My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P pm r° 0 L ON-CALL ENGINEERING SERVICES 6,,, <br />RFP NO.: 17..083 <br />City of Santa Ana <br />Bus Stops <br />It is assumed that the bus line along Mile One Street will remain active. The bicycle buffer prohibits the buses <br />to pull into the curb closest to the sidewalk, therefore a bus platform is necessary adjacent to the outside <br />(lana #3) travel lane, Mark Thomas will provide a few proven designs for bus stop design along corridors with <br />Class IV bike lanes for consideration and will provide a recommendation on a case-by-case scenario. <br />Storm Drain Upgrades <br />Storm drain Improvements within this portion of Mile One Street will be per the City's Master Drainage Pian. <br />Mark Thomas will conduct a hydrology analysis to verify the location and sizes of the proposed Inlets and <br />hydraulic analysis and modeling to confirm the Master Plan's recommendations for main line improvemerits. <br />Water Quality Management <br />Mark Thomas will prepare a Water Quality Management Plan (WQMP) with specific BMPS to satisfy the <br />EIR requirements and the City's Low Impaot Developman# <br />requirements. Similar to those installed at other parkway <br />locations for similar projects, a tow maintenance and easily <br />implemented bloretention system, such as Fliterra, could <br />be installed. The unit cost of these systems includes the <br />requirements desired by the City of BMPs. <br />Utilities Coordination <br />Mark Thomas' approach to the utility coordination task will <br />Include the typical "ABC" process from Caltrans, where <br />major and minor risk Items are identified. We will take a <br />second step which is to be located those conflicting utilities <br />to a satisfactory level of confidence using a combination of FFPterraO Biorerentfon System <br />potholing and other locating strategies that may be more <br />cost efficient. This additional effort will reduce risks during construction and provide both the City and Mark <br />Thomas the information necessary to make informed decision during the design phase. <br />25E-629 <br />
The URL can be used to link to this page
Your browser does not support the video tag.