Laserfiche WebLink
P pm r° 0 L ON-CALL ENGINEERING SERVICES 6,,, <br />RFP NO.: 17..083 <br />City of Santa Ana <br />Bus Stops <br />It is assumed that the bus line along Mile One Street will remain active. The bicycle buffer prohibits the buses <br />to pull into the curb closest to the sidewalk, therefore a bus platform is necessary adjacent to the outside <br />(lana #3) travel lane, Mark Thomas will provide a few proven designs for bus stop design along corridors with <br />Class IV bike lanes for consideration and will provide a recommendation on a case-by-case scenario. <br />Storm Drain Upgrades <br />Storm drain Improvements within this portion of Mile One Street will be per the City's Master Drainage Pian. <br />Mark Thomas will conduct a hydrology analysis to verify the location and sizes of the proposed Inlets and <br />hydraulic analysis and modeling to confirm the Master Plan's recommendations for main line improvemerits. <br />Water Quality Management <br />Mark Thomas will prepare a Water Quality Management Plan (WQMP) with specific BMPS to satisfy the <br />EIR requirements and the City's Low Impaot Developman# <br />requirements. Similar to those installed at other parkway <br />locations for similar projects, a tow maintenance and easily <br />implemented bloretention system, such as Fliterra, could <br />be installed. The unit cost of these systems includes the <br />requirements desired by the City of BMPs. <br />Utilities Coordination <br />Mark Thomas' approach to the utility coordination task will <br />Include the typical "ABC" process from Caltrans, where <br />major and minor risk Items are identified. We will take a <br />second step which is to be located those conflicting utilities <br />to a satisfactory level of confidence using a combination of FFPterraO Biorerentfon System <br />potholing and other locating strategies that may be more <br />cost efficient. This additional effort will reduce risks during construction and provide both the City and Mark <br />Thomas the information necessary to make informed decision during the design phase. <br />25E-629 <br />