My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACTiNFD <br />KIKO ANTUNQViCFIr PE <br />kiko.antunovich�inr5.com <br />940A5.0477 <br />Project Engineer <br />_..._............ <br />EXPERIENCE <br />........ w ...... ................ ... ,..... ...w.,..,.. ,,,,._ _.... _......._.__._........ <br />Mr. Antunovich has more than three years of experience as a civil engineer. HIS <br />S yaam <br />professional experience includes project engineer, design engineer andCAD designer <br />EDUCA'nON <br />NO Is pt at rnanagingmuftlp(e municipal and agency projects. His qualifications <br />8.8; Civil Engineering <br />Include the ability to design and draftcomplax water and wastewater projects including <br />LICENSES <br />reservoirs, pump Mations, water mains and sewer pipelines. <br />Civil Engineer (CA) <br />No: 87804 <br />Project Experience <br />...::....., ,>..........__............. ,_....,,................... .._..... ......... I—; ...... .... .,.....� ...._....... _ ......... .__........... <br />Paseo Do Valencia Lift gtatioh Rehabilitation <br />MOULTON NIGUEL WATER DISTRICT i LAGUNA HILLS, CA <br />Prefect Engkleer. Mr. Anturicvich is providing project engineering; to develop plans <br />W replace aging pumps and motors to increase system reifahilty, update and replace <br />aged electrical equipment; retrofit piping, rehel51lltate fsellityfor better ventilation, and <br />legal descriptions and plats. <br />Corryno and Slauson Area Main Replacements and Abandonment <br />GOLDEN STATE WATER COMPANY I CULVER CnY, CA <br />Project Engineer: Mr. Antunovich Is acting as project engineer to develop plana and <br />spedfloaiions for the design of a potable water pipeline repiacomentpsroject located <br />in its Culver City Water system, this project includes replacing and abanooing.1,600 <br />LF of undersized and old 4 -Inch, Wrich, and 16 -Inch cast iron water rnains with S -inch <br />and 124nuh PVC in the public right of way (ROW)• The purpose ofthia project is to <br />improve water quality, Increase fareflows, reduce maintenance costs, and improve <br />system reliability within the GSWC service area. This project is set to be constructed in <br />5 sequences. <br />Azusa Sewer Lift Station <br />CITY OF WEST COVINA I WEST COVINA. CA <br />Project Engineer. Mr. Antunovioh is acting as project engineer to develop plans to <br />upgrade the "ng sewer pumps end contmis to comply with the Statewide General <br />Waste Discharge Requirements for Sanitary Sewer Systems; provide sufficient storage <br />opacity during ornm9ahcy/power outages; provide backup power systems; and $CADA <br />monitoring system to pump data and status. <br />Alley Water Main Conversion, Liberty Court <br />LONG BEACH WATER DEPARTMENT I LONG BEACH, CA <br />Lead Designer, Mr. Antunovich designed and drafted the pians for the projeoL This <br />project Included the relocation of two waterlinas and appr)xlmateiy 26 services within <br />two allays to the adjacent streets. The project consisted of the design of approximately <br />5750 LF of 8 -inch IT pipe and 500' LF of 4 -inch DC pipe. The project required extensive <br />field Investigation and coordination between the Long Beach Water Department <br />anti property owners. The project construction was also split between the Water <br />Department constructing the pipe in the side streets and the contractor constructing <br />the main within Atlantic Ave and reconnecting the service laterals. <br />25E-533 <br />
The URL can be used to link to this page
Your browser does not support the video tag.