<br />Me. Bean has more than Soyeare otoxperiance inthwdesigh and Management of
<br />Spm
<br />waterand wastewater projects, Hertochhicafskills inoludestructuralanalysis and
<br />EDUCATION
<br />design, mechanical analysis, InatrUmehtation and Control, the preparation of pians,
<br />MS. Civil Engineadng
<br />spWilloatio% and cost estimates as well as construction mapagemont, She has
<br />field various. positions with many -public agencies Including the tong Beach Water
<br />tt;S;:Gv1l Fngtneann _.
<br />Department, Victor Valley Wastewater Reciainaticiir k thddty,,.Indic Water Authority,
<br />LICENSES
<br />Metropolitan Water f ilstrict, and FEMA, Ms. Desn's techisical experience inoludes large
<br />CIA1 tngfnaer (GA)
<br />scale publio works prdlom The Capital Improvement programs including construction
<br />"a.S0129
<br />-oar g4t,cdntrac administrationrdocumentcontral costartd:sehedulecentrkd,
<br />REQISTItAYIw�N3
<br />puelityppritMI, Structural analysis, and design,
<br />.
<br />FEMA.f)PS
<br />PrGJQGt EXperlenCe
<br />WAZMAYlistRospohderj
<br />pperaticna i eyffl
<br />n......,„r................n,......,_t....._....„...... x..,...,,x....:
<br />Alley Water Main Converslon, Phose lipl,ewis & [aBmort
<br />i DOT Offars.of Bulk
<br />LONG BEACH WATER DEPARTMENT I LONC'6EACH, CA
<br />end:Ncn Bulk tfAZMAT:
<br />Oanstruction Mifnager%Inspeatpr, Ms. Balla completed full service Construction
<br />paiikages
<br />Managpinerit snd Inspection Sd'rvieas.for the Phase If AlleytHeteT Main Conversion
<br />project. The services Included full time construction observatjon, materials testing,
<br />Nuclear Waam Safety
<br />h#vIO* of CoAtractorrs progreas poymants, resciudon of dealgn Issues, shop drawing
<br />for Workers.
<br />review, RFI resolution, change ordermanageprehtand resolution, meefing% public
<br />notifications and LBWD coordination forshutdcwns fryy this project. Our Cons#ruction
<br />Management team resolved public counplafnts and problems from the local businesses
<br />and residence before they become problems for City Hali and LOWD. Ms: Bean
<br />.also
<br />Checked NPDES and BMP measures, traffic control, and safety measured during
<br />consixaction.
<br />J. K Johnson Reservoir Facility Valve Replacements and Site
<br />improvements Project
<br />LONG BEACH WATER DEPARTMENT I COMPTON, CA
<br />Resident EnglnearJConstfuotton Manager. Ms. Bean was responsible for cvarseeing
<br />this prolect, which Involved repiacamont of four underground water main valves,
<br />Installation of five storm drain Inlets, Construction of a containment cell for an indoor
<br />abovp•ground chlorine tank, construction of a large concrete rei'nforoed storage pad,
<br />trenching for the Installation of electrical conduit, and te-pavingof surface areas to
<br />allow for proper drainage.
<br />Group 12 CIPP Sewer Reilning Program
<br />LONG BEACH wACER DEPARTMENT I LONG BEACH, CA
<br />Oonstruction Manager. Ms. Bean was the Construction Manager for the Long Beach
<br />Water Department's Group 12 CIPP sewer relining program. This involved providing
<br />construction oversight and observation of'LBWD`s contractor to install almost 16,000
<br />of ,94nch, 10 -inch, and 12 -Inch curod-in—place sewer cleaning, pre -lining video, lining,
<br />NIV15and post -lining video, Point repairs and manhole rehabilitations were also undertaken.
<br />Once the installation of the CIPP began, Ms. Bean coordinated with the LBWD for
<br />shutting off Water services for the various residents and businesses along the sewer
<br />line routes. Once curing was completed, a post lining video was run, followed by ra-
<br />Installation of the laterals and top hat Installation on select laterals:
<br />25E-479
<br />
|