Laserfiche WebLink
Task 18., Potholing (OptionsAiand,§ .............................................................................................. <br />&*rie-a to pos I Ova ly Ident If y Ut. I I It I a$ Where COnfl I C16 may exist . Th Is to sk on t a I Is <br />potholeswith a dopith of up to 1,5 feet, PotholinginformatIonwill be used to Identi(ypotentlal conflotswith traffic signal <br />footings, now Catch baslM, wall foolings, and water quality devices, <br />Deliverable$., Pothofing report <br />Task 19,� Bid Phaso Support (Options A and 8) <br />I(Imley-Hom will provide support during the bid phase by responding In writing to Rogitasts for Information (RFI)/ <br />Clarifications. Out team will Mist ftChy In the Issuance of addenda to the bid packagewhichconsists; of making design <br />changes determined necessary to address Clarifications. <br />Dollyorabloc Responses to RPIs, oesion revision; <br />7bsk 20.,, Construction Sopport (P�fions.A.and B) <br />�im- Ie"Y--'H' -o' m* .... w'! 11' 'a*s-s' Is' t"i ihs, '0" liy' 'o-o*n' struct'll'o-m-ph a'se,by'i'Bspo n'd I n'g' to' tihe"Controol'or's, 'R'Fls',' pre'pa N*n g, 'a'd' do'n'dIa <br />and providing clarifications, This task Includes reviewing theOonthaotors change orders and Changed Conditions In the <br />field, We will prepare rocord drawings by updating the Approved design drawings based on one set of redlIne markups <br />provided by the Contractor or Oty staff. The purpose of the record drawings Is to create a deliverable that will represoot the <br />built Condition for tie Clt�s records, as. recorded by the Contrector, Independent verification Is act Included In this scopa� <br />Dativerables., Record Dra wings., One hardoopy and on & electronic (PDF form at an d Microstallon M). <br />Schedule <br />The draft schedulapt) the. following pag# contain g1he tasks outlined -with [.41ho scope of work.; as well as reopssary <br />agency review periods, Relationships are assigned to each task representing a logical progression end allowing easy <br />Identification of tasks that could constrain the project. Note that task durations and agency review periods are realistic <br />based on our recent experience on similar projects. Our Intent Is to review this draft target schedule with you at the <br />kick -.off meeting for each project, make any desired adjustments, and track as a progress schedule during the project by <br />providing updates on a monthly basis. <br />See separate sealed envelope for our hourly rate schedules, <br />City of Santa Ann I T80077025.17 119 KWIPAY >>>Horn <br />25E-34 <br />