Laserfiche WebLink
CONTACT INFO <br />KIKOANTUNOViCH, PE <br />kiko.antunovIoh0nvSxom <br />949;698.0477 <br />Protect Erq;ljteer <br />EXPERiEN69 <br />».. ,., ...,.... ... _................ .... ........ <br />Mr. Antunovidi.has more than three years ofexpprienoe:as It civil engineer. His <br />8years <br />professional experience inoludH,g projectenginepr, design engineer and CAD designer. <br />EDUCATION <br />He Is adept at. matrcging.muttiplo.jmunicipal and agencyprojects. His quellftcaUons <br />B.S. Civil. Engineering <br />Ind ude the a bility to design and draft. complex water and wastswoto. r pMeots Including <br />LICENSES <br />rpseryolra, Pump stations, water mains and SewerplpaUijas, <br />Civil EhNneer{OA) <br />Project Experjence. <br />N0.87804 <br />..........................a:.,. .._.,........... „.... ....... ,.................,..a....._......»».»......,.....» »................. <br />,........... <br />Paseo De Valencia 41ft stotlen Rehobilltotjon <br />MOULTON NIGUEL WATER piSfRICT l LAGUNA,HILLS,-CA <br />Prejeot tngirtaer,• Mr. Antuhovich is providing. prolectenglnperipg to develop Pians <br />to replac"91% pumps and motors to increase systam r6liablity.update and replace <br />aged eloctdcai'equipment, retrofit piping, yshbbilltata faoilityfor betterventifation, and <br />legal descriptions and plats.. <br />Corryne and 5lauson Area Main ReMaeamente, a'nd Abandonment <br />GOLDEN STATE WATER COMPANY I CULVER CITY, CA <br />Projoot Engj"Oor. Mr. Antunovich' Is eating as pFc ad engineertadevelop plena and <br />speolfloatlona foe tlia.design of a potable water pfpallna replacement prtilact located <br />Ifts Culver Cfty WaterSpsfam. This project indudas repladggsnd a9landalhin 1,600 <br />LF of undersized and 0 d 4•inch;. s lncta, and 10 inch cast Troia water retains with$-1ncfi <br />and d 2 (nch PVC fn the public right of way (ROWj, The purpose of this project is to <br />improve water quality, Incraase fire flows, reduce rn&Irtananoecosis, and Improve <br />systom reliab)lity within the GSWG service area. This project Is set to be construdted ih <br />6 Sequenoes, <br />Azusa Sewer Lift Station <br />CrrY OF WEST COVINA I WEST COVINA, CA <br />Project Engineer, Mr. Antunovich is acting as project engineer to develop plans to <br />upgrade the exiting sewer pumps and controls to dompiy with the Statewide General <br />Waste Discharge Requfrements for SanitorySewer Systems; provide sufficientstorage <br />capacity during emorgency/power outages; provide backup power systems; and SCADA <br />monitoring system to pump.date and status. <br />Alley Water Main Conversion, Liberty Court <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />Lead Designer, Mr. Antunovich designed and drafted the pians for the project. This <br />project included the relocation of two waterlines and approximately 26 services within <br />two allays to the. adjacent Streets, The project consisted of the design of approximately <br />8780 LF of 6 Inch Di pipe and BOD' LF of 4 -Inch DI pipe, The project required extensive <br />field invastigaUOn and coordination between the Long Reach.Water Department <br />and property owners. The project construction was also split between the Water <br />Department constructing the pipe in the side streets and the contractor constructing <br />the main within Atlantic Ave and reconnecting the service laterals. <br />25E-471 <br />