My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSULTING ENGINEERS <br />I <br />� I I <br />RtSM FOR <br />i OPTY N. FERNANDEZ <br />s h <br />Chief Eteehleat tngirmeer <br />' EDUCATION <br />I i B.5.. ElwinceiEngineering, CaOfornis stets university, Long Beach, CA 1t,82 <br />I, <br />f PROFESSIONAL REGISTRATION <br />I Asgtstered Electrical ll�rtginosr, California E•012496 <br />PROJECT EXPERIENCE <br />Mr. temant zhaseyar30gaarsddveiseexperienceindtfacetsofeiecrWengineering; Including law and mediamvoltage <br />pourarclslrtnrton. P {nstmrrrerrtefkxs and controls, power qualOy skrtiles, and value engineering. Ne:has experience in <br />weterand wastewater, municipal, Indusidel, commercial, high technology Industrial and fnsiftutkuud inif ies Kc pan <br />adeztias <br />been ravonsibleforlechnical",is% construction management quality assurance, canceptuairfes tss,mnstnad[onpleasand <br />spedOoagons, subrhutial reviews, ander astkmiates. Mr. Fernandegs recant design experience fndudeamedkrm (Up to 66ky) <br />i and low vow pmmerdekibuloa, process and equipment cont(oie, PLC Integration design ondprogiemming, DCS, SCADA, <br />tolemefry, Ifil.scveen deveapmentesing popularsonwere such as Wonderware and RSVaw, smorgency and stand-by paver <br />j generation, UPS ami i i*pcvmr, and indoorand outdoor I(ghting, <br />REPRESENTATIVE PROJECTS <br />Cfly of Camarillo, Wastewater Pumping Station No. S <br />Ned Status: Operathtg since gg6105. The-lobject is a now wastewater pumping lit $talon for a now housing development in <br />the City ofComedic, The Oft stalionacapableofpwnpag1100gallons Pei Minute,and isequipped with three(3)25 <br />horsepower pump. All the electrical equipment is installed outdoor in a NEMA 4 enatosdre hieadkhg the mem seitchboatd, the <br />motor control center end the control panel, Each pump is controlled by a variable frequency drive which operates to match in <br />incoming taw. An kdograted PLC. OIT and telemetry system controls the lift station and commook atca the staiiim status, <br />conirets, and alarm points to on existing SCADA system. The Oft station is equipped wtti a 1gl KWst$rrdbygenarster in the <br />event at ultitypowar follwe. <br /><i <br />I <br />Las Alamitos WastewaterPump Station <br />Pmjaot Stshts: Operating sace 12108; Prepared a preliminary design report and Onaldesign plans for ire Deve(operfunded <br />Storm Water Pump Ston in the Los Alamitos Rece Track Parking Lot Peoilky includes iBOOggm submeraWle pwnps la wet <br />well with valve vaults, the MCC, Control System. Thefaolitypump the collected storm water road Item the perking lotinto a <br />local storm drain system. <br />Coaohetla Valley Water District, indlan Wali Lift Station <br />Project Stakis: Operating ainese 03(06. The OR station consists of two 60 by xubmo.sikia pumps controlled by vwlablefrequensy <br />drives to moduleto the pump$ and match the incoming flow. A 2100 kW miss! generator pmAde emeromeysmawer in the evgntnf <br />utiBy power outaga, The stalon is monitored and controlled locally a local PLC and ramalsly via an existing SCADA system. <br />;I <br />j Walnut Park Water District Booster Pump Station Replacement <br />Project Stalus: Operating since UK The project encompasses the replacement of a closed system booster pump station and <br />associated equipment which Includes the replacement of existing electrical service equipment, pumps and motors; motor control <br />center and provisions for a future 1500 gpm watt. In addition, a new PLC based control system and instruments were provided to <br />control the now booster station, the existing two (2)125 hp well pumps and the future well pump. Furthermore, the existing 460 <br />kW diesel generator and automatic transfer switch were salvaged and integrated wif i the now dleolrical system as well as read <br />to the existing wall pumps and chlorination facility. <br />25E-548 <br />
The URL can be used to link to this page
Your browser does not support the video tag.