Laserfiche WebLink
PAUL M. FRiSLIE, PE, IMSA <br />Senior Engineer <br />EDUCATION <br />• MBA; University of Phoenix, 2011 <br />. as, CNB fnghmering, University of <br />Callmmia, Irvine, 2008 <br />REGiS1RNUIONS <br />a Civil Engineer (PE); <br />.. CA472992,2008 <br />• International Munielpal Signni <br />Association (IMSA): <br />Traffic Signal Level d, 48097188, <br />2012 <br />TmfflcSignal level 1, 0AA97189, <br />2012 <br />Signal mspactor Level[, <br />4S197189,2014 <br />- Work Tone Safety, 42297189. <br />2010 <br />TEARS OF EXPERIENCE 17 <br />CORE COMPETENCIES <br />• Traffic Bngineedng&Operations <br />• .ITS Planning, Design & Intelpation <br />• Traffic Signal Design <br />» Constn[ctlon Assistance <br />Transit <br />AFFILIATIONS <br />• Omoge County Traffic Engmeming <br />Council(OCTEC) <br />i terist <br />Mr. Fide serves as a Senior ErL4ne6rof Iteris'Transportatfau Systems die5lon and <br />leas been with 8rmshn a lanuary 2001,Forover 17 years, Mr, rrtslle has been <br />involvedin several transportation and traffic engineering projects that include both <br />plann[ngas well as design and deployment or ITS, systems mogratbn, and traffic <br />signal design. Recently, he has servedasthe Project Managerfor the Immorans <br />AvenueMerlal Improvement Project, Cypress Phase Ithrough 31TS Projects, the <br />Newport Beach ITS phase 5 through 8 Prolects, the Santa Monies ATMS Phage ar <br />I'miKI. Newport Beach ITS Phase L 2, 3, 0 and 7 Projects and the Fountain Valli <br />Phase N project, as well as the Signal Construction Inspector for completion oft <br />Oxnard ITS Master Plan and the Rosecrans and Vermont Arterial improvements. <br />Project Experience <br />Harbor Boulevard Traffic Signal Synchronization (rSS) Project - Orange <br />County Transportation Authority (OCTA) and City of Santa Ana, CA <br />Mr. Fristie served as QA/QC lead and Construction Manager to provide <br />construction support and perform all necessary Integration, <br />implementatlen, and fine-tuning tasks for the Harbor Blvd TSS project. <br />This project involved signal synchronization and equipment upgrade along <br />Harbor Blvd from Chapman Ave to Newport Blvd, spanning across the <br />Cities of Garden Grove, Santa Ana, Fountain Valley and Costa Mesa, as <br />well as freeway on/off ramps at SR -22 and h465 within Caltrans <br />jurisdiction. In addition to generating PS&E packages for equipment <br />upgrades, the project also included the development, implementation <br />and fine-tuning of the AM, PM, midday, off-peak and weekend traffic <br />signal coordination timing plans for all lg Intersections along the corridor. <br />Iteris will also provide Traffic Management Center (TMC) upgrades to the <br />cities of Costa Mesa and Santa Ana, which spans from Closed -Circuit <br />Television (CCTV) IICerlse5 and workstations to designing and replacing the <br />City's existing video wall system with newerand more advanced <br />capale hies. <br />Bmranca Pkwy/Muiriands Blvd Regional Traffic Signal Synchronization <br />Project - Cities of Irvine, Lake Forest &A'tission Viej), CA <br />Mr. FrHlie is tite QA/QC Leader to provide traffic/ITS design Improvements <br />and traffic signal synchronization for Ort intersections along a 13, mile <br />segment of Barranca Parkway/Mufrlands Blvd. The project Involves design <br />of new fiber optic cables (atohl and single made), conduits, putt boxes, <br />cabinets and controller upgrade in City of Irvine;. New conduits, pull Boxes, <br />twisted pair Interconnect, and wireless radio in City of lake Forest; New <br />cabinets, pedestrian signals and loop detection In City of Mission Viejo. in <br />Addition to the traffic. signal Infrastructure Improvements, liens also <br />develops signal coordination. plans for AM, noon, off-peak, PM, "after- <br />hours" and weekend for all project traffic signals along the corridor. <br />Newport/Baitiraa Boulevard Regional Traffic Signal Synchronization <br />Project - Cities of Costa. Mesa and Newport Beach, CA <br />Mr. frisiie serves as the QA/QC leader and Engineer of Record to OCTA to <br />provide turn -key traffic/ITS Improvements and traffic signal synchronization <br />for 33 intersections along Newport/Balboa Boulevard corridor from Bristol <br />Street in Costa Mesa. to Main Street in Newport Reach,. <br />Innovating Through Informatics'm <br />25E-472 <br />