Laserfiche WebLink
Chris Isero wEal EED AP <br />STRUCTURAL SERVICES TASK MANAGER <br />Chris has nearly 15 years of experience on a variety of projects, Including building <br />structural and pavement assessments, parking facility design and rapalr,vohloulir <br />slid pedestrian bridge design and repoircolvert design, roadwaylstreatsoape <br />Improvements, and Other ancillary troosportatipri suppottiiftiatures, Chris' respqnsill Hiles hove Included <br />im"n o"O" 0 'o"9n, Tuo"On Of plans and and colei"' ' o"On phase 8orv'ps$ to' a <br />act types. His 00 on assessment exporlon Q encompasses structures of <br />0 ran 0 Of ro $191, Ol <br />"Id I p I <br />r 0 <br />11brood concrete a 8. tj proWresseo concrete, posignsloned ooncrotoand stru aturol steel for a <br />wide variety of project and ollent types, Chris also recognize$ to cornaletion beWoon sustaina6ility and <br />practicalityAW applies this to every project. <br />Professional Credentlials <br />Master of and Bachelor of Science, Civil Engineeeing, Clemson University <br />Profess ...... I Vnginser In CA,08017), 80 (#280q$)' NO (#3rG.l 11), TN (#000278) <br />LEED AP (Leadership In Energy and Environmental OesI06), <br />American Society of Civil Engineers, Member <br />International Parking institute, Advisory Coupd, 8ustahablifty Committee, Consultants Committee <br />Green Parking Council, Crodentiallng Committee <br />Relevant Experience <br />• BiyroldeDistrict, Jrd Street Promenade <br />Down( . own Parking Study, Santa Monica, CA -- <br />Project Englneer <br />• Firestone Boulevard Improvements, Buena <br />Park, CA— Project Manager <br />• City of Anaheim, Gone AUtryWay Improvements <br />(t-5 to Soto College Blvd.) & State College Blvd, <br />Improvements (West Side), Analieli n, CA <br />.4 Pavement Rehabilitation. (Task Order Under On - <br />Call), Pomona, CA — Project Manager <br />A Traffic Flow Improvement Study of Artesia <br />Boulevard from 1-6 to Beach Boulevard, Buena <br />Park, CA — Project Manager <br />,d C Gold Line DeEilgn.Bulld Wayside Energy <br />Storage Substructure (WE$$) Project, Los <br />Angetes, CA — Project Engineer <br />.A 06mprohoholve ParkIng Analysis, Santa Ana, <br />CA — Project Engineer <br />• California State University -Long Beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />• City of Buena Fork, SR 91/13each Blvd WS Exit <br />Ramp, Buena Perk, CA — Project Manager <br />• Patton Street Pocket Park (Parka for People), <br />Los Angeles, CA — Project Engineer <br />,d CSU Long Beach, East Campus Road - Safety <br />Improvements, Long Beach, CA — Q0/QA <br />Reviewer <br />4 Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA -- <br />Projectmenager <br />At East Coast Highway Signal Rehab Design, <br />Newport Beach. CA — Project Director <br />• ValleyTronsportatlon Authority PARCS, Silicon <br />Valley, CA — Project Enginear <br />• Sonia Fe Christian School Parking Deck, Solana <br />Beach, CA —Project Engineor <br />• Serryessa Station Parking Structure, Son Jose, <br />CA — Project Engineer <br />• California State University, Socramento Parking <br />Structure Condition AaseMqrnbnts. Saoromento, <br />CA — Project Engineer <br />• Lower Pacific Avenue Parking Study, Santa <br />Cruz, CA — Project Engineer <br />• Milpitas Station Pedestrian Bridge over <br />Montague Expressway, Milpitas, CA — Project <br />Engineer <br />• Richmond Transit Village Parking Garage <br />(BART), Richmond, CA — Project Engineer <br />Kimley)))Horn <br />25E-68 <br />