Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey
<br />TAFT & Associates, Inc.
<br />Park, Design Engineer/Project Coordinator, 2015
<br />On -Call Engineering Services
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners, LLC for the design of a
<br />r
<br />L
<br />Bentley Microstation and Geopok software was primarily used in the design and preparation of plans.
<br />The project was directed by the North Dakota Department of Transportation.
<br />n
<br />Adams Hill Water Main Replacement Project, Glendale Water and Power, Design Engineer, 2014
<br />The Adams Hill water main replacement project included six phases, 13 streets, and approximately
<br />pt`
<br />10,620 linear feet of water line that was designed to replace existting service pipe mains with ductile iron
<br />S
<br />pipe. The project included new services, hydrants, inverts, tie -Ins, and other appurtenances. As well, the
<br />e
<br />project included different pressure zones and thefnsWiation of a division gate. Department of Public
<br />f
<br />Health waiver exhibits were prepared for select non -potable and water crossings. The project included
<br />e
<br />a community outreach meetings, service survey coordination, aswell as detailed final As-Bulit
<br />a
<br />submittals.
<br />`g
<br />Monterey Park Marketplace Site Development, Monterey Park Retail Partners, LLC/City of Monterey
<br />Park, Design Engineer/Project Coordinator, 2015
<br />g
<br />u i
<br />TAIT was awarded a contract with the developer, Monterey Park Retail Partners, LLC for the design of a
<br />41 acre retail development within the City of Monterey Park and the City of Montebello. The design of
<br />g
<br />the development includes slope stabilization, retaining wall design, street -improvement design, utility
<br />�3
<br />installation, overall site development, and over 400,000 cubic yards of dirt removal and regrading. The
<br />project involves three geotechnical analysis. The geotechnical analysis included recommendations for
<br />"$
<br />the design on and nearthe landfill; for the slope stabilization throughout the site; and forthe overall site
<br />s i
<br />development and construction. The project utilized detailed retaining wail designs and in some areas,
<br />e
<br />pile designs. These retaining walls and pile designs were specially designed near SCE facilities and
<br />3
<br />towers. Unique construction equipment has been detailed out and coordinated for this construction.
<br />Foothill Waterline Improvement Projects, Golden State Water Company,.Design.Engmeer, 2013
<br />R4
<br />The Foothill Improvements included six projects that were designed to replace existing service pipe
<br />`g
<br />mains with g" ductile Iron pipe. One of the six projects included replacement of the transmission line
<br />and reconnection to three existing wells. The total pipe replacement was approximately 13,200 linear
<br />a a
<br />feet. Multiple agencies reviewed the design plans, including City of San Dimas, City of Claremont, City of
<br />Arcadia and the County of Los Angeles in addition to Golden State Water.
<br />F
<br />Freeman Ave. Water Line improvement Projects, Golden State Water Company, Project Design
<br />Engineer, 2013
<br />f
<br />The Freeman Avenue Water Line Improvement included approximately 3600 linear feet of water line
<br />that was designed to replace existing service pipe mains with g" ductile iron pipe. The project included
<br />new services, hydrants, Inverts, tie-ins, and other appurtenances. Department of Public Health waiver
<br />'
<br />"t
<br />exhibits were prepared to the satisfaction of Golden State Water Company for select non -potable and
<br />water crossings,
<br />g
<br />Normandle Ave. Water Line improvements, Golden State Water Company, Design Engineer, 2033
<br />t
<br />The project encompassed the planning and design for a 12" water main replacement in Normandle Ave.
<br />In the County of Los Angeles, approximately 1400' linear feet. Project included new services, hydrants,
<br />a
<br />Inverts, tie-ins and other appurtenances. Existing 14" pipe was designed for abandonment, Department
<br />of Public Health waiver exhibits were prepared to the satisfaction of Golden State Water Company for
<br />select non -potable and water crossings. GWSC project engineer: Conde Ventura.
<br />c D
<br />Appendix I Page 9
<br />TAITa
<br />2 E-588