|
PETE GOLDINGr PLS
<br />Survey/Mapptng
<br />..... »......,._w.,...................:........4........».»,,..............»»
<br />Mr. Goldhngbrings'.43 years of axperenoe that includes a wide verioty of projects
<br />In both land development and public works projects. He hes completed surveying
<br />projects In California, Nevada and wisconsin and his expertise includes hundreds of
<br />boundary retracements, manyirrfoiving the Public Land SurvaySystem, Qps Surveying,
<br />map and ALTA production, and construction surveying: He has extensive offco and
<br />field experience supporting his clients, He has prepared hundreds of plats and legal
<br />descriptions, Hehasprepared and been in responsible charge of many parcel Maps,
<br />Final Maps and Records of Survey. He hes also performed many topographic surveys,
<br />by photogrammetric methods as well as by field collection methods:
<br />Preje>~t Eliperlence.
<br />............»..»........»..»....»..».»..................��.,...,.............. ....,.......,..»»..: ...,................
<br />Sunrise Powerllnk Project I San Diego GAS: & Electric I San Diego
<br />County, ¢A
<br />Project manager forsurvey and aqulshion'drawings for approximately 138 miles of
<br />new transmission corridors through San Diego County. project Included the subdivision
<br />Of approximately 866 sections through 20. townships. Field crews recovered more than
<br />100 GLQ/BLM monuments, marry from the surveys. performed in the t.S80S. ALTA
<br />SUM" were performed on mitigation properties purchased by SDQ&E, follow ad by
<br />flOng records of survey with the county surveyor,
<br />Qualcomm Stedlunt Eupamslon I Qtraicomm Stadium I San Diego, CA
<br />Project surveyor for topographic survey of Qualcomin Stadium and:surmunding parking
<br />lot and facilities. Set and tied pre-rMarks to Califomia Coordinate System and to existing
<br />stadium Control geometry. Provided additional survey data from field Shots on columns,
<br />wells, seating levels.
<br />International Boundary Water Commission i US/'Mexico Border
<br />Responsibie.forsurvey projects on the US/Mexico border involvingSewer and drainage
<br />issues affecting both Countries. Provided survey control for construction of the new
<br />Sewage Treatment Plant
<br />Beach Restoration I County of San Diego i San Diego, CA
<br />Set and tied survey control points for photogrammetric survey Of several of San Diego
<br />County's beaches including Imperial Beach and north county beaches from La Jolla to
<br />Oceanside. After restoration design, _provided survey control for fill send dredged from
<br />offshore and pumped onto the beaches.
<br />The Crosby Estate I The Crosby Family I Rancho Santa Fe, CA
<br />Responsible for construction staking at new golf course community in Rancho Santa
<br />Fe. The project Included a now golf course, driving range, golf club, tennis and
<br />swim club as well as a mix of residential units including single family homes and
<br />condominiums, Performed stakingfor now hiking trail along the San Diegulto River.
<br />Navy Clean 111 Bechtel Corporation I Southern California
<br />Survey Manager for projects performed under contract with the Bechtel Corporation for
<br />the federal program to remove environmental hazards from military bases throughout
<br />Southern California. Much of the work Involved GPS Surveying to set up control on the
<br />bases for Investigative/exploratory work by. environmental teams.
<br />25E-547
<br />APPENDIX
<br />CONTACT'INFO
<br />i ;`•
<br />'PBte,gold ingiw.Goin'
<br />i i i
<br />949:Ii86:iF477
<br />:
<br />EXRE'RIENCE
<br />4� dais
<br />Epjl�Atfit?N
<br />i
<br />B.A Mathematlas :,..
<br />Brofiessfonsf Lefitt
<br />tirveyok, CA #tso4T68
<br />R
<br />�I
<br />i
<br />l�
<br />PETE GOLDINGr PLS
<br />Survey/Mapptng
<br />..... »......,._w.,...................:........4........».»,,..............»»
<br />Mr. Goldhngbrings'.43 years of axperenoe that includes a wide verioty of projects
<br />In both land development and public works projects. He hes completed surveying
<br />projects In California, Nevada and wisconsin and his expertise includes hundreds of
<br />boundary retracements, manyirrfoiving the Public Land SurvaySystem, Qps Surveying,
<br />map and ALTA production, and construction surveying: He has extensive offco and
<br />field experience supporting his clients, He has prepared hundreds of plats and legal
<br />descriptions, Hehasprepared and been in responsible charge of many parcel Maps,
<br />Final Maps and Records of Survey. He hes also performed many topographic surveys,
<br />by photogrammetric methods as well as by field collection methods:
<br />Preje>~t Eliperlence.
<br />............»..»........»..»....»..».»..................��.,...,.............. ....,.......,..»»..: ...,................
<br />Sunrise Powerllnk Project I San Diego GAS: & Electric I San Diego
<br />County, ¢A
<br />Project manager forsurvey and aqulshion'drawings for approximately 138 miles of
<br />new transmission corridors through San Diego County. project Included the subdivision
<br />Of approximately 866 sections through 20. townships. Field crews recovered more than
<br />100 GLQ/BLM monuments, marry from the surveys. performed in the t.S80S. ALTA
<br />SUM" were performed on mitigation properties purchased by SDQ&E, follow ad by
<br />flOng records of survey with the county surveyor,
<br />Qualcomm Stedlunt Eupamslon I Qtraicomm Stadium I San Diego, CA
<br />Project surveyor for topographic survey of Qualcomin Stadium and:surmunding parking
<br />lot and facilities. Set and tied pre-rMarks to Califomia Coordinate System and to existing
<br />stadium Control geometry. Provided additional survey data from field Shots on columns,
<br />wells, seating levels.
<br />International Boundary Water Commission i US/'Mexico Border
<br />Responsibie.forsurvey projects on the US/Mexico border involvingSewer and drainage
<br />issues affecting both Countries. Provided survey control for construction of the new
<br />Sewage Treatment Plant
<br />Beach Restoration I County of San Diego i San Diego, CA
<br />Set and tied survey control points for photogrammetric survey Of several of San Diego
<br />County's beaches including Imperial Beach and north county beaches from La Jolla to
<br />Oceanside. After restoration design, _provided survey control for fill send dredged from
<br />offshore and pumped onto the beaches.
<br />The Crosby Estate I The Crosby Family I Rancho Santa Fe, CA
<br />Responsible for construction staking at new golf course community in Rancho Santa
<br />Fe. The project Included a now golf course, driving range, golf club, tennis and
<br />swim club as well as a mix of residential units including single family homes and
<br />condominiums, Performed stakingfor now hiking trail along the San Diegulto River.
<br />Navy Clean 111 Bechtel Corporation I Southern California
<br />Survey Manager for projects performed under contract with the Bechtel Corporation for
<br />the federal program to remove environmental hazards from military bases throughout
<br />Southern California. Much of the work Involved GPS Surveying to set up control on the
<br />bases for Investigative/exploratory work by. environmental teams.
<br />25E-547
<br />
|