Laserfiche WebLink
e <br />and has shown his commitment to getting projects done In a timely manner. <br />Professional Credentials <br />Bachelor of Science, Civil Engineering, Montane State University <br />Registered Professional Engineer in Arizoha.(4043308), California (9#75462), and North Carolina (#WD483) <br />American Society of.Civii Engineers, Member <br />Relevant Experience <br />• Santa Rose Road Widening Project, Camarillo, <br />CA a-- Project Engineer <br />• A. E. Wright Middle School Pedestrian Bridge., <br />Calabasas, CA -- Projeot Engineer <br />• Advanced Transportation Management and <br />information and Security System (ATMIS), Port <br />of Long Beach, CA — Project Engineer <br />• Agoura Road Widening Project (Complete <br />Streets), Agoura Hills, CA -- Project Engineer <br />• 11th Avenue Improvements (pan of the <br />Downtown SRT Stations project), San Diego, <br />CA — Project Engineer <br />• 17316 W. Sunset Blvd. Renovation Project (J. <br />Paul Getty), Pacific Palisades, CA --W Project <br />Engineer <br />• Interchange Improvements for 1.215 at Cactus <br />Avenue PSR, Moreno Valley, CA -W Project <br />Engineer <br />• Broadway Plaza Parking Study, Walnut Creek, <br />CA --- Project Engineer <br />• Calaveras Sidewalk Improvements, Mllpftas, <br />CA — Project Engineer <br />• SANDAG, Broadway Corridor/BRT Station <br />Engineering and Environmental Compliance <br />(CEQA), San Diego, CA — Project Engineer <br />KimleyA)Horn <br />• SANDAG, Final Design of the South Line Freight <br />Rail Improvements; San Diego, CA— Project <br />Engineer <br />• I-5/Genesee PRIED, PS&E and QQnmruCdon <br />PheseServices (CPS), San Diego, CA - <br />Project Engineer <br />• SANDAG/MTS Light Rail Transit (LRT) Renewal <br />Project - Blue Line Stations, San Diego, CA — <br />Project Engineer <br />• Graton Casino - Wilfred Avenue Off -Site <br />Improvements, Rohnert Park, CA —• Project <br />Engineer <br />• 1.215/Van Buren Blvd Interchange PA&ED and <br />PS8;E Phases, Riverside County, CA-- Project <br />Engineer <br />• City of Rocklin, Farron Street Pedestrian Bridge, <br />Rocklin, CA — Project Manager <br />• Lincoln Cn;Call Services, Lincoln, CA — Project <br />Engineer <br />• Los Angeles, Upper 2nd Street Bridge Design, <br />Los Angeles, CA — Project Engineer <br />• City of Elk Grove, Preliminary Engineering for <br />intennodal Rail Station, Elk Grove, CA -- <br />,Project Engineer <br />• City of Folsom, Johnny Cash Trail • Phase Two, <br />Folsom, CA — Project Engineer <br />25E-67 <br />