CONTACT INM LUANNE BEAN, PE
<br />I.096an vS'nom Construction Manager
<br />EXPERIENCE
<br />3DyeaYs
<br />EDUCATION
<br />M.S. Civil Engineering
<br />B.S, Civil Engineering
<br />LICENSES.
<br />Civil Engineer (CAj
<br />No.5O129
<br />Rwiswnow
<br />FEMA OPS A.
<br />ifAZMAT First Rosppridee/
<br />Qperstions Level
<br />DOi Offals of Bulk
<br />and 'Ncn^Bulk HAZMAT,
<br />Packages
<br />Nuclear Waste Safely,
<br />fdrWorkere
<br />Ms. Dean has more than BO years of,axperience In the design grid management of
<br />water and wastewater projects. Her technical skills include structural analysis and
<br />design, mechanical analysis, instrumentation and control, the preparation of plans,
<br />scocifficatims. and cost estimates as well as construction management. She has
<br />hell various positions with many public agencies Includingthe. Long Beach Water
<br />Department, Victor Valley Wastewater Reclamation Authority,, Indio Water Authority,
<br />Metropolitan Water District, and FEMA. Ms. Bean'stechnical experience includes large
<br />80810 pubic works pmjacsfarcapital Improvement programs including conatruotion
<br />oversight, contract administration, document control, cost and schtdule w*ol,
<br />4041ity control, structural analysis, and design.
<br />Project Experience
<br />Ailey Water Main Converslon, Phase IVLeWIS & Lenton
<br />LONG BEACH WATER DEPARTMENT i LONGAEACH, CA
<br />Corutttucllon Manags0rulpeot0r, Me, Bean completed full service Construction
<br />Management and Inspection Services for the Phase 11 Ahoy V4tar Main 0onversion
<br />project The services included full time construction observation, material testing
<br />review of Contractor's progress payments, resolution of design lssuas, shop drawing
<br />review, RFI resolution, change order management and resolution, mestinge, public
<br />notifications and LDWD coordination for shutdowns for Mls project. Our Construction
<br />Managemetrt team resolved public complaints and problem from the local businesses
<br />and residence before they become problems for City Hall and LOWD, Me. Been also
<br />checked NPDES and BMP treasures, trafric control, and safety measured during
<br />construction.
<br />J. W. Johnson Reservoir Facility Valve Replacements and Site
<br />Improvements Project
<br />LONG BEACH WATER DEPARTMENT I COMPTON, CA
<br />Resident Eeg'""Vermstreallo" Managerr, Ms. Real was responsible for overseeing
<br />this project, which involved replacement of four underground water main valves,
<br />Installation of rive storm drain Inlets, construction of a containment cell for an Indoor
<br />above -ground chlorine tank, construction of a large concrete reinfoiued storage pad,
<br />trenching for the Installation of electrical conduit, and re -paving of surface areas to
<br />allow for proper drainage.
<br />Group 12 CIPP Sewer Relining Program
<br />LONG BEACH WATER DEPARTMENT I LONG BEACH;.CA
<br />Construction Manager. Ms, Dean was the Construction Manager for the Long BeaOp
<br />Water Department's Group 12 CIDP sewer relining program. This invoived.providing
<br />construction oversight and observation of LBWD's contractor to install almost 15,000
<br />01 8-11"01, 1O -inch, and 12•1nch cured•inOace sewer cleaning, Pre -linin g video, fining,
<br />and post iiningvidOo. Point repairs and manhole rehabilitations were also undertaken.
<br />Once the installation of the CIPP began, Ms. Octan coordinated with the LBWD for
<br />shutting off water services for the various residents and businesses along the sewer
<br />line routes. Once curing was completed, a post lining video was run, followed by re -
<br />Installation of the laterals and top hat installation on select laterals.