|
and lies shown his commitment to getting projects done In 0 tlm�ly manner.
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, Montane State University
<br />Registered Professional Engineer In Arlzorto.(4043306), California (#75462), and North Carolina (#WD.483)
<br />American Society of.Civil Engineers, Member
<br />Relevant Experienre
<br />• Santa Rose Road Widening Project, Camarillo,
<br />CA — Project EnginQor
<br />• A. E. Wright Midd(le School Pedestrian Bridge,
<br />Calabasas, CA -- Projeot Engineer
<br />• Advanced Transportation Management and
<br />Information and Security System (ATMIS), Port
<br />of Long Beach, CA — Project Engineer
<br />• Agoura Road Widening Project (Complete
<br />Streets), Agoura Hills, CA — Project Engineer
<br />• 11 th Avenue Improvements (part of the
<br />Downtown SRT Stations project), San Diego,
<br />CA — Project Engineer
<br />• 17316 W. Sunset Blvd. Renovation Project (J
<br />Paul Getty), Pacific Palisades, CA — Project
<br />Engineer
<br />• Interchange Improvements for 1-216 at Cactus
<br />Avenue PSR, Moreno Valley, CA — Project
<br />Engineer
<br />• Broadway Plaza Parking Study, Wpinut Creek,
<br />CA — Project Engineer
<br />.4 Calaveras Sidewalk Improvements, Mllpftas,
<br />CA — Project Engineer
<br />A $ANDAG, Broadway Corridor/BRT Station
<br />Engineering and Environmental Compliance
<br />(CEQA), San Diego, CA — Project Engineer
<br />i m lenny, A) H o r n
<br />• SANDAG, Final Design of tile South Line Freight
<br />Roll Improvements, Son. Diego, CA — Project
<br />Engineer
<br />A I-5/Genesee PRIED, PS&E, and QQnmrudon
<br />Ph64e Services (CPS), San Diego, CA
<br />Project Engineer
<br />• SANDAG/MTS Light Rell Transit (LRT) Renewal
<br />Project — Blue Line Stations, $an Diego, CA
<br />Project Engineer
<br />• Graton Casino - Wilfred Avenue Off -Site
<br />Improvements, Rohnert Park, CA — Project
<br />Engineer
<br />• 1-21 5/Van Buren Blvd Interchange PA&ED and
<br />PS8;E Phases, Riverside County, CA — Project
<br />Engineer
<br />• City of Rocklin, Farron Street Pedestrian Bridge,
<br />Rocklin, CA — Project Manager
<br />.4 Lincoln On;Call Services, Lincoln, CA — Project
<br />Engineer
<br />• Los Angel", Upper 2nd Street Bridge Design,
<br />Los Angeles, CA — Project Engineer
<br />• City of Elk Grove, Preliminary Engineering for
<br />Inteninodal Rall Station, Elk Grove, CA —
<br />,Project Engineer
<br />• City of Folsom, Johnny CasliTrall - Phase Two,
<br />Folsom, CA — Project Engineer
<br />G
<br />C)
<br />0
<br />0
<br />0
<br />C)
<br />0
<br />0
<br />?
<br />25E-67
<br />
|