OC Streetcar Pear Review, Orange County, CA (2016 — Ongoling)
<br />Klmloy�Horn Is providing peer review of the strooloartlesign for various technical areas such as track alignment, grade
<br />crossings, stations, sIgnalization, Overhead Catonary System,.Traotion Power Sub Station, constructalaillty, basic
<br />operations, and overall.coordination of the proposed Corrldor with bicycles, pedestrians, buns, and other Vehicles,
<br />The OC Streetcar will Increase transportation options and provIde greater access to a 4.15-mlle route along Santa Ana
<br />Boulevard, 4th Street, and the Pacific Electric rlght�of-way to Harbor Boulevard In Gordon. Grove.
<br />Client Referarloo., My of Santa Ana, Jason Gabdel, Prb?q1pa1C1V# Eng1noor, 7141047-5604
<br />OR -Call, General Engineering Services, Malibu, CA (2012 — Ongoing)
<br />Klmley-Horn woo oylglnplly sojected to provide on-oall traff! I o engineering services to the City of. mallbul 6 2012, but the
<br />oontractwas lately expanded to include Civil Engineedrig Services, due to bigh quality service provided by Klmloy-Honn,
<br />As atenslon to the City staff, Klmley-Horn staff porlorms the following on a rogularbasis:
<br />, Performing fovlevt of develophioht project reports, Preparing construction plans, specifications, and
<br />grading, vIllilly and construction plans estimates
<br />, Conducting opgIneoring and traffic surveys Researching ofoillIfies, and other records
<br />. FeasibIlItylooncoptual studles and reports and Collecting and analyzing traffic data
<br />recommendations for preliminary, fine[ and construction PartlepotIn g to meeting . a with City stall associated with
<br />design studies various development and Improvement project's
<br />. Utilizing applicable engineering disciplines
<br />Client Reference: City of Mali�u, Rob Ouboux, ASsIstant PublIc Works Moctor, 310,450,2489 x339
<br />City of Pomona On -Call, Pomona, CA (2011 — 2013)
<br />f(Imley-Hom was selected through an on -call agreement with the City to provide street rehabilitation services for varlotis
<br />strasts within the City. The general scope of work was to evaluate the suitable pavement rehabilitation methodologies
<br />and select the methods that were most sultable for the Uty's budget, this project also Included Isolated concrete
<br />Improvements Including, sidewalk, curb and gutter, cross gutters, curb ramps, bus pads, and medians. Some of the
<br />pavement rehabilitation methods that were evaluated were cold ln�place recyollng, conventional asphalt removal and
<br />replacement, and cold mill and overlay, Each method was evaluated with conventional asphalt and rubberized asphalt.
<br />Client Reference: 011y,of Pornono, Roza Zolghadr, Consultant Project Manager, 909,620.2238
<br />On -Call Pavement Rehabilitatlon/Utility Design, Fontana, CA (2008 — Ongoing)
<br />Klmley-Horn has completed pavement rohebllltatloq design under several task orders:
<br />CatawbeAvenua, SloverAvenue, HarnlockAvenua, Beeoh)lVanue, and PopularAvenux Improvements entsIled
<br />pavernon(replacement and overlays paroeoteohnical recommendations; miscellaneous concrete Improvements where
<br />adjacent Improvements were affected; and re0onstructionlresetting of offected pylvate property Improvements such 8$ f0h068,
<br />walls, curb drains, and meters. Various pavement nahabilitation optlona were Investigated; conventional asphalt concrete
<br />replacement was recommended along one -street and full -depth asphalt recycling ---
<br />TDAR) along the others. The construptlon cost savings by going with IFOAR were
<br />approximately 40 percent In comparison to conventional remove -and -replace
<br />options. Coordination was required to obtain permits for work adjacent to two
<br />UPRR at -grade rall crossings and for work associated with affected utilities,
<br />KlmloyMorn also assisted the City In applying for Proposition I B funds through
<br />the State and Local Partnership Program (SLPP).
<br />City of Santa Ana I 7R0077025. 17 13 Kidely*> Horn
<br />25E-28
<br />
|