My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Education <br />B.S. •- Civil Engineering, <br />Tulane University,. 2001 <br />Year of Tait Team <br />Enlistment <br />TAIT & Associates, Inc. <br />Un Call Engineering Services <br />Michael DeLaGarza, CPESC, CPSWQ, QSD/CUSP, E.I.T. <br />PMEerENGINEER <br />Mr, DeLeGaraa has professional experience in the civil engineering and water <br />quality design and Inspection field. He Is a Stormwater Treatment and <br />Management Plan specialist and has prepared and Inspected Water Quality and <br />Stormwater Management Plans throughout Southern California on projects <br />ranging from single acre development sites to large master planned <br />communities. His technical background and areas of expertise include the <br />preparation of NPDES documents now mandated bVState of California. In <br />addition to serving as the fine's storm water quality design specialist and <br />erosion control design professional, Mr. DetaGarza also provides design services <br />as a project engineer on various public and private development projects. <br />2002 OC Plan Checking Service, Project Engineer, 2014 - Present <br />Total Experience Project Engineer service the county of orange responsible for review and <br />comment on water quality, grading, erosion control, and utility design plans. <br />16 Assist project manager with preparation and transmittal of plan check <br />Certifications documentation per county development standards. <br />Certified Professional in County of Orange El Toro & Alton Infrastructure Development, Irvine, Project <br />Erosion and Sediment <br />Engineer, 03/2015 • Present <br />Control (CPESC), 2007 <br />Project Engineer responsible for the water quality system design on a 100 acre <br />License No. 4606 <br />and 34 acre site owned by the County. of Orange in the City of Irvine. Water <br />quality design included preparation of water quality management plans in <br />Certified Professional in <br />compliance with the most recent NPDES requirements, the design and sizing of <br />Storm Water Quality <br />the required treatment devices, and the calculation and analysis of the storm <br />(CPSWQ),2008License No. <br />water flows required for water quality treatment. <br />Soo <br />Mesa Verde Senior Housing, Costa Mesa, Project Engineer, 07/2011— 01/201S <br />Qualified SWPPP Developer <br />Project Engineer responsible for development of entire project design plan set <br />(QSD)/Practitioner (QSP), <br />including water quality management plan, hydrology report, grading plans, <br />2012 Cert, No. 22544 <br />storm drain plans, wet utility plans, striping plans, fire protection plans, and <br />then preparation and submittal of the SWPPP. Project required construction <br />NPDES Construction Water <br />observation and Inspection during the construction phase In order to verify <br />Pollution Control Training <br />property pouring and construction of car port footings and slabs. Interacted <br />(24 Training Hours), 2006 <br />and coordinated with Contractor to ensure compliance with plans. <br />Sample Collection and Abridged List of Additional Project Experience by Michael. <br />Measurement Training for y Stormwater Management Plan/WQMP for Orange County Animal Care <br />SWPPP Requirements, 2012 FaelRty, Tustin, CA, Project Engineer <br />Engineer -In -Training — D Kilroy Development, San Diego, Project Engineer <br />California, 2005 ➢ Kaiser Medical Office Building, Temecula, Project Engineer <br />Great Wolf Waterpark & Lodge, Project Engineer <br />2TAIT Appendix I Page 14 <br />5E-593 <br />
The URL can be used to link to this page
Your browser does not support the video tag.