Laserfiche WebLink
TAIT & Associates, Inc. <br />On -Call Engineering services <br />0 wwm� <br />Improvements for a 865 -acre retail center. Because of downstream storm water concerns the site was <br />design to capture and Infiltration over 9%cif the project's on-site storm water runoff with multiple <br />small basins along the perimeter, a 1000 -foot long linear basin along the project's western boundary <br />and a 3 -acre basin capable of detaining and infiltrating a 100 -year storm event. The Site improvements <br />also included a half -mile of dry utility distribution services undergrounding and new Installation along <br />the project's perimeter. The Project's Parcel Map also included the dedication of roadway right of way <br />for the widening of Avenue L and 670th Street west and the construction of Avenue K-12 (a new public <br />street), <br />Harbor Boulevard Street Reconfiguration, Water Main Replacement & Utility Relocations, City of <br />Garden Grove, Senior Project Manager, 2013 <br />Project Manager of the work being conducted by all TAIT staff to provide Design Engineering Service for <br />then $SOD K water main replacement and utility relocation project and the $1 M Street Reconfiguration . <br />Project in the City of Garden Grove. Primary responsibilities were to review.and stamp the plans, <br />supervise engineering team, and attend and coordinate project meetings with Citystaff and other <br />stakeholders, Project included Providing Plans Specifications and Cost estimate for City improvements to <br />Harbor Boulevard that will accommodate the future. redevelopment of several city -owned parcels. This <br />project included reconfiguration of Harbor Boulevard from Palm Street to tampson. Avenue <br />(approximately 1/3 -mite total length), improvements to an existing raised median, abandonment of <br />existing 8 -Inch ACP and 12 -inch DIP City water lines, Installation of a 800 LF of new -16 -Inch water line, <br />relocation of SCE and AT&T main distribution service lines, and the installation of new public storm <br />drains, sewer and water services, <br />A -Town Street Widening and Sewer Capacity Improvements, City of Anaheim, Sr. Project Manager, 2007 <br />Engineering design.services Included the design of sewer capacity enhancements for over 2 miles on <br />new 1S -Inch and 21 -inch sewer lines in Katella Ave., Gene Autry Way and Santa Cruz Rd. in the City's <br />Platinum Triangle area. Encroachment permits were obtained from the Orange County Sanitation <br />District for connections to a district sewer line and with Caltrans District 12 (Orange County) for work <br />within Interstate 1-5 right of way. The engineering design services also included the preparation street <br />widening plans for Katella Avenue, State College Boulevard and Gene Autry Way (approximately one - <br />mile) that included a new raised landscape median in Katella Avenue, and the reconstruction of a City <br />Changeable Message Sign. <br />Abridged List of Additional Project Experience by Todd: <br />A quadrant III Water Line Replacements, City of Chino, QA/QC Manager <br />D Tustin Metrolink Station Redevelopment, City of Tustin/OCTA, Sr. Project Manager <br />F Red Hill Median & Streetscape Feasibility Study, City of Tustin, Sr. Project Manager <br />A County Regional Park, OC Parks, City of Tustin, Sr. Project Manager <br />A Yorba Linda Water District Sewer Main Replacement, Yorba Linda, CA <br />➢ Normandie Avenue Water line Replacement Project, Golden State Water Company <br />Y Antonio Parkway Widening Improvements, County of Orange <br />IiA(T Appendix j Page 4 <br />25E-583 <br />