|
01
<br />V4 *
<br />w'TWINING
<br />Paul Soltis., PE, GE, Senior Geotechnical Engineer
<br />Paul Soltis, 109,0E, 'brings more than24 years of technical expertise to TwWrill. His experience
<br />Includes gooteolmical Investigations andanalyses relative to roads, bridges, highwaysi and other
<br />California Infrastructure projecis, His focus Is on Interaction With the design team during
<br />development of comtruotRin documents to oohlova the most appropriate foundation type and most
<br />efficient 0119 Paul has extensive on�psll contract management experience
<br />and tho proven ability to simultaneously maintain Apdmgnage multiple projepts, P;ql Is
<br />responsible fi��tho toohnlW ova�slqht of ihe firm's goplochnioal projects and management of the
<br />RMA's. gootoohnioal personnel,
<br />overview
<br />In the lndO&try since 1093
<br />Joined Twining In 2006
<br />Current Lioness Hold
<br />0 Professional Engineer, 01VII, CA, 56140
<br /># RegleteredGeote.ohnicaIC-nqineer,CA,GE2606
<br />Education
<br />M8, Goolochnical EngInearfng, University of Colorado, Boulder, CO
<br />BS, Civil Engineering, California Polytechnic State University, Sao Luls Obispo, CA
<br />Project EXPerlence Summaries
<br />City of Long Beach, Studebaker Road Pavement Evaluation Serving as GootachnIcal
<br />Engineer, Paul provided engineering oversight to ensure the.0ity's expectallQns were met on this
<br />0.5-mile stretch of Studebaker Road In the City of Long Beach, The surface condition assessmant
<br />was performed following the Caltrans, Flexible Pavement Rehabilitation Manuel. Boring and
<br />coring were performed to Investigate the subsurface condition of.the rood. Based on collected
<br />information, different rehabilitation strategies were calculated and recommended to the City of
<br />Long Beach, Including Cold In -Place Recycled Asphalt Concrete Pavement and Cement
<br />Stabilized Pulverized Boss�
<br />LADPW, Do] Amo Boulevard Improvements This project consisted of extracting asphalt
<br />concrete cores and developing a cold recycling mix design using the collected materials. The
<br />thickness of the existing asphalt concrete and base was recorded. The extracted materials were
<br />returned to Twining's Long Beach laboratory for evaluation In order to develop a cold recycling
<br />mix.deaIgn. In addition to developing the mix design, Twining served as the quality assurance
<br />testing laboratory during construction, Paul providedgeotochnicall oversight throughout this
<br />project, assisting with the Investigation and identification of soft subgrade soils that were
<br />discovered during construction.
<br />County of San Bernardino, On -Call Goolochnical Engineering Services Paul Is currently the
<br />project manager for this contract and provides monitoring, sampling, testing, reporting and
<br />contract compliance enforcement for construction concrete, quality control compliance of steel,
<br />reinforcing steel, wood, roofing material, brick, masonry, material quality control of asphalt and
<br />concrete paying and road construction materials, compaction testing, R-value, aggregate
<br />analysis, sieve analysis, gradation classification, moisture content, and shear analysis.
<br />25E-71
<br />G
<br />6
<br />G
<br />0
<br />(1,
<br />I
<br />
|