01
<br />*"""'TWINING
<br />Paul Soltis, PE, GE, Senior Geotechnical Engineer
<br />Paul Soltis, 109,0E, 'brings more than 24 years of technical expertise to Twining. His experience
<br />Includes geoteohnical Investigations andanalyses relative to roads, bridges, highways; and other
<br />California infrastructure projects. His focus is on Interaction with the design team during
<br />development of construotion documents to achieve the most appropriate foundation type and most
<br />efficient site prsparatlan.teohniquas; Paull has extensive on�psll contract management experience
<br />and the proven ability to simultaneously maintain and menage multiple projects, pmol is
<br />responsible fDr Ohs teohnlW ovarslght of the firm's gaotechnioal projects and management of the
<br />firm's gsoteohnioal personnel,
<br />overview
<br />In the lndustry since 1092
<br />Joined Twining in 2006
<br />Current Lioness Meld
<br />• Professional Engineer, 0iu11, CA, 56140
<br />• Regletered Geotechnical Engineer, CA, GE 2606
<br />Education
<br />M6, Gootachnical Engineerfng, University of Colorado,.` Boulder, CO
<br />BS, Civil Engineering, California Polytechnic State University, San Luls Obispo, GA
<br />Project Experience Summaries
<br />City of tong Beach, Studebaker Road Pavement Evaluation Serving as Geotechnical
<br />Engineer, Paul provided engineering oversight to ensure the .City's expectations were met on this
<br />0.5 -mile stretch of Studebaker Road in the City of Long Beach. The surface condition assessment
<br />was performed following the Caltrans Flexible Pavement Rehabilitation Manual. Boring and
<br />coring were performed to investigate the subsurface condition of the road. Based on collected
<br />information, different rehabilitation strategies were calculated and recommended to the City of
<br />Long Beach, including Cold In -Place Recycled Asphalt Concrete Pavement and Cement
<br />Stabilized Pulverized Base.
<br />LADPW, Dol Amo Boulevard improvements This project consisted of extracting asphalt
<br />concrete cores and developing a cold recycling mix design using the collected materials. The
<br />thickness of the existing asphalt concrete and base was recorded. The extracted materials were
<br />returned to Twining's Long Beach laboratory for evaluation In order to develop a cold recycling
<br />mix.dealgn. In addition to developing the mix design, Twining served as the quality assurance
<br />testing laboratory during construction, Paul provided.geotochnicai oversight throughout this
<br />project, assisting with the Investigation and identification of soft subgrade soils that were
<br />discovered during construction.
<br />• County of San Bernardino, On -Call Geotochnical Engineering Services Paul Is currently the
<br />project manager for this contract and provides monitoring, sampling, testing, reporting and
<br />contract compliance enforcement for construction concrete, quality control compliance of steel,
<br />reinforcing steel, wood, roofing material, brick, masonry, material quality control of asphalt and
<br />concrete paving and road construction materials, compaction testing, R -value, aggregate
<br />analysis, sieve analysis, gradation classification, moisture content, and shear analysis.
<br />25E-71
<br />Y
<br />
|