Installing an underground detentlon/Inflitratlon facility within an open grass field <br />located south of the Anaheim Avenue and 19th Street Intersection. The project <br />NIV15 Included a hydraulic analysis of the entire storm drain system, <br />25E-468 <br />