Laserfiche WebLink
wo"'TWINING <br />III <br />Dr. AmIr Ghavibazoo Is the Senior Pavement Engineer at Twining, [no; He diroots and works on <br />pavement design, highway design, and engineering OurlahIs Orodupte study, Amir <br />obtained Olensive knowledge and expertise oft Payment Manegement. i ysteMs (Mloropovor), <br />PaVomont Evafuetionand Pavement Rehat;I11taflon Strategies, He Is on OX art In calculating Pavement <br />Condition "Illy (100) thioulJh visual Inspection following the United.Sl ?Army Corps of Engineers' <br />methodology, 014 well as conducting Life Cycle Cast Analysis (LOCA) rehabilitation strategies for <br />pavements. Amir has extensive practical experience In asphalt pavement engineering Including <br />pavement desiginj rehablIllation, preservation, pavement management, materials, and construction. His <br />experience includss.the characterization of rubberized asphalt binders and developing mix designs <br />following Suporpove specifications. He works closely with cities and government agencies to develop <br />unique and specialized mix doslgns� pavement constructions Inspections, and pavement design <br />solutions. <br />Overview <br />In the Industry since 2014 <br />.Joined Twining In 2014 <br />Education <br />Ph,p. In Civil and Environmental Engineering <br />North Dakota State University <br />Master of golance, In Railways Engineering <br />Iran University of Science and Technology, Tehran, Iran <br />ProjectlExperlonco Summaries <br /># City of Huntington Beach, Nichols Lane Rehabilitation TwInIngperformed Inspection and <br />material testing on this project. Amir served as project manager to assure 11-to quality of the job <br />that was being delivered to the City, He oversaw the material sampling and testing and provided <br />technical oornments to the City. He. was else responsible for developing Comoot-treated $oil mix <br />design for the City. <br />0 City of Claremont, Foothill Boulevard Improvement Twining performed pavement evaluation <br />on approximately four lone miles of Foothill Boulevard In the City of Claremont to recommend <br />repair and rehabilitation strategies for the pavement, AmIr served as senior pavement engineer, <br />coordinating the required lesling and preparation of the final recommendation and design. <br />several alternative options were provided to the City, Including mIll and overlay, Cold InAace <br />recycling, reconstruction, and soll stabillkation. <br />a Pavement Evaluation & Repair Recommendations at Various Parks Twining performed <br />network level pavement evaluation on approximately 20 lane miles of road In various park$ of <br />Forest Lawq In Southern California to develop a 5-year plan for rehabilitation of the road network. <br />AmIrwas the lead Pavement Engineer on this project, coordinating all required surface evaluation <br />tasks, data collection, and preparation of the final report. <br />0 City of El Monte, Ramona Boulevard Resurfacing Pavement Evaluation This project <br />consisted of repairing the PS&E and related construction documents for the 2014- 2015 STP-L <br />Ramons Boulevard Street Resurfacing project. Twining performed geoteohnical pavement <br />swatnAfinng Pind rAhAhIlUtinn rAnnnirnnnrlFifinnst for thiq nrnind AnVr.%ArvArI Fiq thA nAVAMAIlt <br />25E-70 <br />