Laserfiche WebLink
Water Improvement Design and *Coordination. Our utillti.dasign team along with our guboonsult4rit, Hazen and <br />Sawyer have. successfully completed water Infrastructure projects for various agencies In Southern California. These <br />pPolects consist Of water main replacement, realignment, upsizing and capacity Increase, master plarloing, existing <br />system Mluatli)n and maintenance arid operational support, Akhough each project Is unique, the majority otchollonglog <br />Utility PM]Qds we face Oro In developed areas where existing Utility facilities are located within tho proposed project area <br />and any Improvemon(will generally effector be affected by the location of 1haoxisting 0011tyfliolfity, k1mley-Horil believes <br />In drawing all utility lines and features true to size In our Mons to aid In Identifying conflicts early In the deal nphqse.We <br />.9 <br />will also pothole potential conflict locations when budgets allow, which gives a bettor understanding of the locations of <br />the existing lines, and provide extensive o0ordinatloh.with the Vatlous Utility companies. We also use M modeling of <br />ulffIlles to, Identify potential conflicts In,early stages oftlesign,Thlableithod too helped us to avoid discriopanclea between <br />consitruotion documonts�and actual field conditions that resulted in cost effective and fimoly manner oncullon of projects, <br />V <br />Sanitary $ewer Dirsigh, Sowers will be designed based onDranggi COUNY 6601tetUff District and City of Santa Ana!s <br />requirements, All design criteria will be reviewed versus the previous requirements Including sower pipe alking, modeling <br />and arialyals, sewer line:411i;inniont and depth, minfrourn slopes, 01pa materials, bedding and tronchilesIgn, andraquIred <br />. <br />manholes. Kimley-Hom will provide modeling based on Assembled Inficrovation based on the existing system,and <br />incorporating proposedoondillop If requested by the, Oily, Results of the modeling and recommendations by Kimiloy-Hoin <br />for project solutions will then be submitted to the City for review and approval. <br />Well Rehabilitation Design, A combination of three factors can cause water production decline. The first is a regional <br />decline In water elevations that shift the %tatld' water level downward. The second Is a decline In water levels In the <br />local aclulfor caused by continuous pumping. The third Is a decline In SpOicIfic capacity caused by a plugged filter pack <br />or well screen. The re0ional.doollne In water levels Is not controllable and groundwater levels will recover through <br />natural recharge, The reduction In specific capacity requires corrective motion In the form of toot cause evaluation, well <br />redevelopment, and possibly modification to pump location and, flow rate. <br />The decline In specific capacity could be a -result of a reduction of pormeablilty near the well screen. This type of <br />permeability reduction Is often the result of biological fouling, cementation, or the intrusion of foe -grained aquifer sand <br />intotho gravel pack surrounding the well casing. Well videos could confirm this.: Migration of fine-grained aquifer sand <br />could be a root cause of the rapid decline, In specific capacity, The result Of this Is that water velocity during puraping Is <br />much higher In those sections of screen that produce the most water. During pumping, small sand particles mobilize and <br />migrate through the well filter pack and wedge Into the pore space, reducing permeability In the filter pack, <br />Mitigation of this Issue would include careful well development to removia the sand and resettle the filter pack and <br />modification of pumping operations to reduce sharp changes In water velocity that mobilize fine-grained aquifer sand. <br />Prior to redevelopment It Is recommended to review of the factors that can cause this reduction In specific capacity. <br />The review would include assessment of biological and cementation plugging and review the original, well construction <br />documents Including the sleve analysis performed to size the filter pack and the daily construction tif available), As part of <br />developing a mitigation approach, spinner logs may be recommended to verify production zones. <br />Environmental Studies, Our environmental services team provides �omplata natural resource regulatory compliance <br />services for pubileworks projects, Our environmental professionals have provided services for a wide variety of projects, <br />including roadway, transit, transportation planning, green streets, complete streets, land development, storm draln, <br />and water resources, They are well Mad In all aspects of the development process from Phase I Environmental <br />SIteAssessmonts to California Environmental Quality Act (CEQA) and National Environmental PollcyAct (NEPA) <br />Kimley>Worn a TROO77025,171 city of Santa Am <br />25E-23 <br />