Laserfiche WebLink
Task 8., Street Improvement Plans (Option B) <br />il�'Is . ........... —, ......... *** .......... * .............. * ............... * ....... — ............ .................... <br />, y-Hom will develop a street Improvement p!on for the construction qf roadway Improvements. The plans will show <br />horizontal and vertical design InIaTmaton, Roadway plans willbo prepared at o2scato of 1" = 2Y horlzontit[ond.1" r- 4' <br />vertical for profiles. We will use the sorveyIng from Task 4 for base mapping, Vertical design information for construction of <br />now medians and curbs will be Indicated on the plans with profiles, Details end typical sections will be added as needed. <br />We Wit prepare details for Items that deviate from published tilaIndards, <br />Defivambleg: 30%, 60 %, and r4n at Plans, electronic files In Mlomstation V81 and PV F (final plans will be sealed and <br />sfq nodl, an d to sponses to pro vio us ro vie W com m on ts from the My. <br />.T�sk 9,1 �y r <br />,�!�.Modqfing to Conne,o!,.Wel,I.P��,�to Wate :�K�tem, (Option A) <br />........... ......... ....... ;� .............. I � ...... i ......... ; .... I-- ... ...... <br />A hydraulic modeling analysis will he conducted to anal , yza the changed operating conditions fMrn the existing direct <br />dtioltarpto a r"ervolr, to A direct connfttlon to the Cl1j's distribution system. A how system curve will be developed <br />and analyzed with the existing well pumpcurve to determine the new operating oonditions of the pump, along with. any <br />Improvements necessary for the now connection point, The mcd[ol will also, be used to analyze Impacts to other system <br />feclilles within the City's distribution sptem, and recommend a revised operations and Centel strategy, <br />Defiverobles: Draft water systom modellng report, Motivator system modollng report, <br />Task 10: Water Improvement <br />'�l 4�'rh ... will ... d`e'v-e'Jo"p ... a *w" f o r re Ilabli Ratio n of the exist ng watt r wel I a nd pro posed wate r <br />mains construction, The plans will, show horizontal and vertical design Informotion. Plans will be prepared at a scale <br />of V a 20'horizontal and V P- 4'varllcol for profiles. We will use the surveying from Task 4 for base mapping, Vertical <br />design Information for water hiah wiltshow proposed water moln,proffia and will Identify,potentl6toonflicts with existing <br />underground Willies. Details and typical sections will be added as needed, We will prepare details for items that deviate <br />from published standards, <br />Dallyorables., Mo, 6W6, and Final Plans, efectronic files In Wrostallon V81 and POP ffinat plans will be sealed and <br />signed), and responses to previous review comments from the City, <br />Task 11: Signing and Striping Plans (Options A and 8) <br />�*O-il i 'p-r'e'p-a*r'e ... sirip, I'n*g'a'n-d- s-I'g,n-i'n, a—s' b"a, ie—o'f-1 "'r, ... 46 '-f'o,r"t'h"a- p-r'o"p' o-s*e-d- Im'-p'r'o-v' ... w* ft-h' lht-h'e-fim- It's' 'o-f-t'h'e' ......... <br />project. Striping and signing plans will comply with the CIty's.steridards, Caltrans, and the California MUTCD, Flashing <br />beacon Installation and parking motor details, N required, will be shown on the striping and signing plans, <br />Vollyerobtes., 30%, 60916, and Final Plans, electronic files In Microstation V81 and PDF (final plans will be sealed and <br />signo, and responses to previous review comments from the City. <br />Task 12: Landscape and hrigation Plans (Option B) <br />i��'K"Im- I o-y'l,H"o, m* ... t'e'a-m' ... w'l' I'l p"r9-p'a-r'e- I'a, *a'n-d' "I rr'1*g'&-t'1'o*r *p' ia"n's-fo-r-I'h e—p-r*o'p-o' 'a' e-d ... n 'e, d-I *a' ns ... ah'd, ... p'a'r'k-w-a'y-s' ........... <br />project limits. These plans will be consistent with the City's Standards and General Plan, the City's $cenlc Corridor <br />Elements, the City's Urban Design Elements, and Callfornia's Water Efficient Landscape Ordinance. We will consider City <br />maintenance when developing the design. Landscape and Irrigation plans will be prepared at a scale of I " = Whorizontal. <br />Dellverables, 30%, 60%, and Final Plans, oleattorild files In MIcrostation V81 and POP (final plane will be sealed and <br />signed), and responses to Previous review comments from the City. <br />City otSentmAnit I M0077026,17 17 Kimley)))Horn <br />25E-32 <br />