CDBG ONARAMPavorrionfRohobliltaflon: The took Included a total of 42stroots, and bad strict budget, funditigand
<br />scheduling Components, The City needed a.00nsOltant who could.onalyze, several ofternotlyb pavement rehabilltallon
<br />strategies under a limited construction budget,while still meeting the required prolootgufdollres to obtain funding,
<br />Improvements entailed g0rid mod overlay of a." sirooto In both bk! packages, with thatiso of an Asphalt Rubber and
<br />Aggregate Membrane (ARAM) Intarlayer, with localized areas of fuill-depth remove and replace, Klmley-Horn assisted the
<br />City to moot requirements for a grant from the Department of Resources Reqyollrig and Recovery (Col Recycle) and the
<br />Community Development Block Orant (ONG) federal funding program, Klmley-Hom's knowledge of now and Innovative
<br />pavement rehabilitation strateoles has helped the City UtIlIzeseopled materials and In-placg recycling methods, which
<br />has brought the City sooral funding opporturilfies and millions of dollars In construction cost savings.
<br />Client RoffrraftM Cfty otAb0no, Keith 10wer, Public Works kaftogoi;, 909.364,6644
<br />West Grove Valley Pipelines, Riverview Pipol'Iniss, Santa Ana, CA (Hazen and Sawyer)
<br />Two projects with the City of Santa Are included 0 total of over 17,000 Linear Fast of waterpipollae design ranging In
<br />elze from Nich.to 12-Inch diameter. The City Is actively replacing aging and undersized water maln-, throughout their
<br />distriblution system. The West Grove Valley project loolodod 0,600 Linear Foot of pipeline replacement design, The
<br />Riverviowpmloof Included 7,700 Linear feet of pipeline replacemont dosigrii
<br />01 Not Reforol c o: City of Santa An a, Publia WAs Agency, A emando Fonnandez, Project Manager, 714.64 7,5680
<br />Well 29 improvements Alternatives Analysis, Santa Ana, CA (Hazen and Sawyer)
<br />The City of Santa Ana owns and operates Well 29, located at the southeast comer of Flower Street add First Street,
<br />adjacent to City Owned tennis Courts. Wall 29 Pumps directlyto an existing 8 MG reservoir. The existing wall site Includes
<br />the well head end. discharge, piping assembly� control equipment, a chlorination systern In a building, and an SCE
<br />transformer, An.alterngtIves; analysis was Conducted to recommend, upgrades at the site Including site Improvements,
<br />structural, moohoolcol, and electrical upgrades. Highlights of the study Include developing three alternatives for the
<br />Improved oftei providing 3D renderings for each site alternative, and developing a preliminary opinion of probable
<br />cost for the design and construction of each alternative discussed. The City Is moving forward with Implementing the
<br />recommended alternative from.thls analysis,
<br />Client Reference: City of Santa Ana, Public Works Agency,. Water Resources Division, Brian Igo, Assistant Engineer,
<br />714,647.3385
<br />References
<br />We have provided client references In the previous section and below. We Invite you to contact these recent clients and
<br />ask thorn about our work history, quality of service, and whether they would again select us for similar services.
<br />Mr, Carlos Castellanos, City Engineer, City of Anaheim
<br />TEL: 714.765,5176 (On -Call Planning and Engineering projects)
<br />Mr. Keith Kramer, Public Works Manager. City of Fontana
<br />TEL: 909,360.0044 (On -Call Pavement RebabilitationfUtIlity Dosigm Projects)
<br />Mr. Jason Lee, Project Manager, Orange County Transportation Agency
<br />TEL: 714,580,6282 (On -Call Transportation Engineering projects)
<br />Kimley)))Horn 14 TRO07702A 171 City of $onto Ana