Laserfiche WebLink
Education <br />AS Drafting Technologies, <br />HIgh-Tech Institute, <br />Phoenix, AZ <br />Year of TAiT Team <br />Enlistment <br />2016 <br />Total Experience <br />13 <br />r� I <br />TAIT &Associates, Inc. c <br />On -Call Engineering Services I <br />R5 � <br />i <br />Nicholas Flores <br />CAR DESIGNER <br />Nicholas is a CAD Designer with more than a decade of professional experience <br />on projects ranging from private and public colleges, hospitals, U.S. embassies, <br />pedestrian plazas, streetscapes, libraries, airport, museums, and private <br />residences. He specializes in 3D design, BIM coordination, and creating and <br />maintaining construction documents following project and jurisdictional <br />standards. <br />The Commons at Quartz Hill, City of Lancaster - CAD Designer, 2025 -Present <br />Nick is currently the CAD Designer for the 40 -acre retail center that lnciudes an <br />185,000 square -foot Walmart Supercenter, 14 outparcels and over $7 million of <br />off-site improvements, He worked on designing and preparing plans for street <br />sections for lane widening and median Improvement for W Ave L and 60th St W <br />and street sections for the new Ave K-12, east of 60th St. The off-site <br />Improvements include approximately one mile of roadway improvements, <br />construction of two new traffic signals and modification to one existing traffic <br />signal, construction of 1500 LFof City master plan 60 to 72 -Inch storm drain line, <br />and approximately 1.5 mikes on new I ACWD water lines Improvements. The <br />project also includes undergounding of nearly 1,500 linear feet of existing <br />Southern California Edison (SCE) distribution lines and protection of existing SCE <br />transmission lines. The Intersection of Avenue L and 601s Street West was <br />designed to accommodate an existing SCE street transmission polo within the <br />intersection's roadway Improvements: Plan's standards, details, specification <br />and design criteria were in accordance with public works standards and to the <br />satisfaction of city plan checkers. <br />ACE, Phase li Grade Separations (Fullerton Road/Gale Avenue), City of <br />Industry, CA - CAD Designer, 2015 <br />Nick was responsible for onsite regrading, drainage analysis, utility redesign, <br />final paving layout, and 3D model coordination for 5 sites (a bank, fast food <br />business, an office building, and 2 industrial where houses) at the intersections <br />of Fullerton Road, Gale Avenue, and Railroad Street. Fullerton Road is being <br />regraded to pass under existing Union Pacific Railroad at the same time the <br />railroad is being bridged to gain additional underpass clearance. Additional <br />Improvements Nick coordinated with, and provided support for, include 2 street <br />Intersections, an 80 -foot wide railroad embankment regrade, 2 bridging <br />structures, 60 -Inch and 72 -inch storm drain realignments and all gravity utilities <br />under the regraded streets, <br />Broad Museum (Downtown Los Angeles — Grand Ave/Hope St), Los Angeles, <br />CA • CAD Designer, 2013 <br />Nick was responsible for generating and coordinating on-site construction <br />documents and off-site street Improvement plans Improving all streets <br />iII TAIT <br />Appendix I Page 15 <br />25E-594 <br />rf <br />�s <br />Kr <br />A <br />'9f <br />I <br />