Laserfiche WebLink
I <br />PAUL M. FRISLIEr PE, IMSA <br />Senior Engineer <br />EDUCATION <br />+ MBA,UnI0rsny'of Ipnmy2011 <br />-'BS' CNII Engineering, Unwersity of <br />Ca teats, frvino; Jots <br />REGISTRATIONS <br />• cm8engtnearlPEi: <br />- cnp7zsez,2naB <br />. International Municipal signal <br />Asaodapon dMSA): <br />- Traffic5lgnal level ll, 00897189, <br />2.011 <br />- TrafflcSignal level 4gAA9718% <br />2032 <br />SignallospectorLevel 1, <br />VS10.7189, 2014 <br />Work Zona safety, 07]07169, <br />Zola <br />YEARS OF EXPERIENCE.L7 <br />CORE COMPETENCIES <br />• TrafiicFnglneeringgoperations <br />• ITSPhoning,besignikhoogrntion <br />e Tmptctignal Devlin <br />+ Constmatlnn Aulstaaro <br />Transit <br />AFFILIATIONS <br />• Orange Counfy(refficcolineering <br />Council foGTEC) <br />■teriv <br />Project Experience <br />Harbor Boulevard Traffic Signal Synchronization (TSS) Project - Olango <br />County Transportation Authority (OCTA) and City of Santa Ana, CA <br />Mr, Fat ie, served as Wait: lead and Construction Manager to provide <br />construction support and perform all necessary Integration, <br />Harbor Bivd from Chapman Ave to Newport give; spanhin$ across the <br />Cities Of Garden Grove -500A Ana, rauntaln valley and. Costa Masa, as <br />wall as freeway on/off ramps at SR -2Z and F405 within caltrons <br />Jurisdiction. In addition to generating PS&E packages for equipment <br />upgrades, the prolect also included the development; implementation <br />and flne,timingofthe AM, OM, midday, offfln. kand weekend traffic <br />signet coordination timing plans for all AU iMarsectlohsalarrg'thd corridor. <br />ports will also protide Traffic Mam dement Center (TMC) upgrades to the <br />cities of Costa Mesa and Santa Aoa,_wtdch.spans from.Closed-Clrcult - — - <br />Television (CCTV) Rcanses and workstations to designing and replaaingthe <br />City's existing video wall system with power and more advanced <br />capaoititias. <br />Barranca Kwy(Muldands Blvd Regional Traffic Signal Synchronizadon <br />Project - Cities of Irvine, Lake Forest & Mission Viejo, CA <br />Mr, Frislle is the CIA/QC Leader m provide traffic/ITS design.tmprovements <br />and traffic signal synchronization for 44 Mtarsecdcns alone a 13 -mile <br />segment of Barroom parkway/Muldr nos Blvd, The project involves design <br />of new fiber optic tables (multi and single made), Modulus, pull doxos, <br />cahtnets and controller upgrade in City of Irvine; New coAdults, pull 4m es, <br />twisted pair interconnect, and wireless.mdio in City of Lake Forest; New <br />cabliams, pedestrian slgnajs and loop detection 1, citg of Mission Viejo, in <br />addition to the traffic signal Infrastructure Improvements, Iterls Also <br />develops signal coordination plans for AM, neon, off-peak IsM, ,after- <br />hours* and weekend for all project traffic signals along the corridor. <br />Newport/dalboa Boulevard Regional Traffic Signal Synchronization <br />Project -Cities of Costa Mesa and Newport Beach, CA <br />Mr, Frlsee serves as the OVQC leader and Engineer of Record to OCTA to <br />Provide tum -key trafflcATS Improvements and traffic signal synsbronisatlan <br />for 33 Intersections along Newporl/Balboa Boulevard corridor from Bristol <br />Street in Costa Mesa to Main Street in Newport Beach, <br />Innovating Through InformaticsTm <br />25E-534 <br />