Laserfiche WebLink
Quality Control/Qualfty Assurance, (QCIQA): Quality projects don't happen by accident. Klmilay-Horn has been firmly <br />committed to quality Since the firm began over 60 years ago to thal end, Klmloy-Hom lies developed a QC/QA manual <br />that every project manager Is required to know and use, The objective of our QCIQA program Is to produce dslIverables <br />that conformto your scope and mlfllmlzg the number of orroirs and omissions. Our Q01QA program It based on, the <br />following philosophy: <br />OuAllity Is achieved by adequate planning, coordination, euporvIS10a, and technical direction; proper definition of the <br />job requirements and pr000duree; understanding the scope of services; and the use of appropriately Allied personnel <br />parlorming worklunctiono carefully, Individuals who see not directly responsible for performInd the liftlal effoft aswre <br />quality thrqqghthe careful oversight of work activities. <br />Quality is controlled by assigning a manager to evaluate elf workond pr000duires followed while providing the services, <br />Quality Is verified through Independent reviews by a quollflod otAff m. ember of the processes, procedures,, <br />documentation, sgper&lon, technical direction, and staffing associated with the project development. <br />Quality Is assured through a carefully designed system of cross checks and independent reviews. <br />rJmloy. I Horn is fortunate to have the staff depth and resources to provide. a QC1QA reviewbyzenfor-16vel professionals <br />whosrofarifillowlth the,type of services provided, yet not worldogidirecdy on the project. Out project Workpions, <br />schedules, and budgets aradeveloped with 00 18$k$, 10110atDries, and hours integrated at the beginning of a.project. This <br />systern allows adequate time for thorough W0A.re4lows throughout the life of a project. <br />City of $onto Ana I TROC77OP5.17 11 KidepMorn <br />25E-26 <br />