My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERING SERVICES PROPOSAL <br />RPP NO.: 17-083 <br />City of Santa Ana <br />RELEVANT PROJECT EXPERIENCE <br />Mark Thomas team has planned and designed a wide variety of locally and federally funded capital <br />Improvement projects throughout California,, ncluding for public agencies In Orange and Los Angeles Counties. <br />Such projects have included complete streets design, roadway reconstruction, pavement rehabilitation, active <br />transportation planning, signing and striping, ADA improvements and upgrades, operational improvements, <br />mulgmodal enhancements, highway widenings, and storm drainage facilities, Below is a table highlighting our <br />relevant project experience. <br />. _ <br />®. <br />Bayside Drive <br />Mark Thomas is providing engineering, geometric and transportation design <br />Improvements <br />services to complete this this roadway project that will greatly Improve pedestrian <br />Project <br />safety, bicycle connectivity, and overall vehicular and multimodal operations in <br />the City of Newport Beach. This pro act includes four distinct elements; pavement <br />ments <br />rehabilitation, Improveto the PCH intersection which involves CalMans <br />Na Beach, CA <br />approvals, traffic calming elements, and bicycle and pedestrian improvements. <br />Key services that we are providing include: <br />Complete Streets: We will Improve vehicle, bicycle, pedestrian, and transit <br />connectivity with the addition of bike lanes, sidewalks, mid -block crossing, and <br />crosswalks to provide an Inviting and safe corridor. <br />Pavement Rehabilitation: We will Implement creative rehabilitatation strata les <br />for the pavement along Bayside Drive which shows signs of recent crack seeis and <br />significant wear at the ECH Intersection. <br />Caltrans Approval and Permitting: Improvements to the intersection with ECH will <br />require approvals from Caltrans. We will submit the encroachment permit as soon <br />as the geometry has been approved. <br />Urban Design: We will develop high level landscape concepts for the landscaping <br />and hardscape design that will include raised medians, Islands, decorative <br />pavement treatments, sidewalks and crosswalks, and planting and Irrigation. <br />Client Reference: <br />Year Completed: <br />Patrick Arcinlega, PE, City of Newport Beach (Public Works Department) <br />2017 -On-going <br />Phone: 949.644.3311' 1 100 Civic Center Drive, Newport Beach, CA 92658 <br />Multiple Pavement <br />Mark Thomas has prepared final design for four pavement rehabilitation projects <br />Rehabilitation <br />on various roadways throughout the City of Fullerton. Work along these corridors <br />Projects <br />Included the evaluation of the existing pavement and the development of final plans <br />for rehabilitation or replacement. The design included replacing non -ADA compliant <br />curb ramps and replacing concrete sidewalk, curb, and gutter that were in poor <br />Foliation; CA <br />condition. These projects Include our on-going Chapman Avenue project and: <br />Commonwealth Avenue: Rehabilitated 3,90D linear feet of Commonwealth <br />Avenue between Vermont Avenue to Brookhurst Road, Including intersection with <br />Brookhurst Road, <br />North Berkeley Avenue: Rehabilitated 1,630 linear feet of North Berkeley Avenue <br />between Harbor Boulevard and Valley View Drive. <br />Yorba Linda Boulevard: Rehabilitated 2,600 linear feet of Yorba Linda Boulevard <br />between Placentia Avenue and Bradford Avenue. <br />Sunny Crest Drive: Rehabilitated 3,160 linear feet of Sunny Crest Drive between <br />Valencia Mesa Drive and Valley View Drive. <br />Client Reference: <br />Year Completed: <br />Jose Medina, City of Fullerton <br />2013 -On-going <br />Phone: 714.738.6858 1303 W. Commonwealth Avenue, Fullerton, CA 92832 <br />25E-630 <br />
The URL can be used to link to this page
Your browser does not support the video tag.