e
<br />and has shown his commitment to getting projects done In a timely manner.
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, Montane State University
<br />Registered Professional Engineer in Arizoha.(4043308), California (9#75462), and North Carolina (#WD483)
<br />American Society of.Civii Engineers, Member
<br />Relevant Experience
<br />• Santa Rose Road Widening Project, Camarillo,
<br />CA a-- Project Engineer
<br />• A. E. Wright Middle School Pedestrian Bridge.,
<br />Calabasas, CA -- Projeot Engineer
<br />• Advanced Transportation Management and
<br />information and Security System (ATMIS), Port
<br />of Long Beach, CA — Project Engineer
<br />• Agoura Road Widening Project (Complete
<br />Streets), Agoura Hills, CA -- Project Engineer
<br />• 11th Avenue Improvements (pan of the
<br />Downtown SRT Stations project), San Diego,
<br />CA — Project Engineer
<br />• 17316 W. Sunset Blvd. Renovation Project (J.
<br />Paul Getty), Pacific Palisades, CA --W Project
<br />Engineer
<br />• Interchange Improvements for 1.215 at Cactus
<br />Avenue PSR, Moreno Valley, CA -W Project
<br />Engineer
<br />• Broadway Plaza Parking Study, Walnut Creek,
<br />CA --- Project Engineer
<br />• Calaveras Sidewalk Improvements, Mllpftas,
<br />CA — Project Engineer
<br />• SANDAG, Broadway Corridor/BRT Station
<br />Engineering and Environmental Compliance
<br />(CEQA), San Diego, CA — Project Engineer
<br />KimleyA)Horn
<br />• SANDAG, Final Design of the South Line Freight
<br />Rail Improvements; San Diego, CA— Project
<br />Engineer
<br />• I-5/Genesee PRIED, PS&E and QQnmruCdon
<br />PheseServices (CPS), San Diego, CA -
<br />Project Engineer
<br />• SANDAG/MTS Light Rail Transit (LRT) Renewal
<br />Project - Blue Line Stations, San Diego, CA —
<br />Project Engineer
<br />• Graton Casino - Wilfred Avenue Off -Site
<br />Improvements, Rohnert Park, CA —• Project
<br />Engineer
<br />• 1.215/Van Buren Blvd Interchange PA&ED and
<br />PS8;E Phases, Riverside County, CA-- Project
<br />Engineer
<br />• City of Rocklin, Farron Street Pedestrian Bridge,
<br />Rocklin, CA — Project Manager
<br />• Lincoln Cn;Call Services, Lincoln, CA — Project
<br />Engineer
<br />• Los Angeles, Upper 2nd Street Bridge Design,
<br />Los Angeles, CA — Project Engineer
<br />• City of Elk Grove, Preliminary Engineering for
<br />intennodal Rail Station, Elk Grove, CA --
<br />,Project Engineer
<br />• City of Folsom, Johnny Cash Trail • Phase Two,
<br />Folsom, CA — Project Engineer
<br />25E-67
<br />
|