Laserfiche WebLink
PETE GOLDINGr PLS <br />Survey/Mapptng <br />..... »......,._w.,...................:........4........».»,,..............»» <br />Mr. Goldhngbrings'.43 years of axperenoe that includes a wide verioty of projects <br />In both land development and public works projects. He hes completed surveying <br />projects In California, Nevada and wisconsin and his expertise includes hundreds of <br />boundary retracements, manyirrfoiving the Public Land SurvaySystem, Qps Surveying, <br />map and ALTA production, and construction surveying: He has extensive offco and <br />field experience supporting his clients, He has prepared hundreds of plats and legal <br />descriptions, Hehasprepared and been in responsible charge of many parcel Maps, <br />Final Maps and Records of Survey. He hes also performed many topographic surveys, <br />by photogrammetric methods as well as by field collection methods: <br />Preje>~t Eliperlence. <br />............»..»........»..»....»..».»..................��.,...,.............. ....,.......,..»»..: ...,................ <br />Sunrise Powerllnk Project I San Diego GAS: & Electric I San Diego <br />County, ¢A <br />Project manager forsurvey and aqulshion'drawings for approximately 138 miles of <br />new transmission corridors through San Diego County. project Included the subdivision <br />Of approximately 866 sections through 20. townships. Field crews recovered more than <br />100 GLQ/BLM monuments, marry from the surveys. performed in the t.S80S. ALTA <br />SUM" were performed on mitigation properties purchased by SDQ&E, follow ad by <br />flOng records of survey with the county surveyor, <br />Qualcomm Stedlunt Eupamslon I Qtraicomm Stadium I San Diego, CA <br />Project surveyor for topographic survey of Qualcomin Stadium and:surmunding parking <br />lot and facilities. Set and tied pre-rMarks to Califomia Coordinate System and to existing <br />stadium Control geometry. Provided additional survey data from field Shots on columns, <br />wells, seating levels. <br />International Boundary Water Commission i US/'Mexico Border <br />Responsibie.forsurvey projects on the US/Mexico border involvingSewer and drainage <br />issues affecting both Countries. Provided survey control for construction of the new <br />Sewage Treatment Plant <br />Beach Restoration I County of San Diego i San Diego, CA <br />Set and tied survey control points for photogrammetric survey Of several of San Diego <br />County's beaches including Imperial Beach and north county beaches from La Jolla to <br />Oceanside. After restoration design, _provided survey control for fill send dredged from <br />offshore and pumped onto the beaches. <br />The Crosby Estate I The Crosby Family I Rancho Santa Fe, CA <br />Responsible for construction staking at new golf course community in Rancho Santa <br />Fe. The project Included a now golf course, driving range, golf club, tennis and <br />swim club as well as a mix of residential units including single family homes and <br />condominiums, Performed stakingfor now hiking trail along the San Diegulto River. <br />Navy Clean 111 Bechtel Corporation I Southern California <br />Survey Manager for projects performed under contract with the Bechtel Corporation for <br />the federal program to remove environmental hazards from military bases throughout <br />Southern California. Much of the work Involved GPS Surveying to set up control on the <br />bases for Investigative/exploratory work by. environmental teams. <br />25E-547 <br />APPENDIX <br />CONTACT'INFO <br />i ;`• <br />'PBte,gold ingiw.Goin' <br />i i i <br />949:Ii86:iF477 <br />: <br />EXRE'RIENCE <br />4� dais <br />Epjl�Atfit?N <br />i <br />B.A Mathematlas :,.. <br />Brofiessfonsf Lefitt <br />tirveyok, CA #tso4T68 <br />R <br />�I <br />i <br />l� <br />PETE GOLDINGr PLS <br />Survey/Mapptng <br />..... »......,._w.,...................:........4........».»,,..............»» <br />Mr. Goldhngbrings'.43 years of axperenoe that includes a wide verioty of projects <br />In both land development and public works projects. He hes completed surveying <br />projects In California, Nevada and wisconsin and his expertise includes hundreds of <br />boundary retracements, manyirrfoiving the Public Land SurvaySystem, Qps Surveying, <br />map and ALTA production, and construction surveying: He has extensive offco and <br />field experience supporting his clients, He has prepared hundreds of plats and legal <br />descriptions, Hehasprepared and been in responsible charge of many parcel Maps, <br />Final Maps and Records of Survey. He hes also performed many topographic surveys, <br />by photogrammetric methods as well as by field collection methods: <br />Preje>~t Eliperlence. <br />............»..»........»..»....»..».»..................��.,...,.............. ....,.......,..»»..: ...,................ <br />Sunrise Powerllnk Project I San Diego GAS: & Electric I San Diego <br />County, ¢A <br />Project manager forsurvey and aqulshion'drawings for approximately 138 miles of <br />new transmission corridors through San Diego County. project Included the subdivision <br />Of approximately 866 sections through 20. townships. Field crews recovered more than <br />100 GLQ/BLM monuments, marry from the surveys. performed in the t.S80S. ALTA <br />SUM" were performed on mitigation properties purchased by SDQ&E, follow ad by <br />flOng records of survey with the county surveyor, <br />Qualcomm Stedlunt Eupamslon I Qtraicomm Stadium I San Diego, CA <br />Project surveyor for topographic survey of Qualcomin Stadium and:surmunding parking <br />lot and facilities. Set and tied pre-rMarks to Califomia Coordinate System and to existing <br />stadium Control geometry. Provided additional survey data from field Shots on columns, <br />wells, seating levels. <br />International Boundary Water Commission i US/'Mexico Border <br />Responsibie.forsurvey projects on the US/Mexico border involvingSewer and drainage <br />issues affecting both Countries. Provided survey control for construction of the new <br />Sewage Treatment Plant <br />Beach Restoration I County of San Diego i San Diego, CA <br />Set and tied survey control points for photogrammetric survey Of several of San Diego <br />County's beaches including Imperial Beach and north county beaches from La Jolla to <br />Oceanside. After restoration design, _provided survey control for fill send dredged from <br />offshore and pumped onto the beaches. <br />The Crosby Estate I The Crosby Family I Rancho Santa Fe, CA <br />Responsible for construction staking at new golf course community in Rancho Santa <br />Fe. The project Included a now golf course, driving range, golf club, tennis and <br />swim club as well as a mix of residential units including single family homes and <br />condominiums, Performed stakingfor now hiking trail along the San Diegulto River. <br />Navy Clean 111 Bechtel Corporation I Southern California <br />Survey Manager for projects performed under contract with the Bechtel Corporation for <br />the federal program to remove environmental hazards from military bases throughout <br />Southern California. Much of the work Involved GPS Surveying to set up control on the <br />bases for Investigative/exploratory work by. environmental teams. <br />25E-547 <br />