Chris Isere P.E., .EEQ AP
<br />STRUCTURAL SERVICES – TASK MANAGER
<br />Chris has nearly 16 years of experience on avariety of projects, including building
<br />structural and pavement assessments, parking facility design and rapalr, vehicular
<br />and pedestrian bridge design and reppirculvert design, roadwaylstreatscape
<br />Improvements, and. other ancillary trenspgrtation support strtictures, Chris' responsibilities have Included
<br />planning, atruatura! design, produotlpn Of,plans and spaaiflaatlons, and constrtiet)on phase servipes for a
<br />Wilde range o4 prolact types, His tlesign, and assessment exporience encompasses structures of
<br />xaiMoroed concrete, prao8. t/ prostressed concrete, post-tansfoned ooncreta, and structural steel for a
<br />wide variety of project and client typos, Chris also recognizes t o corralption betwaan sustainability and
<br />practicalityand applies this to every project,
<br />Professional Credentjais
<br />Master of and Bachelor of Science, Civil Engineeeing, Clemson University
<br />Professional Engineer In CA 080017), SC (#280$$)' NO (tf3.6111), TN (#000278)LEER AP (Leadership In Energy and Environmental Oesign),
<br />American Society of Civil Engineers, Member'
<br />international Parking Institute, Advisory Counell, Sustaihabiiky Committee, Consultants Committee
<br />Careen Parking Council, Credentfaling Committee
<br />Relevant Experience
<br />et Bayside District, 3rd Street Promenade
<br />Downtown Parking Study, Santa Monica, CA--
<br />ProjectEnglneer
<br />1 Firestone Boulevard Improvements, Buena
<br />Park, CA-- Project Manager
<br />/ City of Anaheim, Gene Atttry Way Improvements
<br />(t•$ to State College Blvd.) & State College Blvd,
<br />Improvements (West Side), Anatieifn, CA
<br />J Pavement Rehabilitation (Task Order Under On-
<br />Call)„Pomona, CA -- Project Manager
<br />Traffic Flaw Improvement Study of Artesia
<br />Boulevard from 1-6 to Beach Boulevard, Buena
<br />Park, CA -- Project Manager
<br />,d C Gold Line Design.Build Wayside Energy
<br />Storage Substructure (WEBS) Project, Los
<br />Angetes, CA — Project Engineer
<br />.1 Camprahonslve Parking Analysis, Santa Ana,
<br />CA — Project Engineer
<br />• California State University -Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA— Project Manager
<br />/ City of Buena Park, SR 91/13each Blvd WS Exit
<br />Ramp, Buena Park, CA — Project Manager
<br />/ Patton Street Pocket Park (Parks for People),
<br />Los Angeles, CA— Project Engineer
<br />,d CSU Long Beach, East Campus Road - Safety
<br />Improvements; Long Beach, CA — QC/QA
<br />Reviewer
<br />4 Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA --
<br />Project manager
<br />At East Coast Highway Signal Rehab Design,
<br />Newport Beach, CA--- Project Director
<br />• Valteyimnsportatlon Authority PARCS, Silicon
<br />Valley, CA— Project Engineer
<br />J Santa Fe Christian School Parking Deck, Solana
<br />Beach, CA --Project Engineor
<br />• Serryessa Station Parking Structure, San Jose,
<br />CA --Project Engineer
<br />1 California State University, Sacramento Parking
<br />Structure Condition Assegsments, Sacramento,
<br />CA — Project Engineer
<br />• Lower Pacific Avenue Parking Study, Santa
<br />Cruz, CA -- Project Engineer
<br />• Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, Milpitas, CA-- Project
<br />Engineer
<br />1 Richmond Transit Village Parking Garage
<br />(BART), Richmond, CA-- Project Engineer
<br />Kimley)))Horn
<br />25E-68
<br />
|