My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
coNTacrirlPfr PETER SA LGADO, PE <br />peteCottstrttction Man4ge <br />i ; ; 94l3.S;35.C47.7 <br />. "th more then 20 years of experience, Mr Satgado has managed and.deliverad a <br />EXPERIENCE variety ofpubile works prejam inciudfng street improvements; vertical construction <br />20.years and tenant improvements; parks. and landsoapin$ improvements; and water newer, <br />and storm drain -improvements. Working with a varfety of Agancies, he' is thoroughly <br />EDUCATION fAM1114r with focal, state, -and federal procedures. <br />13.5. Civil Eroneeririg <br />I.iCEWS Project EXperlence <br />CivilEngineer (CA) .............................•..,....,. ,., .....,„-.-.............. ........ ...... <br />.._........ <br />No. 63159 STREET IMPROVEMENTS <br />NNIS <br />Bellfiewer Boulevard Pedestrian €rihanoomerits <br />0FWbFSELCFLOWER I BELVLOWER, CA <br />CsndmOtIOU Mnnager, Mr. Salgado managed this $1:21iii street traffic signal and <br />psrkweys Irnprevvsmenfs project. Tho scope ct, work inducted roo.dWay reccnatlVctiQn, <br />and resurfaeing; fWhstruation of sidewalks (Inoludingdeoorat.10 pav160;drivemp, <br />curds gutters;'cross_gutters, and ADA curb ramps; Installation oftraf id signals, <br />ooritroller cabinats, and ffashfng beacon; Iawdscaping and irrigation; and traffic sh ipi.ng <br />and signage (Inefuding dacorativs.cro&sVgAik'sat the Intersections(, <br />FY20i3-2014, and FY 2015.201.6 Annual Pavement Rehabilitation <br />OITY OFVOR6A LINDA I YORBA t,INbA, CA <br />Censtruotioa'Maaager. Mr. Salgado managed this $2.5M citywide street improvement <br />Wgram. Spectfitaily, the scope of work included reconstruction of'e[dawalke, <br />driveways, ourbr gutter, and ADA curb ramps; roadway section repairs and resurfacing; <br />track seal and slurry seal; and, traf llo striping and signage, <br />Corporate Center Drive. Street Lights project <br />CITY Or POMONA I POMONA, CA <br />Construction Manager. Me, Salgado managed this $250,000 street lights project <br />that included the removal and installation of approximately 60 streetlights in several <br />residential area's, <br />FY 2008 through 2016 Annual Cltywido & Street improvement Projects <br />CITY Of SANTA MONICA f SANTA MONICA, CA <br />Construction Manager. Mr. Salgado provided construction management, <br />Inspection, and public outreach for this annual citywide project. Work consisted of <br />pavement resurfacing of strests Arid parking tots (including slurry seat and crack <br />seal treatments); full pavement reconstruction; traffic signal modifications; and <br />construction of now sidewalks, driveways and ADA ramps, Key services Included all <br />facets of construction managementand inspection including: utility and multiple <br />agency coordination; project budget and accounts tracking; engineering plan and <br />specification review; traffic management and control; submittal, schedule, request <br />for information (RFC), progress payment review and processing; field observation; <br />negotiating and processing change orders; document control; and project closeout, <br />which consisted of warranties, guarantees, recommending notices of completion slid <br />thta release of retention,'fotal constnlotlon cost varied between $1M and $3M. <br />25E-478 <br />
The URL can be used to link to this page
Your browser does not support the video tag.