Laserfiche WebLink
CONTACTINF6 <br />LUANIVE B�>�r I� <br />luenno.bean@nv5.cwn <br />940.585.'0477Construction. <br />Manager <br />nnrrnnnt..nxrx. r. n.wx.xn...........rn...r...... wx.nn..nwunn¢r <br />1 <br />EXPERIENCE <br />W.n.uniinw.ri ..x..n.r..... <br />., awrxx........yin............r .. fxn.xn. u..xrv.xn.... <br />Me. Bean has more than Soyeare otoxperiance inthwdesigh and Management of <br />Spm <br />waterand wastewater projects, Hertochhicafskills inoludestructuralanalysis and <br />EDUCATION <br />design, mechanical analysis, InatrUmehtation and Control, the preparation of pians, <br />MS. Civil Engineadng <br />spWilloatio% and cost estimates as well as construction mapagemont, She has <br />field various. positions with many -public agencies Including the tong Beach Water <br />tt;S;:Gv1l Fngtneann _. <br />Department, Victor Valley Wastewater Reciainaticiir k thddty,,.Indic Water Authority, <br />LICENSES <br />Metropolitan Water f ilstrict, and FEMA, Ms. Desn's techisical experience inoludes large <br />CIA1 tngfnaer (GA) <br />scale publio works prdlom The Capital Improvement programs including construction <br />"a.S0129 <br />-oar g4t,cdntrac administrationrdocumentcontral costartd:sehedulecentrkd, <br />REQISTItAYIw�N3 <br />puelityppritMI, Structural analysis, and design, <br />. <br />FEMA.f)PS <br />PrGJQGt EXperlenCe <br />WAZMAYlistRospohderj <br />pperaticna i eyffl <br />n......,„r................n,......,_t....._....„...... x..,...,,x....: <br />Alley Water Main Converslon, Phose lipl,ewis & [aBmort <br />i DOT Offars.of Bulk <br />LONG BEACH WATER DEPARTMENT I LONC'6EACH, CA <br />end:Ncn Bulk tfAZMAT: <br />Oanstruction Mifnager%Inspeatpr, Ms. Balla completed full service Construction <br />paiikages <br />Managpinerit snd Inspection Sd'rvieas.for the Phase If AlleytHeteT Main Conversion <br />project. The services Included full time construction observatjon, materials testing, <br />Nuclear Waam Safety <br />h#vIO* of CoAtractorrs progreas poymants, resciudon of dealgn Issues, shop drawing <br />for Workers. <br />review, RFI resolution, change ordermanageprehtand resolution, meefing% public <br />notifications and LBWD coordination forshutdcwns fryy this project. Our Cons#ruction <br />Management team resolved public counplafnts and problems from the local businesses <br />and residence before they become problems for City Hali and LOWD. Ms: Bean <br />.also <br />Checked NPDES and BMP measures, traffic control, and safety measured during <br />consixaction. <br />J. K Johnson Reservoir Facility Valve Replacements and Site <br />improvements Project <br />LONG BEACH WATER DEPARTMENT I COMPTON, CA <br />Resident EnglnearJConstfuotton Manager. Ms. Bean was responsible for cvarseeing <br />this prolect, which Involved repiacamont of four underground water main valves, <br />Installation of five storm drain Inlets, Construction of a containment cell for an indoor <br />abovp•ground chlorine tank, construction of a large concrete rei'nforoed storage pad, <br />trenching for the Installation of electrical conduit, and te-pavingof surface areas to <br />allow for proper drainage. <br />Group 12 CIPP Sewer Reilning Program <br />LONG BEACH wACER DEPARTMENT I LONG BEACH, CA <br />Oonstruction Manager. Ms. Bean was the Construction Manager for the Long Beach <br />Water Department's Group 12 CIPP sewer relining program. This involved providing <br />construction oversight and observation of'LBWD`s contractor to install almost 16,000 <br />of ,94nch, 10 -inch, and 12 -Inch curod-in—place sewer cleaning, pre -lining video, lining, <br />NIV15and post -lining video, Point repairs and manhole rehabilitations were also undertaken. <br />Once the installation of the CIPP began, Ms. Bean coordinated with the LBWD for <br />shutting off Water services for the various residents and businesses along the sewer <br />line routes. Once curing was completed, a post lining video was run, followed by ra- <br />Installation of the laterals and top hat Installation on select laterals: <br />25E-479 <br />