<br />PETER SALGiADO, PE
<br />petsraatgadoOrrv5.com
<br />.: 849.585,p4TT
<br />Construction Manager
<br />..,_.... .... :............u............. ....... n ... ................ ..... —,... ..... ....,... .... —.1 .....
<br />With more than 20 years of expedonoe, Mr. Salgado has managed and delivered a
<br />EXPERIENCE
<br />variety of public works, projects including strept improvements; vertical construction
<br />20yeam
<br />and tenant improvements; parks and landscapinglmprovements; and water, power,
<br />EDUCATION
<br />and storm drain Improvements. Working with a variety of agencies, he is thoroughly
<br />B.S. Civil Engineering
<br />familiar with local, state, and federal procedures.
<br />LICENSES
<br />CivilEngineer (CA)
<br />Project Experlence
<br />No.631ti9
<br />...:.........................,...._,.........F;....:.................,.....,„.. ....... ......:......_...............:..,...._.,.....
<br />STREETIMPROVEMENTS
<br />Beilftowec Boulevard Pedestrian Enhancements
<br />CITY OF BELLFLOWER 1 BELLFLOWER, CA
<br />CnnstrucNan Manager. Mr. Salgado managed this U2M street traffic signal and
<br />parkways Improvements P1100% The scope of work Included roadway ieconstruction
<br />and resurfacing; recohstruction.of sidewalks (includingdec erative Paving); drive"%,
<br />curbs, gutters, cross gutters, and ADA curb ramps; installation of traffic, signals,
<br />controller cabinet's, and flashing be'awn, landscaping and Irrigation; and traffio striping
<br />and signage (including decerstive erosswaikestthe Intersectional.
<br />NNIS
<br />FY 2013.2014, and FY 201"016 Annual Pavement Rehabilitation
<br />017Y OF YORSA LINDA I YORSA LINDA, CA
<br />Construction Manager, Mr. Salgado managed this $2,5M citywide street improvement
<br />program. Specifically, the scope of work Included reconstruction of sidewalks,
<br />driveways, curb, gutter, and ADA curb ramps; roadway action repairs and resurfacing;
<br />crack seal and slurry seal; and, traffo striping and signage,
<br />Corporate Center drive Street Lights Project
<br />CI'rY OF POMONA') POMONA, CA
<br />Constmation Manager. Mr, Salgado managed this $250,000 street lights project
<br />that included the removal and installation of approximately 50 street fights in several
<br />residential areas.
<br />FY 2008 through 2016 Annual Citywide & Street improvement Projects
<br />CITY OF SANTA MONICA I SANTA MONICA, CA
<br />Construction Manager. Mr, Salgado provided construction management,
<br />Inspection, and publfo.outreach for this annual cKywida project, Work consisted of
<br />Pavement resurfacing of streets and parking lots (including slurry seal and crack
<br />seal treatments); full pavement reconstruction; trofffo signal modifications; and
<br />construction of new sidewalks, driveways and ADA ramps. Key services included all
<br />facets of Conatructicn management and inspection including: utility and multiple
<br />agency coordination; project budget and accounts tracking; engineering plan and
<br />speolfloatton review; traffic management and control; submittal, schedule; request
<br />for Information (RFI), progress payment review and processing; field observation;
<br />negotiating and,processing change orders; document control; and project closeout,
<br />Which consisted of warranties, guarantees, recommending n'otioes of completion and
<br />the release of retention. Total construction cost varied between $1M and $3M.