Laserfiche WebLink
documentation and resource aganoypormilting, They are experienced, In taking a project from conception to Inal <br />b0lId-oqt,.Rnd provide environmental compliance service's In support of design and construction ongInpertrig, Our <br />team's environmental services Include: CEOAINEPA documentation, groundwater protection, environmental audits, <br />environmental compliance, natural resource Investigations, stprmwater management, and more, <br />Storm Drain Design and Drainage Analysis, KlmleyHorn's drainage engineering servioes-Include the designof <br />canals, doterdlon begins, culvert crossings, water control structures, diversion structures, pump Stations, and more, <br />Our engineers havebeen called upon by numaroug public agencies and major agricultural, Industrial, and residential <br />developers to conduct preliminary Studies and drainage consultation, prepare *rMWater Management plans, perform <br />watershed and ftoodplaln analysis, prepare Mean dralit master plans, and coordiriataparmit applications on their behalf, <br />Structural Analysis. ftley-Hotn's structural engineering team provides structural design And analysis for a.range of <br />major retaining structures, parking struoturesi roadway bridges, pedestrIan.brIdoes, to minor footings and foundations for <br />traffic Signals, roadwA n a ni lenoe working <br />ysIgns, end,storm dralm Structures, Our structural enil sors. h ve axis lye oxpe( <br />with public ggorrolosond are familiar with routine plan check processes for multiple agencies. <br />Conotrucrtion and Bid Supporti Our loam Is equippadvith the latest construction mortogement systems and <br />applications ovallotile In the Industry. These tools are scalable and customizable to fit the 01ty's project needs and budget, <br />and to Integrate with the City's existing standards, From simple, t1mo-tested tornis and proceduregi to advanced <br />constaiction management and w&bosed systems, our team will deliver small and large projects on-timeand <br />under budget while keeping the City up to date on a "real-time" basis. In addition to our design team's experience <br />with design relevant topics, our construction phase personnel can attend lore-coristruction conferences and regular project <br />meetings, provide review and approval of submittals, as well as other activities. nocassarylo achieve well,coordinated <br />construction projects of proposed Improvements. <br />Approech to Ybur.On-Ca// <br />Through our five decades of experience working with on -coil clients, we have learned valuablelassons that have helped <br />us create a unique approach to meeting out clients'needs, We, understand the urgency associated with federally funded, <br />time sensitive, or public safety projects, and we are equipped to allocate sufficient resources to meet deadlines and the <br />City's capital Improvement piogram schedule. Our approach to your on-Qall tasks entails the following: <br />Project Managoment—SIngle Point of Contort; We have widespread expertise, and experience In all facets of <br />municipal projects. Klmley-Horn's project manager, Darren Adrian, P.E., will serve as the primary point of contact, and <br />will manage the team through the length of the contract. He hag over 27 years of municipal engineering experience and <br />managed Several projects with various cities In California, His experience includes design, planning, arid construction of <br />major roadways, transportation facilities, streetscape Improvements, and utilities and Is knowledgeable of federal, State, <br />county, and nivrilopall regulations. Darren will oversee and revlaw the engineering activities Including engineering design, <br />studies, Investigations, peer review, surveying, suboonsultont review, and other related aciNflifes. He Will be available to <br />City staff for a timely response to service requesta, Including questions about budgets, Invoices, and schedules. <br />Before a project starts, Darren will conduct a project groping meeting with all respective team members to brainstorm <br />the project Issues, Our team will conduct a project Initiation meeting with the appropriate team members to coordinate <br />the project plan Including milestones, dollverables, and current project events, Project coordination meetings will be <br />scheduled based on the project duration to make sure the project remains on track. <br />City of Santa Ana I TR0077=17 <br />Kimlley* Horn <br />25E-24 <br />