documentation and resource aganoypormilting, They are experienced, In taking a project from conception to Inal
<br />b0lId-oqt,.Rnd provide environmental compliance service's In support of design and construction ongInpertrig, Our
<br />team's environmental services Include: CEOAINEPA documentation, groundwater protection, environmental audits,
<br />environmental compliance, natural resource Investigations, stprmwater management, and more,
<br />Storm Drain Design and Drainage Analysis, KlmleyHorn's drainage engineering servioes-Include the designof
<br />canals, doterdlon begins, culvert crossings, water control structures, diversion structures, pump Stations, and more,
<br />Our engineers havebeen called upon by numaroug public agencies and major agricultural, Industrial, and residential
<br />developers to conduct preliminary Studies and drainage consultation, prepare *rMWater Management plans, perform
<br />watershed and ftoodplaln analysis, prepare Mean dralit master plans, and coordiriataparmit applications on their behalf,
<br />Structural Analysis. ftley-Hotn's structural engineering team provides structural design And analysis for a.range of
<br />major retaining structures, parking struoturesi roadway bridges, pedestrIan.brIdoes, to minor footings and foundations for
<br />traffic Signals, roadwA n a ni lenoe working
<br />ysIgns, end,storm dralm Structures, Our structural enil sors. h ve axis lye oxpe(
<br />with public ggorrolosond are familiar with routine plan check processes for multiple agencies.
<br />Conotrucrtion and Bid Supporti Our loam Is equippadvith the latest construction mortogement systems and
<br />applications ovallotile In the Industry. These tools are scalable and customizable to fit the 01ty's project needs and budget,
<br />and to Integrate with the City's existing standards, From simple, t1mo-tested tornis and proceduregi to advanced
<br />constaiction management and w&bosed systems, our team will deliver small and large projects on-timeand
<br />under budget while keeping the City up to date on a "real-time" basis. In addition to our design team's experience
<br />with design relevant topics, our construction phase personnel can attend lore-coristruction conferences and regular project
<br />meetings, provide review and approval of submittals, as well as other activities. nocassarylo achieve well,coordinated
<br />construction projects of proposed Improvements.
<br />Approech to Ybur.On-Ca//
<br />Through our five decades of experience working with on -coil clients, we have learned valuablelassons that have helped
<br />us create a unique approach to meeting out clients'needs, We, understand the urgency associated with federally funded,
<br />time sensitive, or public safety projects, and we are equipped to allocate sufficient resources to meet deadlines and the
<br />City's capital Improvement piogram schedule. Our approach to your on-Qall tasks entails the following:
<br />Project Managoment—SIngle Point of Contort; We have widespread expertise, and experience In all facets of
<br />municipal projects. Klmley-Horn's project manager, Darren Adrian, P.E., will serve as the primary point of contact, and
<br />will manage the team through the length of the contract. He hag over 27 years of municipal engineering experience and
<br />managed Several projects with various cities In California, His experience includes design, planning, arid construction of
<br />major roadways, transportation facilities, streetscape Improvements, and utilities and Is knowledgeable of federal, State,
<br />county, and nivrilopall regulations. Darren will oversee and revlaw the engineering activities Including engineering design,
<br />studies, Investigations, peer review, surveying, suboonsultont review, and other related aciNflifes. He Will be available to
<br />City staff for a timely response to service requesta, Including questions about budgets, Invoices, and schedules.
<br />Before a project starts, Darren will conduct a project groping meeting with all respective team members to brainstorm
<br />the project Issues, Our team will conduct a project Initiation meeting with the appropriate team members to coordinate
<br />the project plan Including milestones, dollverables, and current project events, Project coordination meetings will be
<br />scheduled based on the project duration to make sure the project remains on track.
<br />City of Santa Ana I TR0077=17
<br />Kimlley* Horn
<br />25E-24
<br />
|