My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3, Estimated bidding/constructionschedule. <br />TASK 5 - BIDDING SERVICES <br />A) Bidding Phase Support - Assist the City in providing <br />clarification and prepare information to be used in <br />addenda as needed for ten (JO) questions that. may arise <br />during the bidding process, City will prepare and make <br />available to plan holders any required addenda, Attend the <br />pro•bld meeting, and assist the City with bid evaluations <br />and recommendation of bid award. <br />B) Conformed Plans - Prepare conformed plans for use In <br />constructing the pmjeot. The conformed plans will reflect <br />changes made during bidding, and will be rioted as a <br />revision to the final design plans. <br />TASK 6 - ENGINEERING CONSTRUCTION SERVICES <br />h1U.R will aaslet the City during the construction of the <br />project by performing the items below: <br />A) Engineering Support - Assist the Citywith the following: <br />1. Provide professional erigineeringservices to address <br />and respond to up to fifteen 46) Requests for <br />Information (RFM) from the contractor, <br />2. Review up to twenty-five (25) shop drawing and <br />materials submittals, <br />3 Prepare supplementary sketches and details as <br />required to resolve field construction problems that <br />may he encountered, <br />4, Review and provide recommendations regarding <br />proposed change orders, as needed, and <br />S. AMnd pro-constmoten.meetingand up to:ona (1) <br />additioncil office or construction alto meetings during <br />construction. <br />8) INlnor plan Revisions - Required minor plan revisions <br />Will be completed. <br />C) preparation o`4 Record D.acumorris (AwAolifs) - The <br />eonstruetIdn contract will require the contractor to provide <br />to the City for review and approval one set of as -built pians <br />showing the design changes madeduringthe course <br />of construction. NYS will prepare record drawings from <br />contractor and orinstruotipn Inspoolpras^builtdrawing, <br />markups, and field notes. Submit the following: <br />1. Una (1) set of 24-Ineh x 30 -Inch rnylar "Ratxard <br />Drawings' <br />2.One MOD (orDVD) with the record drawingffles <br />saved in Micrestation vSi and PDF formats. <br />TASK 7 - OPTIONAL SERVICES <br />NV5 will provide separate line items in the cost proposal <br />for the "optional Services". City may exclude or Include <br />the optional services as part of the awarded contract at <br />City's discretion. The OOptional Services" will include the <br />following activities: <br />• if required, Traffic Control Pians will be prepared by a <br />Caifforrnia Registered Traffic Engineer. <br />s <br />25E-514 <br />
The URL can be used to link to this page
Your browser does not support the video tag.