Laserfiche WebLink
CONTACT INM LUANNE BEAN, PE <br />I.096an vS'nom Construction Manager <br />EXPERIENCE <br />3DyeaYs <br />EDUCATION <br />M.S. Civil Engineering <br />B.S, Civil Engineering <br />LICENSES. <br />Civil Engineer (CAj <br />No.5O129 <br />Rwiswnow <br />FEMA OPS A. <br />ifAZMAT First Rosppridee/ <br />Qperstions Level <br />DOi Offals of Bulk <br />and 'Ncn^Bulk HAZMAT, <br />Packages <br />Nuclear Waste Safely, <br />fdrWorkere <br />Ms. Dean has more than BO years of,axperience In the design grid management of <br />water and wastewater projects. Her technical skills include structural analysis and <br />design, mechanical analysis, instrumentation and control, the preparation of plans, <br />scocifficatims. and cost estimates as well as construction management. She has <br />hell various positions with many public agencies Includingthe. Long Beach Water <br />Department, Victor Valley Wastewater Reclamation Authority,, Indio Water Authority, <br />Metropolitan Water District, and FEMA. Ms. Bean'stechnical experience includes large <br />80810 pubic works pmjacsfarcapital Improvement programs including conatruotion <br />oversight, contract administration, document control, cost and schtdule w*ol, <br />4041ity control, structural analysis, and design. <br />Project Experience <br />Ailey Water Main Converslon, Phase IVLeWIS & Lenton <br />LONG BEACH WATER DEPARTMENT i LONGAEACH, CA <br />Corutttucllon Manags0rulpeot0r, Me, Bean completed full service Construction <br />Management and Inspection Services for the Phase 11 Ahoy V4tar Main 0onversion <br />project The services included full time construction observation, material testing <br />review of Contractor's progress payments, resolution of design lssuas, shop drawing <br />review, RFI resolution, change order management and resolution, mestinge, public <br />notifications and LDWD coordination for shutdowns for Mls project. Our Construction <br />Managemetrt team resolved public complaints and problem from the local businesses <br />and residence before they become problems for City Hall and LOWD, Me. Been also <br />checked NPDES and BMP treasures, trafric control, and safety measured during <br />construction. <br />J. W. Johnson Reservoir Facility Valve Replacements and Site <br />Improvements Project <br />LONG BEACH WATER DEPARTMENT I COMPTON, CA <br />Resident Eeg'""Vermstreallo" Managerr, Ms. Real was responsible for overseeing <br />this project, which involved replacement of four underground water main valves, <br />Installation of rive storm drain Inlets, construction of a containment cell for an Indoor <br />above -ground chlorine tank, construction of a large concrete reinfoiued storage pad, <br />trenching for the Installation of electrical conduit, and re -paving of surface areas to <br />allow for proper drainage. <br />Group 12 CIPP Sewer Relining Program <br />LONG BEACH WATER DEPARTMENT I LONG BEACH;.CA <br />Construction Manager. Ms, Dean was the Construction Manager for the Long BeaOp <br />Water Department's Group 12 CIDP sewer relining program. This invoived.providing <br />construction oversight and observation of LBWD's contractor to install almost 15,000 <br />01 8-11"01, 1O -inch, and 12•1nch cured•inOace sewer cleaning, Pre -linin g video, fining, <br />and post iiningvidOo. Point repairs and manhole rehabilitations were also undertaken. <br />Once the installation of the CIPP began, Ms. Octan coordinated with the LBWD for <br />shutting off water services for the various residents and businesses along the sewer <br />line routes. Once curing was completed, a post lining video was run, followed by re - <br />Installation of the laterals and top hat installation on select laterals. <br />25E-541 <br />