|
Chris Isero wEal EED AP
<br />STRUCTURAL SERVICES TASK MANAGER
<br />Chris has nearly 15 years of experience on a variety of projects, Including building
<br />structural and pavement assessments, parking facility design and rapalr,vohloulir
<br />slid pedestrian bridge design and repoircolvert design, roadwaylstreatsoape
<br />Improvements, and Other ancillary troosportatipri suppottiiftiatures, Chris' respqnsill Hiles hove Included
<br />im"n o"O" 0 'o"9n, Tuo"On Of plans and and colei"' ' o"On phase 8orv'ps$ to' a
<br />act types. His 00 on assessment exporlon Q encompasses structures of
<br />0 ran 0 Of ro $191, Ol
<br />"Id I p I
<br />r 0
<br />11brood concrete a 8. tj proWresseo concrete, posignsloned ooncrotoand stru aturol steel for a
<br />wide variety of project and ollent types, Chris also recognize$ to cornaletion beWoon sustaina6ility and
<br />practicalityAW applies this to every project.
<br />Professional Credentlials
<br />Master of and Bachelor of Science, Civil Engineeeing, Clemson University
<br />Profess ...... I Vnginser In CA,08017), 80 (#280q$)' NO (#3rG.l 11), TN (#000278)
<br />LEED AP (Leadership In Energy and Environmental OesI06),
<br />American Society of Civil Engineers, Member
<br />International Parking institute, Advisory Coupd, 8ustahablifty Committee, Consultants Committee
<br />Green Parking Council, Crodentiallng Committee
<br />Relevant Experience
<br />• BiyroldeDistrict, Jrd Street Promenade
<br />Down( . own Parking Study, Santa Monica, CA --
<br />Project Englneer
<br />• Firestone Boulevard Improvements, Buena
<br />Park, CA— Project Manager
<br />• City of Anaheim, Gone AUtryWay Improvements
<br />(t-5 to Soto College Blvd.) & State College Blvd,
<br />Improvements (West Side), Analieli n, CA
<br />.4 Pavement Rehabilitation. (Task Order Under On -
<br />Call), Pomona, CA — Project Manager
<br />A Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-6 to Beach Boulevard, Buena
<br />Park, CA — Project Manager
<br />,d C Gold Line DeEilgn.Bulld Wayside Energy
<br />Storage Substructure (WE$$) Project, Los
<br />Angetes, CA — Project Engineer
<br />.A 06mprohoholve ParkIng Analysis, Santa Ana,
<br />CA — Project Engineer
<br />• California State University -Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />• City of Buena Fork, SR 91/13each Blvd WS Exit
<br />Ramp, Buena Perk, CA — Project Manager
<br />• Patton Street Pocket Park (Parka for People),
<br />Los Angeles, CA — Project Engineer
<br />,d CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA — Q0/QA
<br />Reviewer
<br />4 Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA --
<br />Projectmenager
<br />At East Coast Highway Signal Rehab Design,
<br />Newport Beach. CA — Project Director
<br />• ValleyTronsportatlon Authority PARCS, Silicon
<br />Valley, CA — Project Enginear
<br />• Sonia Fe Christian School Parking Deck, Solana
<br />Beach, CA —Project Engineor
<br />• Serryessa Station Parking Structure, Son Jose,
<br />CA — Project Engineer
<br />• California State University, Socramento Parking
<br />Structure Condition AaseMqrnbnts. Saoromento,
<br />CA — Project Engineer
<br />• Lower Pacific Avenue Parking Study, Santa
<br />Cruz, CA — Project Engineer
<br />• Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, Milpitas, CA — Project
<br />Engineer
<br />• Richmond Transit Village Parking Garage
<br />(BART), Richmond, CA — Project Engineer
<br />Kimley)))Horn
<br />25E-68
<br />
|