OC Streetcar Pear Review, Orange County, CA (2016 — Ongoling) <br />Klmloy�Horn Is providing peer review of the strooloartlesign for various technical areas such as track alignment, grade <br />crossings, stations, sIgnalization, Overhead Catonary System,.Traotion Power Sub Station, constructalaillty, basic <br />operations, and overall.coordination of the proposed Corrldor with bicycles, pedestrians, buns, and other Vehicles, <br />The OC Streetcar will Increase transportation options and provIde greater access to a 4.15-mlle route along Santa Ana <br />Boulevard, 4th Street, and the Pacific Electric rlght�of-way to Harbor Boulevard In Gordon. Grove. <br />Client Referarloo., My of Santa Ana, Jason Gabdel, Prb?q1pa1C1V# Eng1noor, 7141047-5604 <br />OR -Call, General Engineering Services, Malibu, CA (2012 — Ongoing) <br />Klmley-Horn woo oylglnplly sojected to provide on-oall traff! I o engineering services to the City of. mallbul 6 2012, but the <br />oontractwas lately expanded to include Civil Engineedrig Services, due to bigh quality service provided by Klmloy-Honn, <br />As atenslon to the City staff, Klmley-Horn staff porlorms the following on a rogularbasis: <br />, Performing fovlevt of develophioht project reports, Preparing construction plans, specifications, and <br />grading, vIllilly and construction plans estimates <br />, Conducting opgIneoring and traffic surveys Researching ofoillIfies, and other records <br />. FeasibIlItylooncoptual studles and reports and Collecting and analyzing traffic data <br />recommendations for preliminary, fine[ and construction PartlepotIn g to meeting . a with City stall associated with <br />design studies various development and Improvement project's <br />. Utilizing applicable engineering disciplines <br />Client Reference: City of Mali�u, Rob Ouboux, ASsIstant PublIc Works Moctor, 310,450,2489 x339 <br />City of Pomona On -Call, Pomona, CA (2011 — 2013) <br />f(Imley-Hom was selected through an on -call agreement with the City to provide street rehabilitation services for varlotis <br />strasts within the City. The general scope of work was to evaluate the suitable pavement rehabilitation methodologies <br />and select the methods that were most sultable for the Uty's budget, this project also Included Isolated concrete <br />Improvements Including, sidewalk, curb and gutter, cross gutters, curb ramps, bus pads, and medians. Some of the <br />pavement rehabilitation methods that were evaluated were cold ln�place recyollng, conventional asphalt removal and <br />replacement, and cold mill and overlay, Each method was evaluated with conventional asphalt and rubberized asphalt. <br />Client Reference: 011y,of Pornono, Roza Zolghadr, Consultant Project Manager, 909,620.2238 <br />On -Call Pavement Rehabilitatlon/Utility Design, Fontana, CA (2008 — Ongoing) <br />Klmley-Horn has completed pavement rohebllltatloq design under several task orders: <br />CatawbeAvenua, SloverAvenue, HarnlockAvenua, Beeoh)lVanue, and PopularAvenux Improvements entsIled <br />pavernon(replacement and overlays paroeoteohnical recommendations; miscellaneous concrete Improvements where <br />adjacent Improvements were affected; and re0onstructionlresetting of offected pylvate property Improvements such 8$ f0h068, <br />walls, curb drains, and meters. Various pavement nahabilitation optlona were Investigated; conventional asphalt concrete <br />replacement was recommended along one -street and full -depth asphalt recycling --- <br />TDAR) along the others. The construptlon cost savings by going with IFOAR were <br />approximately 40 percent In comparison to conventional remove -and -replace <br />options. Coordination was required to obtain permits for work adjacent to two <br />UPRR at -grade rall crossings and for work associated with affected utilities, <br />KlmloyMorn also assisted the City In applying for Proposition I B funds through <br />the State and Local Partnership Program (SLPP). <br />City of Santa Ana I 7R0077025. 17 13 Kidely*> Horn <br />25E-28 <br />