Laserfiche WebLink
CONTACT INFO DAVID NIKNAFSr PE <br />davld.niknsfs*nvS.com Project 949.68MD477 Pro t Mann er <br />EXPERIENCE <br />80 years <br />EDUCATION <br />MS. Civil Engineering <br />B.CS. Engineering <br />LICENSES <br />Civil Engineer (CA) <br />No. 42697 <br />AFFILIATIONS <br />Amedoan Pubitc'Works <br />Association (APWA) <br />American society of Civil <br />Engineers (ASCE) <br />Transportation & <br />Development Institute <br />Mr. Nlknafs has rnora lhah 30 years of civil engineering a q*rleme in the public <br />and private sectors working on various capital Improvement pttgects and has <br />extensivea%pert eceWorking asaproject manager and senior anginoer.Fiehas <br />managed numerous publ)o works and development projects Including roadways, <br />bridges, drainage, saw% water, underground utilities, building facilities and related <br />Infrastructure imprOveinent.prejects. <br />He is In charge Of providing overall project direction to the Project technical team <br />and providing resource allocation,, preparing and adminlsterinii budgets. preparing <br />end monitoring projeat schedules: managing production Of prelimfnary.deslgn <br />and final deaigrr proparingvadous detailed technical reports, providing oversight <br />and performing quality control, nianaging•and monitoring construction actlyk! , <br />establishing, coordinatUrg and maintaining working relationships with owners, <br />developers, andotheragencies. <br />Project Experience <br />..... w.._ ... ......... ........... ..._........ ................... .«.._.._.......... M. ..... -w— ......... <br />"H".%reet Widening Project <br />CITY OF SAN 13ERNARDINO i SAN BERNARDINO, CA <br />Project Manager. Me Nlknafs is responsible for providing professional deal&, <br />engineering services including plane, specifications, cost estimates and related bid <br />documents for the Widening of OW ;street from Kendall iirive to 40th.5treet; The <br />project will Increase H Street from two lanes to four lanes and upgrade the existing <br />traffic signals at 40th Street and Kendall Drive. The plans will )roluda roadway, <br />drainage, sewer, signing and striping, street lighting, modification W traffic signals, and <br />demoBtlon plans. We are coordinating with utility companies, Identifying existing right- <br />pf way, conducting pavement investigation and preparing a report, and preparing all <br />required environmental studies and documents for clearance under CEQA. The street <br />Improvements will Include ADA�oompllant curb ramps. <br />Pacific Coast Highway Arterial improvements <br />CITY OF REDONDO BEACH i REDONDO BEACH, CA <br />Project Manager. Mr. Nlknafs is managing a comprehensive traffic analysis and <br />the preparation of preliminary design recommendations to reduce congestion <br />and Increase safety on Pacific Coast Highway. Our team is preparing final plans, <br />specifications and cost estimates for the Intersection wideningfar a right-tuinroniy lane <br />on southbound Pacific Coast Highway and Torrance Boulevard. We will also provide <br />design and support services during bidding and construction phases. <br />Jamboree Road and Intersection Widening <br />CITY OF IRVINE I IRVINE, CA <br />N I V Project Manager/Contract Manager, Mr. Niknafe is responsible for providing program <br />and contract management services for the widening of Jamboree Road from Main <br />Street to Sarrancs Parkway, The project will widen Jamboree Road from four tofive <br />through lanes in each direction. intersection improvements at Jamboree/Main and <br />Jamtwree/Sarranca are currently in the design and right of way phases and will be <br />constructed along with the widening. Mr. Niknafa is also responsible for coordination and <br />15 monitoring required for all phases of work, <br />25E-524 <br />