My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
FULL PACKET_2018-06-19 (INCLUDES 25E EXHIBITS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 11:35:42 AM
Creation date
6/18/2018 5:17:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
6/19/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2348
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 13: Storm Drainflaft TOTP� <br />............ ..................... .............. <br />�W�iii a a b�4�0 proposed cgtph basins and l4leffil Connection$ to the eXl$tlng main lines, <br />Catch basin sizing, Inlet dimensions, and laterals pipe size$ wlIf be determined as part of Task 4. Potential conflicts with <br />existing utilities will be shown on profiles with approAmate location of utilities, per the utility agencies readil y available <br />reDord drawings, Storm draln plans will he prepared at a scale of 14 = 20'horizontal and I " = 4'vedlool for profiles. <br />0011voro bles: V16, 60%, and Fin a/ Plans, Aflorostation V81 and PDP (final plans will b a sealed an d <br />0 <br />signed), and wponses to previous review sornments from the City <br />Task 14: Street L and Electrical Plans �qpqqn P) <br />... ... <br />'�Im- *h' <br />le"y"-H"o"n'i w-III pr'e' p-a"r'e"etroet-lig t"pia"n-s"for"i h*'ff pr'o' je-o' i., li'la n a wl If In*a, o*rpo rate street I Ightin g a I o ng both sides o f the <br />street. We will cobtucl voltage drop calculations W.datermine the Wiring sizes, Pad of this task will. Include coordination <br />C <br />with Southern California Olson to determine now and existing Service polml& We will provide a photemetr1oanalysIs to <br />determine requiredillumination for this corridon <br />0 <br />Deliverables:00%, e0yo, and Final Plans, electronic files In Microstallon Vill and PDF (final plans will be seated and <br />( ) i <br />signed), an d responses to previous review comments from th 6 Clty� <br />("t <br />Task" I &.7raMic Siqn&1,Plans,(0p1ion.B), ...................... ............................................... ............ <br />Ww"ii 4-a'w-Improvements along project Oita. Installationof closscl-droull <br />television (CCTV), video detection, conduits, and cables or modification of existino communication systems Is anticipated <br />within the project jimilts and will be shown on the traffic signal plans. Plans will show the connection to each signalized <br />Intersection withinthe project. limits. Pull.box details and modifloationof conduit sweeps for the signal Interconnectara <br />Included. The traffic signal modification plan will be prepared In accordance with current City and Caltrans standards and <br />will be prepared at a scale of V x 20'. <br />Dollverables., 30%, 60%, and Final Plans, electronic files In Microstation V81 and POP(linal plans will be sealed and <br />slVnod), and responses to previous review comments from the Ofty. <br />Task 16: Specfflcatlons.(q��iT�,�.and B) ............................................... ................................ <br />'w"ll <br />r*n' I p'r*e'p-s-r'e-ie-c'h-n' lo-a'l spedficallons based upon the boiler plate supplied by the City, Bid Items will be <br />described as reasonably required In the General Provisions and will be Included In the Contractor's bid list. References for <br />the technical provisions to the City's Standards and Standard.Speolficatlons for Public Works Construction (Greenbook), <br />Coltrane, or other appropriate specifications will be shown. <br />Dollvorablas;.M, 6OY9, and Final Specifications, alectronlo files In PDF and word format (final specifications will be <br />sealed andsigned), and responses to previous review comments from the City, <br />Task 17: Opinion of Probable Construction Cost (Options A and 8) <br />... .... —.; ... ........ ................ ....... .................. I ......... ---. ...... — ...... .... 111.11.11.1111, ...... <br />Klmley-Horn will prepare an Opinion of Probable Construction Costs (Estimate) based on quantities, for comparison to <br />project budget and assist during the Contractor's bidding process. Unit prices will be derived from readily available current <br />bid Information based on similar projects within the area. Backup will be generated for lump sum Items. Contingencies will <br />be shown, as agreed upon with City staff. <br />Defivemblas: 30%, 60, and Final Estimates, electronic files In PDF <br />Kimley*Horn 18 TROO77025.171 GUY at Sputa Ann <br />25E-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.