|
Education
<br />AS Drafting Technologies,
<br />HIgh-Tech Institute,
<br />Phoenix, AZ
<br />Year of TAiT Team
<br />Enlistment
<br />2016
<br />Total Experience
<br />13
<br />r� I
<br />TAIT &Associates, Inc. c
<br />On -Call Engineering Services I
<br />R5 �
<br />i
<br />Nicholas Flores
<br />CAR DESIGNER
<br />Nicholas is a CAD Designer with more than a decade of professional experience
<br />on projects ranging from private and public colleges, hospitals, U.S. embassies,
<br />pedestrian plazas, streetscapes, libraries, airport, museums, and private
<br />residences. He specializes in 3D design, BIM coordination, and creating and
<br />maintaining construction documents following project and jurisdictional
<br />standards.
<br />The Commons at Quartz Hill, City of Lancaster - CAD Designer, 2025 -Present
<br />Nick is currently the CAD Designer for the 40 -acre retail center that lnciudes an
<br />185,000 square -foot Walmart Supercenter, 14 outparcels and over $7 million of
<br />off-site improvements, He worked on designing and preparing plans for street
<br />sections for lane widening and median Improvement for W Ave L and 60th St W
<br />and street sections for the new Ave K-12, east of 60th St. The off-site
<br />Improvements include approximately one mile of roadway improvements,
<br />construction of two new traffic signals and modification to one existing traffic
<br />signal, construction of 1500 LFof City master plan 60 to 72 -Inch storm drain line,
<br />and approximately 1.5 mikes on new I ACWD water lines Improvements. The
<br />project also includes undergounding of nearly 1,500 linear feet of existing
<br />Southern California Edison (SCE) distribution lines and protection of existing SCE
<br />transmission lines. The Intersection of Avenue L and 601s Street West was
<br />designed to accommodate an existing SCE street transmission polo within the
<br />intersection's roadway Improvements: Plan's standards, details, specification
<br />and design criteria were in accordance with public works standards and to the
<br />satisfaction of city plan checkers.
<br />ACE, Phase li Grade Separations (Fullerton Road/Gale Avenue), City of
<br />Industry, CA - CAD Designer, 2015
<br />Nick was responsible for onsite regrading, drainage analysis, utility redesign,
<br />final paving layout, and 3D model coordination for 5 sites (a bank, fast food
<br />business, an office building, and 2 industrial where houses) at the intersections
<br />of Fullerton Road, Gale Avenue, and Railroad Street. Fullerton Road is being
<br />regraded to pass under existing Union Pacific Railroad at the same time the
<br />railroad is being bridged to gain additional underpass clearance. Additional
<br />Improvements Nick coordinated with, and provided support for, include 2 street
<br />Intersections, an 80 -foot wide railroad embankment regrade, 2 bridging
<br />structures, 60 -Inch and 72 -inch storm drain realignments and all gravity utilities
<br />under the regraded streets,
<br />Broad Museum (Downtown Los Angeles — Grand Ave/Hope St), Los Angeles,
<br />CA • CAD Designer, 2013
<br />Nick was responsible for generating and coordinating on-site construction
<br />documents and off-site street Improvement plans Improving all streets
<br />iII TAIT
<br />Appendix I Page 15
<br />25E-594
<br />rf
<br />�s
<br />Kr
<br />A
<br />'9f
<br />I
<br />
|