Laserfiche WebLink
ppNTACI`00 <br />PETER SALGiADO, PE <br />petsraatgadoOrrv5.com <br />.: 849.585,p4TT <br />Construction Manager <br />..,_.... .... :............u............. ....... n ... ................ ..... —,... ..... ....,... .... —.1 ..... <br />With more than 20 years of expedonoe, Mr. Salgado has managed and delivered a <br />EXPERIENCE <br />variety of public works, projects including strept improvements; vertical construction <br />20yeam <br />and tenant improvements; parks and landscapinglmprovements; and water, power, <br />EDUCATION <br />and storm drain Improvements. Working with a variety of agencies, he is thoroughly <br />B.S. Civil Engineering <br />familiar with local, state, and federal procedures. <br />LICENSES <br />CivilEngineer (CA) <br />Project Experlence <br />No.631ti9 <br />...:.........................,...._,.........F;....:.................,.....,„.. ....... ......:......_...............:..,...._.,..... <br />STREETIMPROVEMENTS <br />Beilftowec Boulevard Pedestrian Enhancements <br />CITY OF BELLFLOWER 1 BELLFLOWER, CA <br />CnnstrucNan Manager. Mr. Salgado managed this U2M street traffic signal and <br />parkways Improvements P1100% The scope of work Included roadway ieconstruction <br />and resurfacing; recohstruction.of sidewalks (includingdec erative Paving); drive"%, <br />curbs, gutters, cross gutters, and ADA curb ramps; installation of traffic, signals, <br />controller cabinet's, and flashing be'awn, landscaping and Irrigation; and traffio striping <br />and signage (including decerstive erosswaikestthe Intersectional. <br />NNIS <br />FY 2013.2014, and FY 201"016 Annual Pavement Rehabilitation <br />017Y OF YORSA LINDA I YORSA LINDA, CA <br />Construction Manager, Mr. Salgado managed this $2,5M citywide street improvement <br />program. Specifically, the scope of work Included reconstruction of sidewalks, <br />driveways, curb, gutter, and ADA curb ramps; roadway action repairs and resurfacing; <br />crack seal and slurry seal; and, traffo striping and signage, <br />Corporate Center drive Street Lights Project <br />CI'rY OF POMONA') POMONA, CA <br />Constmation Manager. Mr, Salgado managed this $250,000 street lights project <br />that included the removal and installation of approximately 50 street fights in several <br />residential areas. <br />FY 2008 through 2016 Annual Citywide & Street improvement Projects <br />CITY OF SANTA MONICA I SANTA MONICA, CA <br />Construction Manager. Mr, Salgado provided construction management, <br />Inspection, and publfo.outreach for this annual cKywida project, Work consisted of <br />Pavement resurfacing of streets and parking lots (including slurry seal and crack <br />seal treatments); full pavement reconstruction; trofffo signal modifications; and <br />construction of new sidewalks, driveways and ADA ramps. Key services included all <br />facets of Conatructicn management and inspection including: utility and multiple <br />agency coordination; project budget and accounts tracking; engineering plan and <br />speolfloatton review; traffic management and control; submittal, schedule; request <br />for Information (RFI), progress payment review and processing; field observation; <br />negotiating and,processing change orders; document control; and project closeout, <br />Which consisted of warranties, guarantees, recommending n'otioes of completion and <br />the release of retention. Total construction cost varied between $1M and $3M. <br />25E-540 <br />