Laserfiche WebLink
Harbor Boulevard Street, Median and Landscape Improvements <br />CiTY OF COSTA MESA I COSTA MESA, CA <br />Project ManagerMr. Niknafs managed the preparation of plans, speclfiaaUoitaand cost estimates forthe design of <br />Improvements on Harbor Boulevard, including street and median landscaping Impravaments. Tha City was avrarded Federal <br />Highway Safely IMPromftnt Program funds to install Medians, landscaping, and assodated Improvements to improve <br />Pedestrian and traffic safety. A trafft analysis was conducted to establish median openings and turn pocket lane lengths. <br />Our team Coordinated with stakeholders including the residents and buslnessownem, and public outreach community <br />meetings were scheduled so the conceptual plans could be presented to the community. <br />East 19th Street Design Improvements <br />Oily OF COSTA MESA I COSTA MFA, CA <br />Project Manager. Me Nlkrrefa was responsible for tite design of this roadway, median and parkway landscaping <br />imprwelnents project. Tfi)a projecttncluded the removal of reconstruction of pavement, and'reconstructien of curb, gutter, <br />cross gutter, sidewalk, whoolcho)r ramp and driveway, His responsibilities Included managingthe preparation of the dans, <br />speolficatiOneand coat estimates, and.aselsting the City with the preparation of PES and E-713 certification, as well as with <br />the submittal and processing through Cs bans, <br />Wilmington Avenue Pedestrian and Bicycle Improvements <br />CITY OF COMPTON j COMPTON, CA <br />Prejeot Managen Mr. Miknafs was responsible for providing professional design enginaeringservlces including plat <br />spa0111040006, cost estimates and related bid documents for the Wilmington Avenue Set ,"`,treats Pedestrlan/Sicyc e <br />Improvement Project. The project Included pavement rehablfiiation on Wilmington'Avenue from EI sagutrrio boulevard to <br />RosebransAVenue.,$00pe of work consisted of various pedestrian and bicycle )nerits;tg a b�tallation:of wider and <br />colored crosswalks; countdown pedestrian signals: enhanced pedestrian lighting,, the Installation of Class II bike lanes with <br />wayfindingsignage and Class I bike paths, and the installation of four solar-ppwered speed feedback signs for speed control" <br />and attainment. <br />FY 243.7-18 Annual Street Rehabilitation <br />CITY OF ViLLA PARK VILLA PARK, CA <br />Project Manager. Mr. Niknafs Is responsible for provittingplans, specifications, and estimates la the annual rehabilitation <br />Project The Improvements may Include the removal and replacement of deteriorated sections pf tha streets by repaving <br />or slurryseal the streets, construction of curb and gutter or AC burro' at certain locations of theseetreets; and the <br />replacement of curb and gutters as needed to provide adequate drainage, <br />Colonial Avenue Alley Pavement Project <br />CITY OF CULVER CITY I CULVER CITY, CA <br />Project Manager, Mr. Niknafs Is responsible for providing professional design services for the Colonial Avenue Alleyway. As <br />Part of the Community Development Block Grant (CDBG) program, the Colonial Avenue Alleyway Peving project includes the <br />paving of approximately 800 LF by 20 feet wide of the alleyway. The scope of work stop involves field review, topographic <br />survey, design plans, bid schedule end technical specifications, quantity and cost estlimates. <br />Expo Line Bus Stop Enhancement Project <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Project Manager. Our team was selected to provide engineering design services for the Expo Line Bus Stop Enhancement <br />Project In Banta Monica Phase It of the Expo Line extends the line to Santa Monica. As a result, Big Blue Bus is <br />implementing a comprehensive' redesign of Its transit system to connect passengers with the Expo Line stations In <br />attempt to create a more efficient commute for passengers. These initiatives also Include the inclusion of signage, bus <br />berths and overall. pedestrian Improvements. Our team Is providing preliminary, schematic and final design to include <br />construction documents detailing bus pads, ADA -compliant wheelchair pads, sidewalk extensions and the location of bus <br />stops. The work consisted of coordination with various agencles and utility organizations. <br />25E-525 <br />