Laserfiche WebLink
coNTacrirlPfr PETER SA LGADO, PE <br />peteCottstrttction Man4ge <br />i ; ; 94l3.S;35.C47.7 <br />. "th more then 20 years of experience, Mr Satgado has managed and.deliverad a <br />EXPERIENCE variety ofpubile works prejam inciudfng street improvements; vertical construction <br />20.years and tenant improvements; parks. and landsoapin$ improvements; and water newer, <br />and storm drain -improvements. Working with a varfety of Agancies, he' is thoroughly <br />EDUCATION fAM1114r with focal, state, -and federal procedures. <br />13.5. Civil Eroneeririg <br />I.iCEWS Project EXperlence <br />CivilEngineer (CA) .............................•..,....,. ,., .....,„-.-.............. ........ ...... <br />.._........ <br />No. 63159 STREET IMPROVEMENTS <br />NNIS <br />Bellfiewer Boulevard Pedestrian €rihanoomerits <br />0FWbFSELCFLOWER I BELVLOWER, CA <br />CsndmOtIOU Mnnager, Mr. Salgado managed this $1:21iii street traffic signal and <br />psrkweys Irnprevvsmenfs project. Tho scope ct, work inducted roo.dWay reccnatlVctiQn, <br />and resurfaeing; fWhstruation of sidewalks (Inoludingdeoorat.10 pav160;drivemp, <br />curds gutters;'cross_gutters, and ADA curb ramps; Installation oftraf id signals, <br />ooritroller cabinats, and ffashfng beacon; Iawdscaping and irrigation; and traffic sh ipi.ng <br />and signage (Inefuding dacorativs.cro&sVgAik'sat the Intersections(, <br />FY20i3-2014, and FY 2015.201.6 Annual Pavement Rehabilitation <br />OITY OFVOR6A LINDA I YORBA t,INbA, CA <br />Censtruotioa'Maaager. Mr. Salgado managed this $2.5M citywide street improvement <br />Wgram. Spectfitaily, the scope of work included reconstruction of'e[dawalke, <br />driveways, ourbr gutter, and ADA curb ramps; roadway section repairs and resurfacing; <br />track seal and slurry seal; and, traf llo striping and signage, <br />Corporate Center Drive. Street Lights project <br />CITY Or POMONA I POMONA, CA <br />Construction Manager. Me, Salgado managed this $250,000 street lights project <br />that included the removal and installation of approximately 60 streetlights in several <br />residential area's, <br />FY 2008 through 2016 Annual Cltywido & Street improvement Projects <br />CITY Of SANTA MONICA f SANTA MONICA, CA <br />Construction Manager. Mr. Salgado provided construction management, <br />Inspection, and public outreach for this annual citywide project. Work consisted of <br />pavement resurfacing of strests Arid parking tots (including slurry seat and crack <br />seal treatments); full pavement reconstruction; traffic signal modifications; and <br />construction of now sidewalks, driveways and ADA ramps, Key services Included all <br />facets of construction managementand inspection including: utility and multiple <br />agency coordination; project budget and accounts tracking; engineering plan and <br />specification review; traffic management and control; submittal, schedule, request <br />for information (RFC), progress payment review and processing; field observation; <br />negotiating and processing change orders; document control; and project closeout, <br />which consisted of warranties, guarantees, recommending notices of completion slid <br />thta release of retention,'fotal constnlotlon cost varied between $1M and $3M. <br />25E-478 <br />